Amendment1.pdf
PDF 654 KB Posted
- Solicitation number
- AG-5114-S-10-AA09
About this file
RECOVERY - Ammendment 001 Pre bid meeting Q A Attendance Roster and Sketches
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment2.pdf | ||
| FINAL DRAWINGS.pdf | ||
| Solicitation.pdf | ||
| Return Bid Package.pdf | ||
| FINAL SPECIFICATIONS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or
(c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
BY
(Signature of Contracting Officer)
16C. DATE SIGNED
PREVIOUS EDITION UNUSABLE STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
This form was electronically produced by USDA/ARS/OCIO/ADB.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date,etc.)
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
4/1/2010
3/16/2010
J 1 7
Amendment 1
USDA-ARS-MWA
1815 N. University Street Peoria, IL 61604
Same as block 6
AG-5114-S-10-AA09
N/A
RECOVERY - Replace Greenhouse Glazing Systems, St. Paul, MN
Page two through six of the amendment is Addendum No.1 and contains questions and answers from the pre-bid meeting including attendance sign-in sheet, SK-1 detail attachment and SK-2 plan and photos. This amendment becomes part of the contract documents.
Task Order No. AG-5114-D-09-0080
Contract No. AG-3K15-53-3K154-1500 00201-1
BIDDING & CONTRACT REQUIREMENTS
Addendum No. 1
DATE: 3/31/2010
United States Department of Agriculture Agricultural Research Service
Bailey Edward Design, Inc.
35 E. Wacker, Suite 2800 Chicago, IL 60601
SUBJECT: ADDENDUM NO. 1 TO THE BIDDING DOCUMENT FOR:
GREENHOUSE 400 /401 – REPLACE GLAZING SYSTEM
USDA-ARS
CEREAL DISEASE LABORATORY
ST. PAUL, MN 55108
RFI QUESTIONS:
1. Div. 1 Gen Req’s, section 1.1: All work is to be completed by Sept. 1, 2010.
During today’s walkthrough, Omar, from Bailey [Edward] Design indicated many times that the intention was work would be coordinated with other contractors onsite doing work under a different contract (HVAC & Mechanical). Please confirm when this contract is to be awarded and when the contract re: HVAC and Mech is to be awarded.
Response: See Clarification Item 1
2. Div 8, 08 80 10-3, section 2.2 Sealant We are not sure Tremco Spectrum 2 is a sealant approved by the Acrylic glazing mfg.
What is the mfg approved sealant for the type of Acrylic? (mfg is Evonik Degussa Cyro).
Response: See Addendum Item 1.
3. Div 8, 08 80 10-4, section 3.2: Vent Panels This section states to disconnect all vent motor wiring before replacing vent glazing.
Please explain, or confirm this is in error, since there is no need to remove the vent motor to replace the glazing.
Response: See Addendum Item 2.
4. Div 8, 08 80 10-4, section 3.3: Field Quality Control Does the greenhouse leak now?
What are these test listed, ASTM E331 and ASTM 547, and do they have anything to do with greenhouse acrylic glazing?
Please provide these test requirements.
Who will be conducting these tests?
Response: See Clarification Item 2.
00201-2
5. Div 13, 13 34 13-4, section 2.2 Drive Shaft During today’s pre-bid walkthrough, the USDA-ARS CDL greenhouse representative stated the reason they are asking for new vent drive systems is that the existing drive shaft diameter is no longer available and vent operators that work with this drive shaft diameter are no longer available.
The specs are calling for the same diameter size as is currently installed (1.625”). Rough Brothers would recommend using a drive shaft diameter which is commonly used in this application and vent operators components (pinions and shaft hangers) can be easily obtained. This shaft diameter is 1.3125”. Please confirm this size is acceptable.
Response: See Addendum Item 3.
6. Div 13, 13 34 13-1, in bid options #2 & #3, section 1.3 and 1.4 Replacement of screens Specs refer to ‘replacement of side vent screens and frames. The existing screens are screwed into the greenhouse structure with screws. Rough Brothers would recommend installing one screen to include aluminum ½ H channel in a manner to allow USDA to easily remove the screen frames for required cleaning and maintenance. The specs nor dwgs indicate this installation method. Please confirm new screens are to be attached as old screens are currently attached. (if not, detail dwgs would be required).
Response: See Clarification item 3.
7. Drawing Sheet E-200, Plan notes #6 regarding Bid Option #5 Replacement of sidewall vent operating system – Please provide detail drawings. It is Rough Brothers’ understanding from viewing site conditions today, that installing vent drive and rack and pinion vent operators on the interior of the side vent, will not work.
Response: Addendum Item 4
8. Installation of new vent motors It was stated by the A/E firm representative many times in today’s pre-bid mtg that any new vent motors are to be installed and wired into existing wiring and any new control wiring and line voltage would be covered under another contract (HVAC and Mech.).
Please confirm.
Response: See Clarification Item 4.
9. Drawing Sheet E-100 States that contractor is to pay for all fees, connections charges, permits, and inspections.
Please confirm fees, permits, and connection changers are required in federal properties .
(i.e. this project).
Response: See Addendum Item 5.
CLARIFICATION ITEMS:
1. The bidding of the job should not be based on any coordination of work required under separate contract. The bid should only reflect the scope shown in the Drawings and Specifications for this project.
2. To our knowledge, the greenhouses do not leak.
00201-3
ASTM E 331 is “Standard Test Method for Water Penetration of Exterior Windows, Skylights, Doors, and Curtain Walls by Uniform Static Air Pressure Difference”.
ASTM E 547 is “Standard Test Method for Water Penetration of Exterior Windows, Skylights, Doors, and Curtain Walls by Cyclic Static Air Pressure Difference”.
Please contact the ASTM for detailed information on the requirements for these tests.
The Contractor must show that the test standards have been met. The Contractor may perform the tests, or the Contractor can hire a third party to conduct the tests.
3. There shall be no change to paragraph 2.4.
New screens shall be attached in the same manner that the existing screens are currently attached.
4. The Contractor is to attach new vent motors to existing controls.
ADDENDUM ITEMS:
1. Per Specification Section 08 80 10-3, for section 2.2.A.a Remove “Tremco Spectrum 2”.
Replace with “GE SilPruf silicone sealant” .
2. Per Specification Section 08 80 10-4, for section 3.2.A Delete “Contractor to disconnect all vent motor wiring and associated windmill wiring before replacing glazing on vent panels”.
No disconnection of the vent motor wiring is needed for the vent glazing replacement.
3. Per Specification Section 13 34 13, for section 2.2 Remove “Provide 1-5/8” (1.625”) galvanized steel shaft”.
Replace with “Provide 1.3125” galvanized steel shaft”.
4. Add SK-1 and SK-2 to the drawings
5. Fees, permits, and connection charges not required for this project.
ATTACHMENTS:
Sketch – SK-1 Detail (dated 03-29-2010) Sketch – SK-2 Plan and Photos (dated 03-29-2010)
This addendum consists of three pages of clarifications plus two pages of attachments.