Attachment_B_-_Signed_Brunet_Plans.pdf
PDF 735 KB Posted
- Attached to
- CN - FR 311 Culvert Replacement UNT Brunet River Federal contract opportunity
- Solicitation number
- AG-569R-S-16-0025
About this file
Attachment B - Signed Brunet Plans
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_A_-_Updated_FR_311_SCRs.doc | DOC document | |
| AG-569R-S-16-0025_Revised_Schedule_of_Items.xls | XLS spreadsheet | |
| Attachment_B_-_UPDATED_BRUNET_PLANS_060816.pdf | ||
| AG-569R-S-16-0025_Amendment_2.pdf | ||
| Addendum_to_Section_C_-_Sustainable_Acquisitions.docx | DOCX document | |
| AG-569R-S-16-0025_MOD_000001_.pdf | ||
| Attachment_A_-_FR_311_SCR's.doc | DOC document | |
| Sol_AG-569R-S-16-0025.docx | DOCX document | |
| Attachment_D_-_Experience_Questionnaire_.docx | DOCX document | |
| Attachment_C_-_Wage_Determination_WI10.txt | TXT text file |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNT BRUNET CREEK
GREAT DIVIDE RANGER DISTRICT
CHEQUAMEGON-NICOLET
NATIONAL FOREST
CHEQUAMEGON-NICOLET NATIONAL FOREST
SAWYER COUNTY, WISCONSIN
U.S. DEPT. OF AGRICULTURE
FOREST SERVICE
FOREST ENGINEER
APPROVED:
DATE
INDEX OF SHEETS
SHEET CONTENTS
WISCONSIN
WASHBURN
PARK FALLS
N
WISCONSIN
MINNEAPOLIS/
DULUTH/SUPERIOR
ST. PAUL
MISSISSIPPI
RIVER
MADISON
RIVER
CHICAGO
MILWAUKEE
RHINELANDER
MEDFORD
WINNEBAGO
LAKE
LAKE SUPERIOR
APOSTLE ISLANDS
IRONWOOD2
13 51
LAKE MICHIGAN
VICINITY MAP
Chequamegon-Nicolet National Forest
FILE NO.
Engineering-Supervisor's Office
DISTRICT RANGER DATE
Chequamegon-Nicolet National Forest
District Office- MEDFORD/PARK FALLS
These drawings comply with the Forest Plan and Project Specific NEPA documentation.
RECOMMENDED:
COVER SHEET
QUANTITIES
TYPICAL SECTIONS
PLAN AND PROFILE
CULVERT DETAILS
ROAD SECTIONS
6-9
C-1930
CULVERT REPLACEMENT @ FR 311
PROJECT
LOCATION
LORETTA/DRAPER
mbeuning Typewritten Text April 6, 2016
General Notes
1) CONSTRUCTION SPECIFICATIONS: Standard Specifications for Construction of Roads and Bridges on
Federal Highway Projects, FP-03 U.S. Customary Units, shall apply to this contract.
2) Minor amounts of clearing and grubbing are required for culvert replacement. Limbs, logs, & stumps may be scattered outside the clearing limits. This work shall be considered incidental to Pay Item 20304-Removal.
3) Maintenance for traffic will be the responsibility of the Contractor. Road closures will be accompanied by road detours in accordance with the Manual of Uniform Traffic Control Devices (2003) guidelines. This work shall be considered incidental to Pay Item 15101-Mobilization.
4) Contractor shall not construct these projects during abnormally high flows.
5) The Engineer shall be notified of any road closures one week prior.
6) Contractor is responsible for properly disposing of old culverts off of Forest Service lands.
7) Install culvert in locations as staked by the engineer. Bedding and pipe placement shall be approved by the engineer before backfilling begins.
8) Reconstruction of the subgrade shall be required before placing surfacing material and shall be considered incidental to Pay Item 20411. No excavated materials shall be wasted outside of the clearing limits unless
Approved by the Engineer.
9) Top of coffer dams shall be set at an elevation of 98.0 feet or higher. Coffer dams shall be constructed of non-erodable material.
10) All select borrow material shall be a silt and sand mixture and meet the standard of FP-03 Subsection 704.07.
11) Riprap shall be embedded into the embankment such that the final surface of riprap will be flush with surrounding embankment.
12) Seed mixture: Seed mixture: Big Bluestern, 10%; Sideoats Grama, 20%; Canada Wild Rye, 35%; Annual
Rye, 10%; Little Bluestern, 10%; Indiangrass, 10%, Purple Prairie Clover, 4%; Black-eyed Susan, 1%.
Seeding rate: 30.49 lbs/ acre.
13) Apply Seed, Fertilizer, and Erosion Control Mat in all disturbed areas of the project.
