AG-569R-S-16-0025 Updated/Revised Schedule of Items
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AG-569R-S-16-0025_Amendment_2.pdf | ||
| Attachment_B_-_UPDATED_BRUNET_PLANS_060816.pdf | ||
| Attachment_A_-_Updated_FR_311_SCRs.doc | DOC document | |
| AG-569R-S-16-0025_MOD_000001_.pdf | ||
| Addendum_to_Section_C_-_Sustainable_Acquisitions.docx | DOCX document | |
| Sol_AG-569R-S-16-0025.docx | DOCX document | |
| Attachment_D_-_Experience_Questionnaire_.docx | DOCX document | |
| Attachment_C_-_Wage_Determination_WI10.txt | TXT text file | |
| Attachment_A_-_FR_311_SCR's.doc | DOC document | |
| Attachment_B_-_Signed_Brunet_Plans.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| 8-June-2016 | ||||||
| Solicitation #AG-569R-S-16-0025 | ||||||
| FR 311 Culvert Replacement - | ||||||
| UNC Brunet River | ||||||
| Chequamegon-Nicolet National Forest | ||||||
| Section B - Supplies or Services and Price/Cost | ||||||
| Schedule of Items | ||||||
| FR 311, UNT Brunet | ||||||
| Great Divie Ranger District-Sawyer County | ||||||
| Item / Description | Quantity | Unit | Unit Price | Total Cost | ||
| 15101 | 1.00 | LS | ||||
| Mobilization | $0.00 | |||||
| 15713 | 1.00 | LS | ||||
| Soil Erosion and Pollution Control | $0.00 | |||||
| $0.00 | ||||||
| 20304 | 1.00 | LS | ||||
| Removal Existing Culverts | $0.00 | |||||
| Disposal Method 'E' | ||||||
| 20411 | 30.00 | CY | ||||
| Embankment Construction, Compaction | ||||||
| Method 'B', Finishing Method 'A' | ||||||
| 20415 | 400.00 | CY | ||||
| Unsuitable Excavation | ||||||
| 20801 | 370.00 | CY | ||||
| Structure Excavation | $0.00 | |||||
| $0.00 | ||||||
| 20805 | 1.00 | L.S. | ||||
| Coffer Dams | ||||||
| 25101 | 40.00 | CY | ||||
| Placed RipRap, Class 4 | $0.00 | |||||
| 30111 | 300.00 | CY | ||||
| Aggregate Surface Course, Grade G or | $0.00 | |||||
| equivalent, Compaction method B | $0.00 | |||||
| 30329 | 1.00 | L.S. | ||||
| Road Reconditioning | ||||||
| 60202 | 80.00 | LF | ||||
| 21x15 Galvanized Arch Pipe | ||||||
| $0.00 | ||||||
| 60205 | 48.00 | LF | ||||
| 10'x4' Concrete Box Culvert | ||||||
| w/ 2:1 partial end bevel | ||||||
| (Includes Crane to Set Sections) | ||||||
| 60513 | ||||||
| Geogrid Material, TriAx TX140 | 70.00 | SY | ||||
| Or Equivalent | ||||||
| 62503 | 1.00 | LS | ||||
| Seeding (Mulching and Fertilization) | ||||||
| Dry Method | ||||||
| 62901 | 40.00 | SY | ||||
| Erosion Control Mat | ||||||
| Type 'ENS2' or Equivalent | ||||||
| 63501 | 1.00 | LS | ||||
| Temporary Traffic Control | ||||||
| OPTIONAL BID ITEMS | ||||||
| 60202 | 80.00 | LF | ||||
| 21x15 Galvanized Arch Pipe | ||||||
| PROJECT TOTAL |
Sheet2
| 15101 1.00 L.S. 8,000.00 8,000.00 |
| Mobilization |
| 15102 1.00 L.S. 1,000.00 1,000.00 |
| Bond Premium |
| 20304 1.00 L.S. 7,000.00 7,000.00 |
| Removal of Existing Structures |
| (asphalt and culverts) |
| 20801 1.00 L.S. 15,000.00 15,000.00 |
| Structure Excavation |
| 40101 80.00 TON 100.00 8,000.00 |
| Superpave Hot Asphalt concrete |
| pavement |
| Type:E1 |
| 41501 1.00 L.S. 2,000.00 2,000.00 |
| Paving Geotextile |
| 55101 400.00 L.F. 18.00 7,200.00 |
| Treated Timber Piles, |
| CCA Preservative, |
| Driven |
| 55109 630.00 L.F. 13.00 8,190.00 |
| Treated Timber Piles, |
| CCA Preservative, |
| Furnished |
| 57101 1.00 L.S. 70,000.00 70,000.00 |
| Prefabricated bridge superstructure- |
| Design, fabricate, deliver, and install |
| 57106 1.00 L.S. 20,000.00 20,000.00 |
| Bridge Substructure, |
| (Bridge Abutments System) |
| (Excluding Pilings) |
| Wed. March 31, 2004 |
| Road Estimate And Payments System |
| *** R E A P S *** Chequamegon-Nicolet NF |
| PW ENGINEERING PROJECT ESTIMATE |
| Elvoy Creek/FR 2193 Bridge |
| ROAD NUMBER – 2193 Sub Unit – Eagle River/Florence |
| County - Forest |
| Terrain - Flat |
| Item / Description Quantity Unit UNIT PRICE TOTAL COST |
| ================== ======== ==== ========== ============ |
| 62501 1.00 L.S. 500.00 500.00 |
| Seeding (Mulching and Fertilization) |
| Dry Method |
| 63501 1.00 L.S. 2,000.00 2,000.00 |
| Temporary Traffic Control |
Sheet3
Contractor’s _______________________________
Name & Address: _______________________________
Phone Number: _______________________________
DUNS # _______________________________
e-mail Address: _______________________________
Please complete and submit SF-1442 Form, Section B & K and the experience questionnaire to the address in block 8 of the SF 1442 form by 1:00 PM EST on June 17, 2016. Documents may be e-mailed to acaliguri@fs.fed.us or mailed to:
USDA Forest Service
LSAT Contracting, Solicitation #AG-569R-S-16-0024
Attn: Annette
820 Rains Drive
Gladstone, MI 49837