Forest Service Supplemental Specifications

Table of Contents

Table of Contents Preface 101 - Terms, Format, and Definitions

101.01 Meaning of Terms

101.03 Abbreviations

101.04 Definitions

102 - Bid, Award, and Execution of Contract 102 Bid, Award, and Execution of Contract

103 - Scope of Work Deletions

104 - Control of Work Deletions

104.06 Use of Roads by Contractor

105 - Control of Material

105.02 Material Sources

105.02(a) Government-provided sources

105.05 Use of Material Found in the Work

106 - Acceptance of Work

106.07 Delete

107 - Legal Relations and Responsibility to the Public

107.05 Responsibility for Damage Claims

107.06 Contractor’s Responsibility for Work

107.09 Legal Relationship of the Parties

107.10 Environmental Protection

108 - Prosecution and Progress 108 Delete

109 - Measurement and Payment 109 Deletions

109.02 Measurement Terms and Definitions

154 - Contractor Sampling and Testing 155 - Schedules for Construction Contracts

155 Delete 171 - Weed and Disease Prevention 201 - Clearing and Grubbing

201.01 Description

201.04 Clearing. (c)

253 - Gabions and Revet Mattresses 303 - Road Reconditioning

303.10 Measurement…………………………………………………………………..25

308 - Minor Crushed Aggregate 602 - Culverts and Drains

602.03 General

625 - Turf Establishment

625.03 General…………………………………………………………………..….…30

625.07 Seeding. (a) Dry method…… . ……………………………………………….30

Mowing and Limbing………………………………………………………………….…32 Typicals Drawings…………………………………………………………………..…

Preface Preface_wo_03_15_2004_m

Delete all but the first paragraph and add the following:

The Forest Service, US Department of Agriculture has adopted FP-03 for construction of National Forest System Roads. This can be found at this website http://flh.fhwa.dot.gov/resources/pse/specs/

101 - Terms, Format, and Definitions 101.00_nat_us_07_25_2005

101.01_nat_us_01_22_2009

101.01 Meaning of Terms

Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications.

101.03_nat_us_06_16_2006

101.03 Abbreviations.

Add the following to (b) SI symbols:

mp Milepost ppm Part Per Million

101.04_nat_us_03_29_2007

101.04 Definitions.

Delete the following definitions and substitute the following:

Bid Schedule--The Schedule of Items.

Contractor--The individual or legal entity contracting with the Government for performance of prescribed work.

Right-of-Way--A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.

Add the following:

Adjustment in Contract Price--“Equitable adjustment,” as used in the Federal Acquisition Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.

Change--“Change” means “change order” as used in the Federal Acquisition Regulations.

Design Quantity--“Design quantity” is a Forest Service method of measurement from the FS-96 Forest Service Specifications for the Construction of Roads and Bridges. Under these FP specifications this term is replaced by the term “Contract Quantities”.

Forest Service--The United States of America, acting through the Forest Service, U.S.

Department of Agriculture.

Protected Streamcourse--A drainage shown on the plans or timber sale area map that requires designated mitigation measures.

Road Order--An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.

Schedule of Items--A schedule in the contract that contains a listing and description of construction items, quantities, units of measure, unit price, and amount.

Add Figure 101-1—Illustration of road structure terms:

Figure 101-1—Illustration of road structure terms.

102 - Bid, Award, and Execution of Contract 102.00_nat_us_02_16_2005

102 Bid, Award, and Execution of Contract

Delete Section 102 in its entirety.

103 - Scope of Work 103.00_nat_us_02_16_2005

Deletions

Delete all but subsection 103.01 Intent of Contract.

104 - Control of Work 104.00_nat_us_06_16_2006

Deletions

Delete Sections 104.01, 104.02, and 104.04.

104.06_nat_us_02_17_2005

Add the following subsection:

104.06 Use of Roads by Contractor

The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.

105 - Control of Material 105.02_nat_us_01_18_2007

105.02 Material Sources.

105.02(a) Government-provided sources.

