citico_creek_road_resurfacing_plans.pdf
PDF 226 KB Posted
- Attached to
- Citico Creek Road Paving
- Solicitation number
- AG-4756-S-16-0016
About this file
Plans Citico Creek Paving
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_1.pdf | ||
| citico_creek_road_resurfacing_FSSS.pdf | ||
| AG-4756-S-16-0016.pdf | ||
| AG-4756-S-16-0016_Short.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USDA FOREST SERVICE
CHEROKEE NATIONAL FOREST
TELLICO RANGER DISTRICT
PLANS
for
HOT ASPHALT RESURFACING
on
CITICO CREEK ROAD, NFSR #35-1
CONTENTS
Area Map ………………………...…2 Section Location Map …..…… Schedule of Items …………………...4 Description & Construction Notes .…5-6 Schedule of Work……………………6
AREA MAP
ghubbard Oval ghubbard Callout
PROJECT LOCATION
SECTION LOCATION MAP
Rectangle
Rectangle
ITEM DESCRIPTION
METHOD OF
MEASUREMENT UNIT QUANTITY
40401
Minor Hot Asphalt Concrete for
Resurfacing, TDOT Grade C, Compaction Method C AQ Ton 106.0
41201
Tack Coat, Emulsified Asphalt, Grade SS‐1 AQ Gallon 85.0
ITEM DESCRIPTION
METHOD OF
MEASUREMENT UNIT QUANTITY
40401
Minor Hot Asphalt Concrete for
Resurfacing, TDOT Grade C, Compaction Method C AQ Ton 66.0
41201
Tack Coat, Emulsified Asphalt, Grade SS‐1 AQ Gallon 53.0
ITEM DESCRIPTION
METHOD OF
MEASUREMENT UNIT QUANTITY
40401
Minor Hot Asphalt Concrete for
Resurfacing, TDOT Grade C, Compaction Method C AQ Ton 125.0
41201
Tack Coat, Emulsified Asphalt, Grade SS‐1 AQ Gallon 100.0
ITEM DESCRIPTION
METHOD OF
MEASUREMENT UNIT QUANTITY
40401
Minor Hot Asphalt Concrete for
Resurfacing, TDOT Grade C, Compaction Method C AQ Ton 166.0
41201
Tack Coat, Emulsified Asphalt, Grade SS‐1 AQ Gallon 133.0
SCHEDULE OF ITEMS
BASE BID ITEM SECTION I (M.P. 0.00 ‐ 0.11)
ADD ITEM 1, SECTION II (M.P. 0.17 ‐ 0.23)
ADD ITEM 2, SECTION III (M.P. 0.27 ‐ 0.39)
ADD ITEM 3, SECTION IV (M.P. 0.90 ‐ 1.05)
DESCRIPTION OF WORK
Work consists of furnishing, installing, and maintaining traffic control devices, cleaning existing asphalt, applying tack coat, and placing C mix asphalt over the full width of existing asphalt and to a compacted thickness of 2” (unless otherwise noted in the Schedule of Work) on approximately 2,360 linear feet of the road. The existing asphalt width averages approximately 14’. The work shall occur on one, two, three, or four sections of the road as indicate on the SCHEDULE OF WORK.
CONSTRUCTION NOTES
GENERAL
All work shall be done in accordance with plans and Standard Forest Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-03 and all applicable Forest Service Supplemental Specifications (FSSS).
MAINTENANCE OF TRAFFIC
A traffic control plan shall be submitted and approved by the CO prior to the start of any work.
Prior to the start of the construction operations, the Contractor shall erect signs, barricades, and other traffic control devices. Traffic control devices shall be operated only when they are needed and only those devices that apply to conditions actually in existence shall be operable.
The Contractor without additional compensation shall replace any devices that are lost, stolen, destroyed, or deemed unacceptable by the CO, while their use is required on the project. Following completion of a particular construction operation, all warning signs, except those necessary for the safety of the public, shall be removed or entirely covered so that the sign panel will not be visible.
HOT ASPHALT CONCRETE PAVEMENT
The tack coat and its application shall be in accordance with FP-03 Section 412 and all applicable FSSS. The tack coat shall be applied at a rate of 0.1 gallons per square yard or as approved by the CO.
The asphalt mix shall meet requirements of Tennessee DOT specifications for grading C.
The asphalt shall be furnished from an approved TDOT plant not greater than 65 miles from Section I.
The contractor may place the asphalt overlay over the full existing road width in one pass with the paver.
M.P. ITEM
0.00 BEGINNING OF SECTION I: 0.14 miles South of Buck Highway Intersection
0.00 ‐ 0.11 Asphalt overlay on Section I: 585'
0.14 Intersection w/ Buck Highway
0.17 BEGINNING OF SECTION II
0.17 ‐ 0.23 Asphalt overlay on Section II: 340'
0.27 BEGINNING OF SECTION III
0.27 ‐ 0.39 Asphalt overlay Section III: 640'
0.90 BEGINNING OF SECTION IV
0.9 ‐ 1.05 Asphalt overlay Section IV: 795'
1.05 END OF SECTION IV AND E.O.P.
SCHEDULE OF WORK
File details come from the government source that posted it. Updated .