ORB 7014_Sperry Fork Causeway_Bridge_Wayne_Section B_Price Schedule.pdf

PDF 49 KB Posted

Attached to
SPERRY FORK CAUSEWAY/BRIDGE PROJECT
Solicitation number
AG-55N9-S-12-0004
Issued by

About this file

Section B (Price Schedule)

View the file

Other files

File Type Posted
ADDITIONAL REPRESENTATIONS AND CERTIFICATIONS_AGAR Advisory 104.pdf PDF
ORB 7014_Sperry Fork Causeway_Bridge_Wayne_SF 30_amend 1.pdf PDF
ORB 7014_Sperry Fork Causeway_Bridge_Specifications_amend 1.pdf PDF
ORB 7014_Sperry Fork Causeway_Bridge_Wayne_Davis_Bacon Wage Determination_amend 1.pdf PDF
Preproposal Meeting Minutes_Wayne_Sperry Fork Causeway.pdf PDF
ORB 7014_Sperry Fork Causeway_Bridge_Wayne_Geotechnical and Soil Report.pdf PDF
ORB 7014_Sperry Fork Causeway_Bridge_Wayne_Map.pdf PDF
ORB 7014_Sperry Fork Causeway_Drawing_5of9_Column_Pier_Details.pdf PDF
ORB 7014_Sperry Fork Causeway_Drawing_3of9_Plan_Profile.pdf PDF
ORB 7014_Sperry Fork Causeway_Drawing_4of9_Site_Plan_Abutment.pdf PDF
ORB 7014_Sperry Fork Causeway_Drawing_6of9_Typ_Bridge_X-Section.pdf PDF
ORB 7014_Sperry Fork Causeway_Drawing_8of9_Bridge_Beam_Plan.pdf PDF
ORB 7014_Sperry Fork Causeway_Drawing_9of9_Profile_GR_Silt_Detail.pdf PDF
ORB 7014_Sperry Fork Causeway_Drawing_7of9_Typ_Helical_Pile_Details.pdf PDF
ORB 7014_Sperry Fork Causeway_Drawing_2of9_Control_Coord_Layout_Statement_Quantities.pdf PDF
ORB 7014_Sperry Fork Causeway_Drawing_1of9_Site_Plan.pdf PDF
ORB 7014_Sperry Fork Causeway_Drawing_0of9_Cover Sheet.pdf PDF
ORB 7014_Sperry Fork Causeway_Bridge_Wayne_Specs_Cover Page.pdf PDF
ORB 7014_Sperry Fork Causeway_Bridge_Wayne_Specs_Index.pdf PDF
ORB 7014_Sperry Fork Causeway_Bridge_Wayne_Specifications.pdf PDF
ORB 7014_Sperry Fork Causeway_Bridge_Wayne_Davis_Bacon Wage Determination.pdf PDF
ORB 7014_Sperry Fork Causeway_SF 1442.pdf PDF
ORB 7014_Sperry Fork Causeway_Bridge_Wayne_Sec B Infor thru M.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S.F.S. WAYNE NATIONAL FOREST

