Schedule of Items
| 2017 Hardin Ridge Recreation Area Asphalt Rejuvenation |
| Brownstown Ranger District |
| Hoosier National Forest SECTION B |
| SCHEDULE OF ITEMS (Revision 1-04/18/2017) |
| Begin Base Items |
| Line | | | Method of | | Unit | Total |
| Item | Description | Quantity | Measure | Unit | Price | Price |
| 1 | Mobilization | 1 | Lump Sum | Lump Sum | | |
| 1a | Payment Bond/ILC Cost per $1000 | -- | Per $1000 | Per $1000 | | N/A |
| Line | | | Method of | | Unit | Total |
| Item | Description | Quantity | Measure | Unit | Price | Price |
| 2a | Asphalt Rejuvenation - FS Road 4725.000, Hardin Ridge Main Road | 31222 | Design Quantity | Square Yards | | |
| 2b | Asphalt Rejuvenation - FS Road 4725.010, Dump Station | 889 | Design Quantity | Square Yards | | |
| 2c | Asphalt Rejuvenation - FS Roads 4725.100 & 4725.101, Ampitheater | 4083 | Design Quantity | Square Yards | | |
| 2d | Asphalt Rejuvenation - FS Road 4725.110, Boat Ramp Overflow Parking | 2333 | Design Quantity | Square Yards | | |
| 2e | Asphalt Rejuvenation - FS Road 4725.160, Boat Ramp Parking | 8472 | Design Quantity | Square Yards | | |
| Total Base Bid Price = |
| End Base Items | |
| Begin Optional Items | |
| Line | | | Method of | | Unit | Total |
| Item | Description | Quantity | Measure | Unit | Price | Price |
| 3a | Asphalt Rejuvenation - FS Road 4725.020, Eads | 3456 | Design Quantity | Square Yards | | |
| 3b | Asphalt Rejuvenation - FS Road 4725.030, Warehouse | 2878 | Design Quantity | Square Yards | | |
| 3c | Asphalt Rejuvenation - FS Road 4725.040, Holland | 3972 | Design Quantity | Square Yards | | |
| 3d | Asphalt Rejuvenation - FS Road 4725.050, Southern Point First Loop | 6389 | Design Quantity | Square Yards | | |
| 3e | Asphalt Rejuvenation - FS Road 4725.051, Southern Point Second Loop | 4228 | Design Quantity | Square Yards | | |
| 3f | Asphalt Rejuvenation - FS Road 4725.060, Bluegill First Loop | 4417 | Design Quantity | Square Yards | | |
| 3g | Asphalt Rejuvenation - FS Road 4725.061, Bluegill Second Loop | 5022 | Design Quantity | Square Yards | | |
| 3h | Asphalt Rejuvenation - FS Road 4725.071, Sewage Treatment Plant Road | 2522 | Design Quantity | Square Yards | | |
| 3i | Asphalt Rejuvenation - FS Road 4725.080, White Oak | 2933 | Design Quantity | Square Yards | | |
| 3j | Asphalt Rejuvenation - FS Road 4725.090, Beach Road | 9000 | Design Quantity | Square Yards | | |
| 3k | Asphalt Rejuvenation - FS Road 4725.091, Beach Overflow Parking | 1822 | Design Quantity | Square Yards | | |
| 3l | Asphalt Rejuvenation - FS Road 4725.120, Pine First Loop | 4167 | Design Quantity | Square Yards | | |
| 3m | Asphalt Rejuvenation - FS Road 4725.121, Pine Second Loop | 6533 | Design Quantity | Square Yards | | |
Total Optional Items 3a through 3m =
| Line | | | Method of | | Unit | Total |
| Item | Description | Quantity | Measure | Unit | Price | Price |
| 4a | Asphalt Rejuvenation - Campsite Parking Areas | 100 | Design Quantity | Square Yards | | |
| 4b | Asphalt Rejuvenation - Campsite Parking Areas | 200 | Design Quantity | Square Yards | | |
| 4c | Asphalt Rejuvenation - Campsite Parking Areas | 300 | Design Quantity | Square Yards | | |
| 4d | Asphalt Rejuvenation - Campsite Parking Areas | 400 | Design Quantity | Square Yards | | |
| 4e | Asphalt Rejuvenation - Campsite Parking Areas | 500 | Design Quantity | Square Yards | | |
| 4f | Asphalt Rejuvenation - Campsite Parking Areas | 1000 | Design Quantity | Square Yards | | |
| 4g | Asphalt Rejuvenation - Campsite Parking Areas | 2000 | Design Quantity | Square Yards | | |
| 4h | Asphalt Rejuvenation - Campsite Parking Areas | 3000 | Design Quantity | Square Yards | | |
| 4i | Asphalt Rejuvenation - Campsite Parking Areas | 4000 | Design Quantity | Square Yards | | |
Total Optional Items 4a through 4i =
| Line | | | Method of | | Unit | Total |
| Item | Description | Quantity | Measure | Unit | Price | Price |
| 5a | Addendum #1: Asphalt Rejuvenation - Blackwell Horse Camp, FS Roads 4731.010 and 4731.011 | 1290 | Design Quantity | Square Yards | | |
| End Optional Items |
| End Schedule of Items |
| Contractor Acceptance Statement: By signing the offer, the Contractor agrees to all terms, conditions, and |
| provisions included in the solicitation and agrees to furnish any awarded items at the price set in the schedule |
| unless otherwise excepted as folllows: _____________________________________________________ |
| NOTES: |
| a. There is a requirement for payment protections (Irrevocable Letter of Credit (ILC) or payment bond) if quote is |
| over $35,000. The payment bond or ILC will be for 100% of the award price. See section I for additional informatio. |
| b. Contractor must be registered in www.sam.gov to be considered. This is a free registration. |
| c. There is no pre-bid meeting. Contractors should visit the sites independently. |
| d. There is a requirement to submit a technical proposal with your offer. See Section L & M for instructions. |
| e. Award will be made to one contractor. You must submit pricing for all items, including option items. |
| f. Assume that there will be one mobilization for the project. Enter payment bond/ILC cost per $1000. Ie: if bond |
| costs are $25 per thousand, enter $25 in the unit price column. In this example, if we award $100,000 worth of work, |
| bond cost of $2500 will be added to the contract for a total award of $102,500.00. |