Delete Section 105.02

105.05_nat_us_05_12_2004

105.05 Use of Material Found in the Work.

Delete 105.05 (a) and (b) and the last sentence of the second paragraph.

106 - Acceptance of Work 106.07_nat_us_05_11_2004

106.07 Delete

Delete subsection 106.07.

107 - Legal Relations and Responsibility to the Public 107.05_nat_us_05_11_2004

107.05 Responsibility for Damage Claims.

Delete the entire subsection.

107.06_nat_us_06_16_2006

107.06 Contractor’s Responsibility for Work.

Delete the following from the first paragraph.

“except as provided in Subsection 106.07”.

107.09_nat_us_06_16_2006

107.09 Legal Relationship of the Parties.

Delete the entire subsection.

107.10_nat_us_06_16_2006

107.10 Environmental Protection.

Add the following:

Design and locate equipment repair shops, stationary refueling sites, or other facilities to minimize the potential and impacts of hazardous material spills on Government land.

Before beginning any work, submit a Hazardous Spill Plan. List actions to be taken in the event of a spill. Incorporate preventive measures to be taken, such as the location of mobile refueling facilities, storage and handling of hazardous materials, and similar information. Immediately notify the CO of all hazardous material spills. Provide a written narrative report form no later than 24 hours after the initial report and include the following:

• Description of the item spilled (including identity, quantity, manifest number, and other identifying information).

• Whether amount spilled is EPA or state reportable, and if so whether it was reported, and to whom.

• Exact time and location of spill including a description of the area involved.

• Containment procedures.

• Summary of any communications the Contractor had with news media, Federal, state and local regulatory agencies and officials, or Forest Service officials.

• Description of clean-up procedures employed or to be employed at the site including final disposition and disposal location of spill residue.

When available provide copies of all spill related clean up and closure documentation and correspondence from regulatory agencies.

The Contractor is solely responsible for all spills or leaks that occur during the performance of this contract. Clean up spills or leaks to the satisfaction of the CO and in a manner that complies with Federal, state, and local laws and regulations.

108 - Prosecution and Progress 108.00_nat_us_02_16_2005

108 Delete.

Delete Section 108 in its entirety.

109 - Measurement and Payment 109.00_nat_us_02_17_2005

109 Deletions Delete the following entire subsections:

109.06 Pricing of Adjustments.

109.07 Eliminated Work.

109.08 Progress Payments.

109.09 Final Payment.

109.02_nat_us_06_16_2006

109.02 Measurement Terms and Definitions.

(b) Contract quantity.

Add the following:

Contract quantities will be adjusted only when there are errors in the original design of 15% or more.

154 - Contractor Sampling and Testing 154.01_nat_us_05_24_2005

154.01 Description

Delete the last sentence of the first paragraph.

155 - Schedules for Construction Contracts 155.00_nat_us_05_11_2004

155 Delete.

Delete Section 155 in its entirety.

171 - Weed and Disease Prevention 171.00_nat_us_03_30_2005

Description

171.01 This work consists of washing and treating construction equipment to remove seeds, plants, and plant fragments from the equipment before the equipment is used on National Forest System lands.

Material

171.02 Conform to the following Subsection:

Water 725.01

Construction Requirements

171.03 General . Notify the CO in writing at least 5 days before moving any construction equipment onto National Forest System lands. Construction equipment does not include cars, pickup trucks, and other vehicles that regularly travel between the construction site and areas outside of National Forest System lands.

Perform all work at a location designated on the plans or other locations approved in writing. Provide the CO with an opportunity to monitor the washing and inspection.

171.04 Equipment. Use a high pressure washing system.

For work on National Forest System lands, use a washing system that traps all wash water and either stores it for removal from National Forest System lands or recycles the water for continued use. If the equipment recycles the water, provide adequate filters for seed removal. Dispose of the filter material and removed seeds in an approved manner. Do not mix soaps, detergents, or other chemicals with the wash water.

