ORB 7014_Sperry Fork Causeway_Bridge_Wayne_SF 30_amend 1.pdf

PDF 118 KB Posted

Attached to
SPERRY FORK CAUSEWAY/BRIDGE PROJECT
Solicitation number
AG-55N9-S-12-0004
Issued by

About this file

Standard Form 30

View the file

Other files

File Type Posted
ADDITIONAL REPRESENTATIONS AND CERTIFICATIONS_AGAR Advisory 104.pdf PDF
ORB 7014_Sperry Fork Causeway_Bridge_Specifications_amend 1.pdf PDF
ORB 7014_Sperry Fork Causeway_Bridge_Wayne_Davis_Bacon Wage Determination_amend 1.pdf PDF
Preproposal Meeting Minutes_Wayne_Sperry Fork Causeway.pdf PDF
ORB 7014_Sperry Fork Causeway_Bridge_Wayne_Geotechnical and Soil Report.pdf PDF
ORB 7014_Sperry Fork Causeway_Bridge_Wayne_Map.pdf PDF
ORB 7014_Sperry Fork Causeway_Drawing_6of9_Typ_Bridge_X-Section.pdf PDF
ORB 7014_Sperry Fork Causeway_Drawing_2of9_Control_Coord_Layout_Statement_Quantities.pdf PDF
ORB 7014_Sperry Fork Causeway_Drawing_9of9_Profile_GR_Silt_Detail.pdf PDF
ORB 7014_Sperry Fork Causeway_Drawing_1of9_Site_Plan.pdf PDF
ORB 7014_Sperry Fork Causeway_Drawing_5of9_Column_Pier_Details.pdf PDF
ORB 7014_Sperry Fork Causeway_Drawing_3of9_Plan_Profile.pdf PDF
ORB 7014_Sperry Fork Causeway_Drawing_4of9_Site_Plan_Abutment.pdf PDF
ORB 7014_Sperry Fork Causeway_Drawing_0of9_Cover Sheet.pdf PDF
ORB 7014_Sperry Fork Causeway_Drawing_7of9_Typ_Helical_Pile_Details.pdf PDF
ORB 7014_Sperry Fork Causeway_Drawing_8of9_Bridge_Beam_Plan.pdf PDF
ORB 7014_Sperry Fork Causeway_Bridge_Wayne_Specifications.pdf PDF
ORB 7014_Sperry Fork Causeway_Bridge_Wayne_Specs_Cover Page.pdf PDF
ORB 7014_Sperry Fork Causeway_Bridge_Wayne_Davis_Bacon Wage Determination.pdf PDF
ORB 7014_Sperry Fork Causeway_Bridge_Wayne_Specs_Index.pdf PDF
ORB 7014_Sperry Fork Causeway_SF 1442.pdf PDF
ORB 7014_Sperry Fork Causeway_Bridge_Wayne_Section B_Price Schedule.pdf PDF
ORB 7014_Sperry Fork Causeway_Bridge_Wayne_Sec B Infor thru M.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

oRB 7014

USDA Forest Service Hoosier National Forest 81 1 Constitution Avenue Bedford, lN 47421

1-S-12-0004

04123t2012

I1. THIS ITEM Y APPLIES TO soLrctTA

E The above numbercd solicitation is amended as set forth in ltem 14. The hour and dare sp€cified for rcc€ipr of offers tr is oxrended. fi i" not er,tuna*.

Otfers must adoowledge r€c€ipl of this amendmenl pnor b th€ hour and dats specified in the soldtation or as amended. by one of rhe folowing methods

(a) Bv compl€ling items E and l 5 and retuming copies of the amendmenti (b) By acknorivtedging receipt ot ihis amendmenl on €ach copy ot the otr€r submitted i or (c) By separate letter or lel€g ram which includes a referenc€ to th€ solicitation and am€ndmsnt numbers. FATLURE oF youR AcKNowLEDGMENT To BE RECEtvED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR ANO DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER I' bV ViTtUE Of IhiS amendment your d€sire lo change an offer akeady submitted such change may be made by telegram or tetter, provided each t€leg€m or lett€r makes refe.ence to the solicitation and liis amendment, and is received p or to the openinq hour and date specified.

