SF-30_Amendment_02.pdf
PDF 89 KB Posted
- Attached to
- Moses Creek -East Fork AOP Culvert Replacement Federal contract opportunity
- Solicitation number
- AG-4568-S-17-0028
- Issued by
- Department of Agriculture Forest Service
About this file
SF-30 Amendment 02
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_03_Revised_Schedule_of_Items_07312017.xlsx | XLSX spreadsheet | |
| Moses_Creek_AOP_Culvert_Replacement_PreBid_Q&A.docx | DOCX document | |
| Moses_Creek_AOP_Pre-Bid_Sign-In_Sheet_07182017.pdf | ||
| Attachment_02_Moses_Creek_AOP_DwgRev2_07312017.pdf | ||
| Attachment_02_NFSR_Moses_Creek_SUP_SPECS_Revised_07312017.doc | DOC document | |
| Amendment_01_Attachment_03_Schedule_of_Items.xlsx | XLSX spreadsheet | |
| Amendment_01_Attachment_02.pdf | ||
| Amendment_01_SF-30.pdf | ||
| Attachment_01.docx | DOCX document | |
| SF-1442.pdf | ||
| Attachment_04_Experience_Questionnaire.docx | DOCX document | |
| Sol__Body_AG-4568-S-17-0028.rtf | RTF text file | |
| Attachment_03_Schedule_of_Items.xlsx | XLSX spreadsheet | |
| Attachment_02_SOW.pdf | ||
| DRAFT_NFSR_Moses_Creek_SUP_SPECS.doc | DOC document | |
| 03-30-17_Moses_Creek_East_Fork_Binder.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
AG-4568-S-17-0028
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
ASHEVILLE NC 28804
200 WT WEAVER BLVD
SOUTHERN RESEARCH STATION
USDA FOREST SERVICE
SOUTHERN RESEACH STN - HQ ASHEVILL
07/06/2017000002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
07/06/2017
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
NFNC Moses Creek AOP Culvert Replacement
Modification 002 incorporates the following:
Questions and Answers provided within this SF-30 answered at the Pre-Bid meeting on July
18, 2017 10:00am.
Attaches the Pre-bid Meeting Attendance Sheet
Updated Specifications/Maps/Drawings/AOP Attachment 02
Schedule of Items Attachment 03
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
TAKELE WOLDU
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
AG-4568-S-17-0028/000002
Extends the Response date to August 14, 2017
12:00 pm Eastern Time.
All other Solicitation Terms and conditions remain unchanged.
Questions and Answers:
Statement of Work:
(Q) What will be the start date for the period of performance?
(A) The start date will be the Fall of 2017 with all in stream work starting April 15, 2018.
Bid Schedule:
(Q) Where will pay item 60305 be installed?
(A) Item deleted please see revised (7/31/2017)
Bid Schedule
(Q) What size is the material that is ask for in pay items 64805A and 64805B?
(A) Please see revised specifications section 648
Drawings/Plans:
(Q) If bedrock is encountered will contractor have to dowel footing into bedrock?
(A) Yes, per drawings sheet 11/14.
(Q) Does encountering bedrock determine the footing depth to be 24¿ or 36¿ or does this determine whether the footing is to be either 24¿ or 36¿ below natural streambed?
(A) Both. Refer to revised drawings sheet 11/14.
Specifications:
Offerors were instructed that a final set of specs would be uploaded to Fed Biz Opps. in the coming weeks to replace the draft specs.
General Questions:
(Q) If an offeror has ¿native¿ rock available to them that will meet contract requirements will it be acceptable to use this native rock?
(A) Rock similar to natural stream bed rock is required, see revised specifications.
(Q) Will unsuitable excavated be required to be hauled off site if encountered?
(A) Unsuitable material will be wasted on project site at the direction of and at the location determined by COR.
(Q) If fill material is needed at the project site will it be provided by USFS (borrow pit) or will the contractor need to import?
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
3 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
AG-4568-S-17-0028/000002
(A) If fill material generated from structural excavation if found to be unsuitable, imported
NCDOT ABC will be used and paid for under Bid
Item 30109.
(Q) Will there be anything going on or any time of year that the contractor would have to shut down operations?
(A) No, A timber sale will still be ongoing on
NFSR 4651, but the road will be open.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
File details come from the government source that posted it. Updated .