For work at a commercial washing facility, use an approved facility.

171.05 Washing. Wash the sides, tops, and undercarriages of all construction equipment.

Remove all seeds, plants, plant fragments, dirt, and debris from the construction equipment.

171.06 Inspection. Inspect the washed construction equipment, including the undercarriage, to ensure that the washing removed the dirt, debris, and seeds from the construction equipment. Rewash the construction equipment as necessary or as directed.

171.07 Acceptance. Weed prevention will be evaluated under Subsection 106.02.

Measurement

171.08 Do not measure weed prevention for payment.

Payment

171.09 Include all costs associated with the Section 171-Weed Prevention as incidental to all other Pay Items.

201 - Clearing and Grubbing 201.01_nat_us_02_18_2005

201.01 Description

Replace with the following

This work consists of clearing and grubbing within clearing limits and other designated areas.

201.04_nat_us_02_22_2005

201.04 Clearing. (c)

Delete paragraph (c) and replace with the following:

(c) In areas outside the excavation, embankment, and slope rounding limits, cut stumps to within 12 inches or one-third of the stump diameter of the ground, whichever is higher, measured on the side adjacent to the highest ground.

201.04 Clearing.

Delete subsection (d) and replace with the following:

(d) Do not cut vegetation less than 3 feet tall and less than 3 inches in diameter, that is within the clearing limits but beyond the roadway and not in a decking area, and that does not interfere with sight distance along the road.

Add the following:

(e) Trim branches of remaining trees or shrubs to give a clear height of 14 feet above the roadbed unless otherwise indicated. Trim tree limbs as near flush with the trunk as practicable.

204 – Excavation and Embankment

204.11 Compaction

Delete and Add the following:

(a) Compact by operating construction equipment on full width of surface in 6” lifts until visual displacement ceases. Moisture may be needed if determined by visual inspection.

(b) Compact the aggregate by operating compaction equipment over the total width until visible deformation ceases. A minimum of three complete roller passes shall be made at a moisture content suitable for compaction.

Section 253. - Gabions and Revet Mattresses

253.01 Add the following:

This work also includes the installation of articulated concrete block revetment mat.

Cellular Concrete Block 725.10 Revetment Cable 709.02 Geotextile type IV 714.01

253.03 General. Delete the first sentence and substitute the following:

Survey according to Section 152 and verify the limits of the structure.

253.05 Structure Erection. Add the following to the first paragraph:

For gabion structures, grade the foundation for a width equal to the width of the gabion plus 2 feet. Where gabions are set on rocky foundations, place 6 inches of select granular backfill under the baskets.

253.08 Revet Mattresses. Add the following:

(a) Design Prefabricate articulated concrete block revetment mat as an assembly of concrete blocks, with specific hydraulic capacities, laced with revetment cables. Articulated concrete block revetment mat may be assembled on-site. The concrete cells or blocks may be open or closed as described and may vary in dimension. The blocks will be square and should not be less than 8” or more than 16” in dimension. The open cell units have two (2) vertical openings of rectangular cross section with sufficient wall thickness to resist breakage during shipping and installation. Secure all blocks in any given mat with a minimum of two (2) cables each.

Incorporate interlocking surfaces of each block that minimize lateral displacement of the blocks within the mats when lifted by the longitudinal revetment cables.

Interlocking surfaces must not protrude beyond the perimeter of the blocks to such an extent that they reduce the flexibility or articulation capability of the cellular mats or become damaged or broken when the mats are lifted during shipment or placement. Once in place the interlocking surfaces of the mats shall minimize the lateral displacement of the blocks even if the cables should become damaged or removed. A minimum of 18° between any given row or column of blocks in the uplift direction and a minimum of 45° in the downward direction must be maintained in the mats. Insert cables into the mats allowing for lifting loops at one end of the mat with the corresponding cable ends spliced together to form a lifting loop at the other end of the mat. Insert cables after sufficient time has been allowed for the concrete to complete the curing process. Place the articulated concrete block revetment mat on the filter fabric.