CHECK ONE IHIS CHANGE ORDER lS ISSUED PURSUANT TO: fspec/t aurhoriy) THE CHANGES SET

IN ITEM 1OA

IN ITEI' 14 ARE MADE IN THE CONTRACT ORDER NO

IS ENTERED PURSUANT TO AUTHORITY

D OTHER (Specify type of nodification and authotiN)

E. IMPORTANT: Contractor I is not, I is required to sign this document and return copies to the issuing office.

oFAMENDMENT/MoD|F|cAT|oN|organizedbyUcrsecn@nractsubPctma|terwheefeasibte'i

@n',"f"'"n"*in|tem9AolloA,asneleto'orechanged,remainsunchangedandinfu||forceandeffac1, SPERRY FORK CAUSEWAY, WAYNE NATIONAL FOREST (IRONTON DISTRICT), OHA Specifications are replaced in its eitirety (attached). Specifically, section 1.2 D (Evaluation criteria of Bid)was removed.8.. solicitation (section L), "offerors Tech;ical Propo6al" (page +0j, "Use of subcontractors,l. ti tne o?eror iritenos on usingsubcontractors; however, subcontract agreements are yet io 6'e estlblisheo, tren ttre oneioi "an "iiliiy inoi""t" what work willbe subcontracted.

c. offeror shall certify and submit the attached 'ADDtTtoNAL REREpRESENTATTONS AND CERTtFtcATtoNS,'with itsproposat.

D. updated oavis-Bacon wage determination is attached. proposal due date remains unchanoed.

B rHE ABOVE NUMBERED CONTMCT/ORDER lSMODIFTED TO REFLECT THE ADMtN|STRATIVE CHINCeS lsuca as ctrang,os rn p€y,iro,otrtce, apprc iation dale, elc ) sEI FoRTH tN ITEM 14, PURSUANT TO THE AUTHOR|TY OF FAR 43 103(bt.

STANDARD FORM 30 (REV. jo-s3) Prescribed by GSA FAR (48 CFR) 53 243 lT MODIFIES THE CONTRACT/ORDER NO. AS DESCRTBED tN |TEM .tit.

WILLIAM L. CLARK

INSTRUCTIONS

Instructions for items other than those that are self-explanatory, are as follows:

(a)

(b)

Item 1 (Contract lD Code). Insert the contract type identification code that appears in the title block of the contract being modified.

Item 3 (Effective date).

(1) For a solicitation amendment, change order, or adminrstrative change, the effective date shall be the issue date of the amendment, change order, or administrative change.

(2) For a supplemental agreement, the effective date shall be the date agreed to by the contracting parties.

(3) For a modiflcation issued as an inilial or confirming notice of termination for the convenience of the Government, the effective date and the modification number of the confirming notice shall be the same as the effective date and modification number of the initial notice.

For a modification converting a termination for default to a termination for the convenience of the Government, the effective date shall be the same as the effective date of the termination for default.

For a modification confirming the contacting officer's determination of the amount due in settlement of a contract termination, the effectlve date shall be the same as the effective date of the initial decision.

Item 6 (lssued Bv). lnsert the name and address of the issuing ofiice. lf applicable, insert the appropriate issuing office code in the code block.

Item 8 (Name and Address of Contractor). For modifications to a contract or order, enter the contractor's name, address, and code as shown in the original contract or order, unless changed by this or a Drevious modification.

Item 9. (Amendment of Solicitation No. - Dated).

and 10. (Modification of Contracuorder No -

Dated). Check the appropriate box and in the corresponding blanks insert the number and date of the original solicitation, contract, or order.

Item 12 (Accounting and ApDropriation qata).

When appropriate, indicate the impact of the modification on each affected accounting classification by inserting one of the following entries.

(1) Accounting classiflcation Net increase $

(2) Accountingclassification Net decrease

NOTE: lf there are changes to multiple accounting classifications that €nnot be placed in block 12, insert an asterisk and the words "See continuation sheet".

Item 13. Check the appropriate box to indicate the type of modification. Insert in the corresponding blank the authority under which the modification is issued. Check whether or not contractor must sign this document. (See FAR 43.103.)

Item 1 4 (Descriotion of AmendmenuModification).

('l ) Organize amendments or modifications under the appropriate Uniform Contract Format (UCF) section headings from the applicable solicitation or contract. The UCF table of contents. however, shall not be set forth in this document

(2) Indicate the impact of the modification on the overall total contract price by inserting one of the following entries:

(i) Total contract price increased by $

(ii) Total contract price decreased by $

(iii) Total contract price unchanged.

State reason for modification.

(s)

(h)

(4)

(5)

(c)

(d)

(3)

(4)

(s)

When removing, reinstating, or adding funds, identify the contract items and accounting classifications.

When the SF 30 is used to reflect a determination by the contracting officer of the amount due in settlement of a contract terminated for the convenience of the Government, the entry in ltem 14 of the modification may be limited to -

(i) A reference to the letter determination; and

(ii) A statement of the net amount determined to be due in settlement of the contract'

Include subject matter or short title of solicitation/contract where feasible.

Item 168. The contracting officefs signature is not.

reouirea on solicitation amendments. The contracting officer's signature is normally af{ixed last on supplemental agreements.

STANDARD FORM 30 {REV' 1o-s3) BACK

(e)

(f) (6)

(i)

File details come from the government source that posted it. Updated .