C U s e r s e m l y n c h
D e s k t o p P
R O
J E
C T
S F
Y
F
R
B r u n e t D
W G
B
R U
N E
T
B A
S E d w g
A p r
P
M
GENERAL NOTES
& QUANTITIES
C-1930
2 9
UNT BRUNET
@ FR 311
03/07/11
03/07/11
03/07/11
E. LYNCH
E. LYNCH
TYPICAL EXISTING ROAD SECTION
10.50'
0.02 FT/FT 0.02 FT/FT
VARIESVARIES
10.50'
C U s e r s e m l y n c h
D e s k t o p P
R O
J E
C T
S F
Y
F
R
B r u n e t D
W G
B
R U
N E
T
B A
S E d r
P
M
TYPICAL EXISTING &
PROPOSED CROSS SECTIONS
1" = 5'
C-1930
3 9
UNT BRUNET
@ FR 311
03/07/11
03/07/11
03/07/11
E. LYNCH
E. LYNCH
E. LYNCH
TYPICAL PROPOSED ROAD SECTION
11.00'
26.00'
0.02 FT/FT 0.02 FT/FT
2:1 2:1
2:1
11.00'
6" (COMPACTED DEPTH)
CRUSHED GRAVEL SURFACE
COURSE
1.00'
STA: 10+75 to 12+50
90.00
95.00
100.00
105.00
110.00
10+00
11+00
12+00
13+00
0.00%
G R
A D
E
B
R E
K
S
T
E L
E V
G R
A D
E
B
R E
K
S
T
E L
E V
C U s e r s e m l y n c h
D e s k t o p P
R O
J E
C T
S F
Y
F
R
B r u n e t D
W G
B
R U
N E
T
B A
S E d r
P
M
PLAN & PROFILE
1" = 50'
C-1930
4 9
UNT BRUNET
@ FR 311
02/14/11
02/14/11
02/14/11
E. LYNCH
EXISTING CULVERTS
TO BE REMOVED
PROPOSED 10x4 CONCRETE
BOX CULVERT W/ 2:1 PARTIAL
BEVEL
INV ELEV: 94.50'
EXISTING ROAD
SURFACE
SILT FENCE
(TYP)
8'-0" MAX.
2' M
IN
FLOW
2' M
IN
4' M
IN
EXISTING GROUND
EXISTING CULVERT TO BE
REMOVED
STRUCTURE EXCAVATION
& BACKFILL INCLUDES
AMOUNT OUTSIDE
VERTICAL PLANES
CL STA. 11+45.09
CULVERT INSTALLATION
STANDARD SILT FENCE
SCALE: 1"=5'
8'-0" MAX.
2' M
IN
NOT TO SCALE
FLOW
2' M
IN
4' M
IN
PROPOSED SURFACE
STANDARD SILT FENCE
INSTALLATION
CULVERT CROSS SECTION
SCALE: 1"=5'
EXCAVATE MINIMUM 6"x 6"
TRENCH, FOLD GEOTEXTILE
FABRIC TO FIT TRENCH,
FABRIC TO FIT TRENCH
TO EXISTING GRADE.,
REINFORCED
GEOTEXTILE
FABRIC
EXISTING
GROUND
2"x2" WOOD
OR STEEL
SUPPORT POST
ATTACH FABRIC TO
POST WITH WIRE STAPLES
EXISTING
GROUND
C U s e r s e m l y n c h
D e s k t o p P
R O
J E
C T
S F
Y
F
R
B r u n e t D
W G
B
R U
N E
T
B A
S E d r
P
M
CULVERT & SILT
FENCE DETAILS
AS SHOWN
C-1930
5 9
UNT BRUNET
@ FR 311
03/07/11
03/07/11
03/07/11
E. LYNCH
E. LYNCH
E. LYNCH
PLACED CLASS 4
RIP RAP EXTENDED
TO TOP OF STREAM BANK
8" AGGRAGATE
SINGLE LAYER OF
TRI-AX GEOGRID
8' (TYP)
PROPOSED SURFACE
INVERT ELEV: 94.50'
*NORMAL FLOW
0.43 CFS
*100 YEAR FLOOD
193 CFS
100 YR FLOOD
WATER SURFACE
ELEV: 98.27'
NORMAL
WATER SURFACE
ELEV: 97.23'
8.0'
10.0'
C ELEV: 100.45'L
32.24
C-1930
1" = 10'
CROSS SECTIONS
STA: 10+75 to 11+10.09
UNT BRUNET
@ FR 311
03/07/11
03/07/11
03/07/11
E. LYNCH
E. LYNCH
E. LYNCH
STA: 10+75.00
STA: 11+00.00
STA: 11+10.09
1" = 10'
CROSS SECTIONS
STA: 11+25 to 11+44.42
UNT BRUNET
@ FR 311
03/07/11
03/07/11
03/07/11
E. LYNCH
E. LYNCH
E. LYNCH
STA: 11+25.00
STA: 11+31.42
STA: 11+44.42
1" = 10'
CROSS SECTIONS
STA: 11+50 to 11+75
UNT BRUNET
@ FR 311
03/07/11
03/07/11
03/07/11
E. LYNCH
E. LYNCH
E. LYNCH
STA: 11+50.00
STA: 11+58.30
STA: 11+75.00
1" = 10'
CROSS SECTIONS
STA: 12+00 to 12+50
UNT BRUNET
@ FR 311
03/07/11
03/07/11
03/07/11
E. LYNCH
E. LYNCH
E. LYNCH
STA: 12+00.00
STA: 12+25.00
STA: 12+50.00
| 2016-04-06T13:54:06-0500 | |
| Mark Beuning |
File details come from the government source that posted it. Updated .