Amendment 1. Acknowledgement is required.

View the file

Other files

File Type Posted
citico_creek_road_resurfacing_FSSS.pdf PDF
citico_creek_road_resurfacing_plans.pdf PDF
AG-4756-S-16-0016.pdf PDF
AG-4756-S-16-0016_Short.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. CONTRACT ID CODE PAGE OF PAGES

AMENDMENT OF SOLICITATION / MODIFICATION OF CONTRACT 1 3

2. AMENDMENT NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NUMBER (if applic.)

1 4/13/2016 792454

6. ISSUED BY:

Cherokee National Forest 2800 North Ocoee Street Cleveland, TN 37312

7. ADMINISTERED BY (If other than 6.):

8. NAME AND ADDRESS OF CONTRACTOR

[ x ]

9A. AMENDMENT OF SOLICITATION NUMBER

AG-4756-S-16-0016

Citico Creek Road Paving 9B. DATED (see item 11)

3/29/2016

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (see item 13)

CODE FACILITY

11. THIS ITEM APPLIES ONLY TO AMENDMENTS OF SOLICITATIONS

[ X ] The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [ x ] is NOT extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning _____ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (if applicable)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

[ ] A. THIS CHANGE IS ISSUED PURSUANT TO:

THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

[ ] B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

[ ] C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (specify type of modification and authority )

E. IMPORTANT: Contractor [ ] is, [ ] is not required to sign this document and return copy(s) to the issuing office.

Notes from pre-bid meeting are attached. NOTE: AGAR 452.236-70, Additvie and Deductive Items, is added to Section M, Evaluation Factors for Award.

15A. NAME AND TITLE OF SIGNER (type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (type or print)

NINA B. BARROW, Contracting Officer 15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY: /s/ Nina B. Barrow 4/13/2016

(signature of authorized person) (signature of Contracting Officer)

NSN 7540-01-152-8070 30-105 SF 30 (REV. 10/83)

PRESCRIBED BY GSA/PREVIOUS EDITION UNUSABLE FAR (48 CFR) 53.243

Pre-Bid Meeting, Citico Creek Road Paving, AG-4756-S-16-0016 Contracting Officer’s Discussion Points

Attending for Government: Nina Barrow, Contracting Officer Gary Hubbard, Forest Engineer

Contractors Attending: Caldwell Paving/Seth Phillips, sphillips@caldwellpaving.com 8466 Hiwassee St. NE, Charleston TN 423-336-3841

Patty Construction Inc./Kim Patty, kim@pattyconstruction.com P.O. Box 396, Lenoir City, TN 37771 865-995-2456

Meeting was held on April 12, 2016 at 0930 at Tellico Ranger District Office. Site visit followed.

• Project is 100% set aside for Small Business. Price range: $25,000 - $150,000.

• Funding is currently only available for the base portion of the work. Additional funding may be received prior to award of contract to allow for one or more Add Items to be included in the award. If additional funds are obtained during construction, additional work will added by contract modification at the unit prices established.

Total award will not exceed $150,000. AGAR clause 452.236-70, Additive and Deductive Items, is added to Section M, Evaluation Factors for Award.

• This is a federal construction project. Construction Wage Rates apply (formerly Davis Bacon). You are required to make and keep payrolls, and submit certified payrolls weekly to COR. Retain records for 3 years, subject to DOL review. Note – minimum $10.15 wage.

• Registration in the System for Award Management is required for award. Go to https://www.sam.gov/ to register. Registration requires a DUNS number; go to http://www.dnb.com/ Registration is free for both Dun & Bradstreet and SAM.

• Bid bond is not required. Payment protection will be required if award exceeds $35,000 (note change from $30,000 shown in the solicitation, Section B. This may be made by using a payment bond, irrevocable letter of credit, or cashier’s check. A tripartite escrow agreement is not an acceptable form of payment protection for this solicitation.

• Award will be made on the basis of best value to the Government, using price, experience and past performance as evaluation factors. Price is somewhat more important than experience and past performance combined.

Award may be made to other than the lowest priced quotation.

• Successful contractor will have 10 days to furnish payment protection (if needed), in the amount of 100% of contract price. Quotes are due by 4:00 p.m. Tuesday, April 28, 2016. Quotes may be emailed or sent hard copy.

• Contract time: 20 days. Pre-work meeting will be held with the successful contractor. Work will start within 10 days of receiving the Notice to Proceed.

• Check FBO for amendments. Sign-in sheet and questions and answers from the meeting today will be posted.

• Gary Hubbard discussed contract specifications. There are four separate sections of road to be paved; a base section, MP 0.00 – 0.11, and three Add Items. Contractor will clean the existing asphalt surface, patch potholes, and pave with a 2” TDOT “C” mix. Road varies in width but averages 14’ wide.

https://www.sam.gov/ http://www.dnb.com/

• FP-03 specifications apply – in this case, Sections 404 and 412 are the most applicable

• Note: there is not a separate pay item for signing, but signing is required for the project.

• Asphalt plant must be less than 65 miles from project site.

• Mix temperature must be greater than 250 degrees before roller compaction.

• Asphalt testing is not required. If Forest Service has a concern about the mix at time of application, testing may be required. If mix conforms to specifications, Forest Service will pay for testing. If mix does not conform, Contractor pays.

• Note that quantities in the Schedule of Items are shown as “Approximate Quantities”. Payment will be made for quantities actually placed on the job as long materials meet specs.

• Contractor is required to comply with all contract specifications whether a Forest Service Inspector is on site or not.

• Contractor may delay traffic up to 45 minutes.

• Should be able to use the Young Br Horse Camp at the end of Section IV as a staging area except on the weekends.

• It’s preferable to either complete the work before Memorial Day or not start work until after Memorial Day.

Site visit followed. Meeting concluded at 1100.

AGAR 452.236-70, Additive or Deductive Items (FEB 1988) The low bidder for purposes of award shall be the conforming responsible bidder offering the low aggregate amount for the first or base bid item, plus or minus (in the order of priority listed in the schedule) those additive or deductive bid items providing the most features of the work within the funds determined by the government to be available before bids are opened. If addition of another bid item in the listed order of priority would make the award exceed such funds for all bidders, it shall be skipped and the next subsequent additive bid item in a lower amount shall be added if award therein can be made within such funds. For example, when the amount available is $100,000 and a bidder's base bid and four successive additives are $85,000, $10,000, $8,000, $6,000, and $4,000, the aggregate amount of the bid for purposes of award would be $99,000 for the base bid plus the first and fourth additives, the second and third additives being skipped because of each of them would cause the aggregate bid to exceed $100,000. In any case all bids shall be evaluated on the basis of the same additive or deductive bid items, determined as above provided. The listed order of priority need be followed only for determining the low bidder. After determination of the low bidder as stated, award in the best interests of the Government may be made on the selected first or base bid item and any combination of additive or deductive items for which funds are determined to be available at the time of the award, provided that award on such combination of bid items does not exceed the amount offered by any other conforming responsible bidder for the same combination of bid items.