Sperry Fork Causeway/Bridge Project

ELIZABETH TOWNSHIP, LAWRENCE COUNTY, OHIO

SCHEDULE OF ITEMS 14-Feb-12

Item Description

Method of

Measurement Unit Quantity Unit Cost Price

1 Mobilization LSQ LS 1.0

2 Layout of Project LSQ LS 1.0

3 Helical Piles AQ Each 32.0

4 Helical Tie Back AQ Each 2.0

5 Concrete Rear Abutment AQ Each 1.0

6 Concrete Forward Abutment AQ Each 1.0

7 2" Round Steel Pipe Railing Embedded in Rear Abutment AQ Each 1.0

8 2" Round Steel Pipe Railing Embedded in Forward Abutment AQ Each 1.0

9 8x8 WF Column #1 (5.25 Feet Each) AQ Each 2.0

10 8x8 WF Column #2 (4.48 Feet Each) AQ Each 2.0

11 8x8 WF Column #3 (3.37 Feet Each) AQ Each 2.0

12 8x8 WF Column #4 (1.49 Feet Each) AQ Each 2.0

13 8x8 WF Column #5 (2.50 Feet Each) AQ Each 2.0

14 8x8 WF Column #6 (3.39 Feet Each) AQ Each 2.0

15 8x8 WF Column #7 (4.06 Feet Each) AQ Each 2.0

16 8x8 WF Column #8 (4.60 Feet Each) AQ Each 2.0

17 8x8 WF Column #9 (5.02 Feet Each) AQ Each 2.0

18 8x8 WF Column #10 (5.54 Feet Each) AQ Each 2.0

19 8x8 WF Column #11 (5.77 Feet Each) AQ Each 2.0

20 8x8 WF Column #12 (6.00 Feet Each) AQ Each 2.0

21 8x8 WF Column #13 (6.00 Feet Each) AQ Each 2.0

22 8x8 WF Column #14 (5.95 Feet Each) AQ Each 3.0

23 8x8 WF Column #15 (7.93 Feet Each) AQ Each 3.0

24 Connection Helical Pile to Column AQ Each 32.0

25 Steel Plate 12"x12"x1/2" (T) Bottom of Column AQ Each 32.0

26 Steel Plate 8"x8"x1/2" (T) Top of Column AQ Each 32.0

27 Steel Plate 16"x8"x1" (T) for Bridge Beam Connection AQ Each 32.0

28 Steel Wedge Columns #1,#2,#3 & #4 AQ Each 4.0

29 8x8 WF Cross Beam (10 Feet Long Each) AQ Each 15.0

ELIZABETH TOWNSHIP, LAWRENCE COUNTY, OHIO

SCHEDULE OF ITEMS 14-Feb-12

Item Description

Method of

Measurement Unit Quantity Unit Cost Price

30 8x8 WF Bridge Beam Set #1 (22'-5 1/2" Each) 3 - Each for Set LSQ LS 1.0

31 8x8 WF Bridge Beam Set #2 (21'-0 1/2" Each) 3 - Each for Set LSQ LS 1.0

32 8x8 WF Bridge Beam Set #3 (21'-0 1/2" Each) 3 - Each for Set LSQ LS 1.0

33 8x8 WF Bridge Beam Set #4 (21'-0 1/2" Each) 3 - Each for Set LSQ LS 1.0

34 8x8 WF Bridge Beam Set #5 (23'-0" Each) 3 - Each for Set LSQ LS 1.0

35 8x8 WF Bridge Beam Set #6 (23'-0" Each) 3 - Each for Set LSQ LS 1.0

36 8x8 WF Bridge Beam Set #7 (23'-0" Each) 3 - Each for Set LSQ LS 1.0

37 8x8 WF Bridge Beam Set #8 (23'-0" Each) 3 - Each for Set LSQ LS 1.0

38 8x8 WF Bridge Beam Set #9 (23'-0" Each) 3 - Each for Set LSQ LS 1.0

39 8x8 WF Bridge Beam Set #10 (23'-0" Each) 3 - Each for Set LSQ LS 1.0

40 8x8 WF Bridge Beam Set #11 (23'-0" Each) 3 - Each for Set LSQ LS 1.0

41 8x8 WF Bridge Beam Set #12 (23'-0" Each) 3 - Each for Set LSQ LS 1.0

42 8x8 WF Bridge Beam Set #13 (23'-0" Each) 3 - Each for Set LSQ LS 1.0

43 10x10 WF Bridge Beam Set #14 (40'-0" Each) 3 - Each for Set LSQ LS 1.0

44 10x10 WF Bridge Beam Set #15 (28'-6" Each) 3 - Each for Set LSQ LS 1.0

45 Crossframe Set AQ Each 34.0

46 Longitudinal Knee Brace Set Column #1 Group LSQ LS 1.0

47 Longitudinal Knee Brace Set Column #2 Group LSQ LS 1.0

48 Longitudinal Knee Brace Set Column #3 Group LSQ LS 1.0

49 Longitudinal Knee Brace Set Column #4 Group LSQ LS 1.0

50 Longitudinal Knee Brace Set Column #5 Group LSQ LS 1.0

51 Longitudinal Knee Brace Set Column #6 Group LSQ LS 1.0

52 Longitudinal Knee Brace Set Column #7 Group LSQ LS 1.0

53 Longitudinal Knee Brace Set Column #8 Group LSQ LS 1.0

54 Longitudinal Knee Brace Set Column #9 Group LSQ LS 1.0

55 Longitudinal Knee Brace Set Column #10 Group LSQ LS 1.0

56 Longitudinal Knee Brace Set Column #11 Group LSQ LS 1.0

57 Longitudinal Knee Brace Set Column #12 Group LSQ LS 1.0

58 Longitudinal Knee Brace Set Column #13 Group LSQ LS 1.0

ELIZABETH TOWNSHIP, LAWRENCE COUNTY, OHIO

SCHEDULE OF ITEMS 14-Feb-12

Item Description

Method of

Measurement Unit Quantity Unit Cost Price

59 Longitudinal Knee Brace Set Column #14 Group LSQ LS 1.0

60 Longitudinal Knee Brace Set Column #15 Group LSQ LS 1.0

61 Transverse Knee Brace Set Column #1 Thru #13 Group LSQ LS 13.0

62 Transverse Knee Brace Set Column #14 & #15 Group LSQ LS 2.0

63 Wood Bridge Decking AQ Sq. Ft. 3800.0

64 L 5"x3"x1/4" Angle Complete Length of Bridge AQ Lin. Ft. 760.0

65 4"x1/2" Plate Complete Length of Bridge AQ Lin. Ft. 760.0

66 6"x6"x1/2" (T) Post Support Boxes AQ Each 188.0

2" Round Steel Pipe Post for Railing Complete with 6"x6"x1/2" (T)

Plate on Bottom AQ Each 188.0

68 2" Round Steel Pipe Top Railing AQ Lin. Ft. 1588.0

69 2" Round Steel Pipe Bottom Railing AQ Lin. Ft. 1482.0

70 Barrier Rear Abutment LSQ LS 1.0

71 Guardrail Modification at S.R. 650 LSQ LS 1.0

72 Silt Fence AQ Lin. Ft. 200.0

73 Seeding and Mulching AQ Acres 1.0

Bid Total =

File details come from the government source that posted it. Updated .