863_drawings.pdf

PDF 3 MB Posted

Attached to
Sand Creek Surfacing Rock Replacement
Solicitation number
AG-67T0-S-15-0044
Issued by

About this file

Drawings

View the file

Other files

File Type Posted
Amendment_1.doc DOC document
Amend._1_Note_replacement.pdf PDF
SOL.docx DOCX document
Instruction_Sheet.doc DOC document
SF-1442.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MP/Station Units

TONS

Grading Spec.

Feature Lengt h in Feet

DESCRIPTION OF WORK 863.1

FDR 863

79+20 B.O.P. Sta 79+20

BEGIN RECONDITIONING - SPEC. 303(01) TO E.O.P.

Rebuild Ditches and Clean All Culverts and cattleguards as needed Begin clearing both sides of road to 205+00 Clearing shall remove all small trees and brush up to 6 inches in diameter. Larger remaining trees will have all overhanging branches trimmed flush to a height of 15 feet above finished road bed elevation.

Maximun stump height for larger trees shall be 8 inches and small trees and brush 2 inches.However, remove stumps of any tree cleared if the is within the road travelway,shoulder, turnouts.curve widening, ditch slope, or is in a location where a vehicle tire could impact the stump.

Clearing shall be a minimun of 6 feet from each shoulder or top of cut slope or toe of fill whichever is the further distance.All costs for this work are included in item 303(18)

4,200 J BEGIN AGGR Grading J 4" COMPACTED DEPTH TO EOP

124+80 CMP Install 18"x36 ft culvert

130+00 680 pit run Begin pit run taper to 20 " @ sta 131+50

131+50 Begin 20" depth pit run

132+50 CMP Install 24"x38ft Culvert

133+00 Begin pit run taper down to sta 134+50

205+00 End of Project

OPTIONAL BID ITEM

RECONDITIONING- SPEC 303(01) 0 to 2.5 Mi as awarded

Begin clearing clearing both sides of road to be marked by Engineer Clearing shall remove all small trees and brush up to 6 inches in diameter. Larger remaining trees will have all overhanging branches trimmed flush to a height of 15 feet above finished road bed elevation.

Maximun stump height for larger trees shall be 8 inches and small trees and brush 2 inches.However, remove stumps of any tree cleared if the is within the road travelway,shoulder, turnouts.curve widening, ditch slope, or is in a location where a vehicle tire could impact the stump.

Clearing shall be a minimun of 6 feet from each shoulder or top of cut slope or toe of fill whichever is the further distance.All costs for this work are included in item 303(18) (Note - optional work will be awarded before base contract is complete.)

0 to 4550 J Aggr Grading J 4" compacted depth stations to be marked by Engineer

DESCRIPTION OF WORK Sand creek surfacing rock replacment Page 11 of 11

MP/Station Units

TONS

Grading Spec.

Feature Lengt h in Feet

DESCRIPTION OF WORK 863.1

DESCRIPTION OF WORK Sand creek surfacing rock replacment Page 11 of 11

title sheet
Index to pages (2)
Forest location map (3)
FDR 863 Surfacing Layout (4)
Project Notes (5).1pdf
Pay item notes (6)
156-01_const_signs Model (7)
Temporary traffic control typical (8)
Culvert bedding details typical (9)
Typical surfacing sections (10)
desc_of_work.pdf (11)