(b) Physical Requirements

PHYSICAL REQUIREMENTS

(c) Grading

Grade the slope to a smooth plane surface to achieve good contact between the slope face and the geotextile, and between the geotextile and the entire bottom surface of the articulated concrete blocks. Remove or re-grade slope from all deformities, roots, grade stakes, and stones which project normal to the local slope face. Place compacted homogenous material to fill all holes, “pockmarks”, slope board teeth marks, footprints, or other voids greater than 1.0 inch in depth normal to the local slope face. Place compacted homogenous material to fill all grooves or depressions greater than 0.5 inches in depth normal to the local slope face with a dimension exceeding 1.0 foot in any direction. Uniformly compact the slope and slope face as directed by COR. Excavate and prepare anchor trenches, flanking trenches, and toe trenches or aprons according to the plans. Uniformly grade the anchor trench hinge-point at the top of the slope to prevent dips or bumps greater than 0.5 inches over or under the local grade. Uniformly grade the anchor trench hinge-point to the width that allows good contact between the articulated concrete blocks and the underlying grade at the hinge point. Obtain approval of the subgrade from the COR prior to placement of filter fabric and articulated concrete blocks.

Compressive Strength Net Area Min. p.s.i.

Water Absorption Mx. Lb/ft3

Avg. of 3 units Individual Unit Avg. of 3 units Individual Unit

4,000 3,500 9.1 11.7

(d) Placement

Place the articulated concrete blocks on top on the subgrade. No individual block within the plane of placed articulated concrete blocks shall protrude more than one inch or as otherwise specified by the COR. If placed as a large mattress, use a spreader bar or other approved device to lift and place the mats in the proper position with a crane or other approved equipment. Place mats side-by-side and/or end-to-end so that they abut one another. The mats shall be laid from the downstream end of project to the upstream end, so the geotextile joints are shingled to direct flow over the joint and to prevent undermining. Intimate contact with the subsurface is critical to the systems performance in the field. The gaps between each mat shall not be greater than 2 inches. The upstream two (2) rows of each mat system shall be entrenched and buried at a 45° downward direction into the ground. Type 2 riprap shall be used to fill the entrenched edge. Backfill the trench flush with the top of the blocks.

253.09 Acceptance. Delete the second paragraph and add the following:

Material for gabion structures and revet mattresses will be evaluated under Subsections 106.02,106.03, and the following:

(a) All units shall be sound and free of defects that would interfere with either the proper placement of the unit or impair the performance of the system. Surface cracks incidental to the usual methods of manufacture, or surface chipping resulting from customary methods of handling in shipment and delivery, shall not be deemed ground for rejection. Cracks exceeding 0.25 inches in width and/or 1.0 inch in depth shall be deemed grounds for rejection. Chipping resulting in a weight loss exceeding 10% of the average weight of a concrete unit shall be deemed grounds for rejection.

303 - Road Reconditioning 303.00_01_us_10_11_2006

Delete Section 303 in its entirety and replace with the following.

303.01 This work consists of reconditioning ditches, shoulders, roadbeds, parking areas, turnouts, approach road intersections, cattleguards, asphalt surfaces and aggregate surfaces. Construct outslopes, clean and maintain all roadbed drainage structures.

303.02 Conform to the following Subsection:

303.03 Ditch Reconditioning. Remove all slide material, sediment, vegetation, and other debris from the existing ditches and culvert inlets and outlets. Reshape ditches and culvert inlets and outlets to achieve positive drainage and a uniform ditch width, depth, and grade.

Dispose of waste as directed by the COR.

303.04 Shoulder Reconditioning. Repair soft and unstable areas according to Subsection 204.07. Remove all slide material, vegetation, and other debris from existing shoulders including shoulders of parking areas, turnouts, and other widened areas.

Dispose of waste as directed by the COR.

