Revised_Schedule_of_Items,_Addendum_1.xlsx

XLSX spreadsheet 16 KB Posted

Attached to
Asphalt Pavement Rejuvenation on the Hoosier NF
Solicitation number
AG-52B1-S-17-0025
Issued by

About this file

Revised Schedule of Items which replaces the original schedule. This new schedule must be included with your offer submission.

View the file

Other files

File Type Posted
Amendment_1_FBO.pdf PDF
Specifications.docx DOCX document
WageDetermination.pdf PDF
ConstructionRFQ_AG52B1S170025.rtf RTF text file
Maps.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Schedule of Items

2017 Hardin Ridge Recreation Area Asphalt Rejuvenation
Brownstown Ranger District
Hoosier National Forest SECTION B
SCHEDULE OF ITEMS (Revision 1-04/18/2017)
Begin Base Items
LineMethod ofUnitTotal
ItemDescriptionQuantityMeasureUnitPricePrice
1Mobilization1Lump SumLump Sum
1aPayment Bond/ILC Cost per $1000--Per $1000Per $1000N/A
LineMethod ofUnitTotal
ItemDescriptionQuantityMeasureUnitPricePrice
2aAsphalt Rejuvenation - FS Road 4725.000, Hardin Ridge Main Road31222Design QuantitySquare Yards
2bAsphalt Rejuvenation - FS Road 4725.010, Dump Station889Design QuantitySquare Yards
2cAsphalt Rejuvenation - FS Roads 4725.100 & 4725.101, Ampitheater4083Design QuantitySquare Yards
2dAsphalt Rejuvenation - FS Road 4725.110, Boat Ramp Overflow Parking2333Design QuantitySquare Yards
2eAsphalt Rejuvenation - FS Road 4725.160, Boat Ramp Parking8472Design QuantitySquare Yards
Total Base Bid Price =
End Base Items
Begin Optional Items
LineMethod ofUnitTotal
ItemDescriptionQuantityMeasureUnitPricePrice
3aAsphalt Rejuvenation - FS Road 4725.020, Eads3456Design QuantitySquare Yards
3bAsphalt Rejuvenation - FS Road 4725.030, Warehouse2878Design QuantitySquare Yards
3cAsphalt Rejuvenation - FS Road 4725.040, Holland3972Design QuantitySquare Yards
3dAsphalt Rejuvenation - FS Road 4725.050, Southern Point First Loop6389Design QuantitySquare Yards
3eAsphalt Rejuvenation - FS Road 4725.051, Southern Point Second Loop4228Design QuantitySquare Yards
3fAsphalt Rejuvenation - FS Road 4725.060, Bluegill First Loop4417Design QuantitySquare Yards
3gAsphalt Rejuvenation - FS Road 4725.061, Bluegill Second Loop5022Design QuantitySquare Yards
3hAsphalt Rejuvenation - FS Road 4725.071, Sewage Treatment Plant Road2522Design QuantitySquare Yards
3iAsphalt Rejuvenation - FS Road 4725.080, White Oak2933Design QuantitySquare Yards
3jAsphalt Rejuvenation - FS Road 4725.090, Beach Road9000Design QuantitySquare Yards
3kAsphalt Rejuvenation - FS Road 4725.091, Beach Overflow Parking1822Design QuantitySquare Yards
3lAsphalt Rejuvenation - FS Road 4725.120, Pine First Loop4167Design QuantitySquare Yards
3mAsphalt Rejuvenation - FS Road 4725.121, Pine Second Loop6533Design QuantitySquare Yards

Total Optional Items 3a through 3m =

LineMethod ofUnitTotal
ItemDescriptionQuantityMeasureUnitPricePrice
4aAsphalt Rejuvenation - Campsite Parking Areas100Design QuantitySquare Yards
4bAsphalt Rejuvenation - Campsite Parking Areas200Design QuantitySquare Yards
4cAsphalt Rejuvenation - Campsite Parking Areas300Design QuantitySquare Yards
4dAsphalt Rejuvenation - Campsite Parking Areas400Design QuantitySquare Yards
4eAsphalt Rejuvenation - Campsite Parking Areas500Design QuantitySquare Yards
4fAsphalt Rejuvenation - Campsite Parking Areas1000Design QuantitySquare Yards
4gAsphalt Rejuvenation - Campsite Parking Areas2000Design QuantitySquare Yards
4hAsphalt Rejuvenation - Campsite Parking Areas3000Design QuantitySquare Yards
4iAsphalt Rejuvenation - Campsite Parking Areas4000Design QuantitySquare Yards

Total Optional Items 4a through 4i =

LineMethod ofUnitTotal
ItemDescriptionQuantityMeasureUnitPricePrice
5aAddendum #1: Asphalt Rejuvenation - Blackwell Horse Camp, FS Roads 4731.010 and 4731.0111290Design QuantitySquare Yards
End Optional Items
End Schedule of Items
Contractor Acceptance Statement: By signing the offer, the Contractor agrees to all terms, conditions, and
provisions included in the solicitation and agrees to furnish any awarded items at the price set in the schedule
unless otherwise excepted as folllows: _____________________________________________________
NOTES:
a. There is a requirement for payment protections (Irrevocable Letter of Credit (ILC) or payment bond) if quote is
over $35,000. The payment bond or ILC will be for 100% of the award price. See section I for additional informatio.
b. Contractor must be registered in www.sam.gov to be considered. This is a free registration.
c. There is no pre-bid meeting. Contractors should visit the sites independently.
d. There is a requirement to submit a technical proposal with your offer. See Section L & M for instructions.
e. Award will be made to one contractor. You must submit pricing for all items, including option items.
f. Assume that there will be one mobilization for the project. Enter payment bond/ILC cost per $1000. Ie: if bond
costs are $25 per thousand, enter $25 in the unit price column. In this example, if we award $100,000 worth of work,
bond cost of $2500 will be added to the contract for a total award of $102,500.00.