303.05 Roadbed Reconditioning Repair soft and unstable areas according to Subsection

204.07. Remove all organic, deleterious material larger than 6 inches from the top 6 inches of subgrade. Dispose of waste as directed by the COR. Scarify, rip and shape the traveled way and shoulders. Remove surface irregularities and shape to provide a uniform surface.

Dispose of rock larger than 4 inches brought to the surface during scarification.

For portions of roads not requiring scarification, the roadbed may contain rocks larger than 4 inches provided they do not extend above the finished roadbed surface. Reduce in place or remove rock extending above the finished roadbed surface. Dispose of removed rock as directed by the COR.

Compact using the following method as specified:

(a) Compaction A. Operate equipment over the full width.

(b) Compaction B. Operate rollers over the full width of each layer until visual displacement ceases, but not fewer than three complete passes. Use rollers that meet the following requirements:

(1) Steel wheeled rollers, other than vibratory, capable of exerting a force of not less than 250 pounds per inch of width of the compression roll or rolls.

(2) Vibratory steel wheeled rollers equipped with amplitude and frequency controls with a minimum weight of 6 tons, specifically designed to compact the material on which it is used.

(3) Pneumatic-tired rollers with smooth tread tires of equal size that will provide a uniform compacting pressure for the full width of the roller and capable of exerting a ground pressure of at least 80 psi.

(c) Compaction C. Operate vibratory roller over the full width of each layer until visual displacement ceases, but not fewer than seven complete passes.

303.06 Aggregate Surface Reconditioning. Repair soft and unstable areas to the full depth of the aggregate surface and according to Subsection 204.07. Scarify to the depth of the aggregate surface or to a depth of 8 inches, whichever is less, and remove surface irregularities. Reshape, finish, and compact the entire aggregate surface according to Section 308.

303.07 Roadway Reconditioning. Perform all the applicable work described in Subsections 303.03 through 303.06.

Maintain the existing cross slope or crown unless otherwise shown on the plans. Establish a blading pattern that will retain the surfacing on the roadbed and provide a through mixing of the materials within the completed surface width.

Blade and shape the subgrade for both surfaced and unsurfaced roads when moisture content is suitable for compaction.

303.08 Pulverizing. Scarify the surface to the designated depth and width. Pulverize all material to a size one and one half times the maximum sized aggregate or to 1½ inches, whichever is greater. Mix, spread, compact, and finish the material according to Section 301.

303.09 Acceptance. Delete Table 303-1. Road reconditioning work will be evaluated under Subsections 106.02 and 106.04.

303.10 Measure the Section 303 items listed in the Schedule of Items according to Subsection 109.02 and the following as applicable.

Measure ditch reconditioning and shoulder reconditioning by the mile, by the station or foot horizontally along the centerline of the roadway for each side of the roadway.

Measure roadbed reconditioning, aggregate surface reconditioning, roadway reconditioning, and pulverizing by the mile, by the station, or by the square yard.

303.11 The accepted quantities will be paid at the contract price per unit of measurement for the Section 303 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.

303.11_nat_us_03_29_2005

308 - Minor Crushed Aggregate 308.00_01_us_10_11_2006

Delete section 308 in its entirety and replace with the following:

308.01 This work consists of furnishing and placing crushed aggregate for bedding, backfill and roadway aggregate course.

308.02 Conform to the following Subsections:

Crushed aggregate 703.06

308.03 Preparing Surface. Prepare the roadway surface on which aggregate course is placed as shown in the typical section and Description of Work.

308.04 Placing Crushed Aggregate.

(a) Roadway aggregate. Mix the aggregate and adjust the moisture content to obtain a uniform mixture with a moisture content suitable for compaction. Spread and shape the mixture on the prepared surface in a uniform layer.

Do not place the mixture in a layer exceeding 6 inches in compacted thickness. When more than one layer is necessary, compact each layer according to Subsection 308.05(a) before placing the next layer.

(b) Bedding and backfill aggregate. Place and shape the mixture in layers that, when compacted, do not exceed 6 inches in depth.

308.05 Compacting and Finishing Crushed Aggregate.

Delete and add the following:

(a) Roadway aggregate. Compact using the methods below, specified in the Schedule of Items.

(1) Method 1. Operate equipment over the full width of spread aggregate.

(2) Method 2. Compact the aggregate by operating compaction equipment over the total width until visible deformation ceases. A minimum of three complete roller passes shall be made at a moisture content suitable for compaction.

(b) Bedding and backfill aggregate. Compact in 6 inch lifts by using a Forest Service approved mechanical compactor until no visible deformation is observed over the entire area of aggregate.

308.06 Acceptance. Crushed aggregate will be evaluated under Subsections 106.02 and

106.03. Furnish a production certification including gradation and quality properties for each source.

Construction of roadway aggregate courses will be evaluated under Subsections 106.02 and 106.04. Method 2 compaction will be evaluated under Section 106.04.

Placement of bedding and backfill aggregate will be evaluated under Subsection 106.02 and Section 209.

Preparation of the surfaces on which crushed aggregate is placed will be evaluated under Section 303 and 209 as applicable.

308.07 Measure the Section 308 items listed in the bid schedule according to Subsection

109.02 and the following as applicable.

Measure crushed aggregate by the Ton as certified from the quarry.

308.08 The accepted quantities will be paid at the contract price per unit of measurement for the Section 308 pay item listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.

602 - Culverts and Drains 602.03_nat_us_09_06_2005

602.03 General.

Add the following:

Ensure that the final installed alignment of all pipe allows no reverse grades, and does not permit horizontal and vertical alignments to vary from a straight line drawn from center of inlet to center of outlet by more than 2 percent of pipe center length or 1.0 feet, whichever is less.

602.05_1005_us_08_01_2005

Delete the second paragraph and replace with the following.

Join pipe sections together with coupling bands according to AASHTO M 36 or M 196.

Limit the use of bell and spigot joints to slopes of 10% or less. Limit the use of bands with projections (dimpled) to slopes of 15% or less.

625 - Turf Establishment

625.03 General.

Delete the first sentence and add the following:

Apply turf establishment to portions of slopes, ditches, waste areas, and other disturbed areas within 14 days after being constructed to template lines unless otherwise specified in writing by the C.O..

625.04 Preparing Seedbed.

Delete the second sentence of the first paragraph.

Delete the third paragraph.

625.05 Watering

Delete the entire paragraph.

625.06 Fertilizing.

Delete the entire subsection and add the following.

Apply fertilizer having a chemical analysis as listed in (c) below by the following methods. Apply seed and fertilizer in one application.

(a) Dry Method. Apply the fertilizer with approved power driven seeders, drills, fertilizer spreaders or other mechanical equipment. Hand operated methods are satisfactory on areas inaccessible to mechanical equipment.

(b) Hydraulic method. Use hydraulic-type equipment capable of providing a uniform application using water as the carrying agent. Add fertilizer to the slurry and mix before adding seed.

(c) Chemical analysis. Apply fertilizer at the rate of 240 pounds per acre. Apply fertilizer having the following chemical analysis.

Nutrient Percent Nitrogen, N 27 Phosphorus, P2O5 10 Potassium, K 10

Fertilizer having a different chemical analysis may be used if approved in advance by the CO.

625.07 Seeding.

Delete the first sentence and add the following.

Apply seed mix shown in (c) below by the following methods.

(a) Dry method.

Delete the third sentence.

Add the following after subsection (b).

(c) Seed Mix. In terms of pure live seed, furnish and apply the following kinds and amounts of seed. Obtain the pounds of seed to furnish per acre by dividing the pounds of pure live seed required per acre by the product of the percent purity and percent germination.

Example: 5 lbs Pure Live Seed/Acre = 6.55 lbs Commercial Seed/Acre

0.90 X 0.85 (Purity = 90% and Germination = 85%)

Kind of Seed Quantity of Pure Live Seed (Lbs/Acre)

1. Annual Rye 18

2. Hard Fescue 6

3. Orchard Grass 6 Total 30

Seed mixture having a different analysis may be used if approved in advance by the CO.

625.08 Mulching.

(b) Hydraulic method.

Delete the first sentence and add the following.

Apply mulch in a separate application from the seed or in a single application with the seed using hydraulic-type equipment according to Subsection 625.07(b).

625.09 Protecting and Caring for Seeded Areas.

Delete the first sentence and add the following.

Protect and care for seeded areas until final acceptance.

625.11 Measurement

Delete the second paragraph and add the following.

Measure seeding, fertilizing, and mulching by lump sum.

ROADSIDE MOWING and Limbing Roadside mowing consists of cutting grass, weeds, and small woody plant growth six (6) inches in diameter or less at the mowing height. This includes cutting around road signs, natural obstacles and appurtenances.

The roadsides and roadbed will be mowed as close to the ground as possible, but no higher than a five (5) inch maximum height depending on the size of the brush. Typically the required mowing width will be tree line to tree line. Required mowing width will vary from a minimum of three (3) to five (5) feet outside the ditch line or throughout the previously mowed area whichever is greater. Contactors are encouraged to inspect roads before submitting a quote. No additional payment will be made for variable widths.

All cut and fill slopes too steep to mow with equipment shall be cut to a five (5) inch maximum height by hand or other method approved by the COR to a minimum of six (6) feet from the ditch line of cuts and the shoulder of fill areas.

All rocks, logs, or other objects dislodged by the Contractor’s operation that fall into the drainages or traveled way shall be removed. This also includes any reasonable size limbs already lying in the right-of-way.

The contractor shall be responsible for damage to culverts, marker posts, guardrails, signs, etc. Damaged items shall be replaced at the Contractor’s expense.

Limbing will consist of cutting limbs as close to the tree as possible from tree line to tree line 14’ in height.

Any cuttings that may fall in the traveled portion of the roadway or that may clog drainages shall be taken a minimum of 3 to 5 feet beyond the treeline unless chipped or broken into small pieces by the equipment. Trees that are accidentally damaged by the Contractors operation that are unsightly or would impair growth shall be cut five (5) inches above ground and removed from right-of-way.

Typical Drawings

Drainage Dips

Drainage Outlets

Revetment Mat, Articulating Concrete Block, Dimensions are not to scale, for reference only, see Description of Work for dimensions and closed or open cell applications

Forest Service Supplemental Specifications2016 Table of Contents
Preface
101 - Terms, Format, and Definitions
101.01 Meaning of Terms
101.03 Abbreviations.
101.04 Definitions.
102 - Bid, Award, and Execution of Contract
102 Bid, Award, and Execution of Contract
103 - Scope of Work
Deletions
104 - Control of Work
Deletions
104.06 Use of Roads by Contractor
105 - Control of Material
105.02 Material Sources.
105.02(a) Government-provided sources.
105.05 Use of Material Found in the Work.
106 - Acceptance of Work
106.07 Delete
107 - Legal Relations and Responsibility to the Public
107.05 Responsibility for Damage Claims.
107.06 Contractor’s Responsibility for Work.
107.09 Legal Relationship of the Parties.
107.10 Environmental Protection.
108 - Prosecution and Progress
108 Delete.
109 - Measurement and Payment
109 Deletions
109.02 Measurement Terms and Definitions.
154 - Contractor Sampling and Testing
155 - Schedules for Construction Contracts
155 Delete.
171 - Weed and Disease Prevention
201 - Clearing and Grubbing
201.01 Description
201.04 Clearing. (c)
204 – Excavation and Embankment
204.11 Compaction
Delete and Add the following:
308 - Minor Crushed Aggregate
602 - Culverts and Drains
602.03 General.
625 - Turf Establishment
625.03 General.
625.04 Preparing Seedbed.
625.05 Watering
625.06 Fertilizing.
625.07 Seeding.
625.08 Mulching.
625.09 Protecting and Caring for Seeded Areas.
625.11 Measurement