Attachment_02_Moses_Creek_AOP_DwgRev2_07312017.pdf
PDF 8 MB Posted
- Attached to
- Moses Creek -East Fork AOP Culvert Replacement Federal contract opportunity
- Solicitation number
- AG-4568-S-17-0028
- Issued by
- Department of Agriculture Forest Service
About this file
Revised Attachment 02 Part 01
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Moses_Creek_AOP_Culvert_Replacement_PreBid_Q&A.docx | DOCX document | |
| Moses_Creek_AOP_Pre-Bid_Sign-In_Sheet_07182017.pdf | ||
| Attachment_03_Revised_Schedule_of_Items_07312017.xlsx | XLSX spreadsheet | |
| Attachment_02_NFSR_Moses_Creek_SUP_SPECS_Revised_07312017.doc | DOC document | |
| SF-30_Amendment_02.pdf | ||
| Amendment_01_Attachment_03_Schedule_of_Items.xlsx | XLSX spreadsheet | |
| Amendment_01_Attachment_02.pdf | ||
| Amendment_01_SF-30.pdf | ||
| SF-1442.pdf | ||
| Attachment_04_Experience_Questionnaire.docx | DOCX document | |
| Attachment_01.docx | DOCX document | |
| Sol__Body_AG-4568-S-17-0028.rtf | RTF text file | |
| Attachment_03_Schedule_of_Items.xlsx | XLSX spreadsheet | |
| Attachment_02_SOW.pdf | ||
| DRAFT_NFSR_Moses_Creek_SUP_SPECS.doc | DOC document | |
| 03-30-17_Moses_Creek_East_Fork_Binder.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NATIONAL FORESTS IN NORTH CAROLINA
NANTAHALA NATIONAL FOREST
NANTAHALA RANGER DISTRICT
NFSR # 4651D MOSES CREEK EAST FORK
AQUATIC ORGANISM PASSAGE
SHEET NO CONTENT
1 COVER SHEET
EXISTING SITE CONDITIONS (TERRAIN OVER VIEW)
CONSTRUCTION NOTES
TYPICAL ROAD SECTION AND GENERAL NOTES
SITE & GRADING PLAN - A.O.P.
GENERAL CULVERT DETAILS
CULVERT END VIEW AND CROSS SECTIONS - A.O.P.
STREAM DIVERSION & DEWATERING DETAILS
TRAFFIC MAINTENANCE
FOOTING & HEADWALL DETAILS
N O
R T
H
N
C
S
C
NC
GA
B
L
U
E
R
I
D
G
E
B
R
P
B
R
P
Sylva
Franklin
Cashiers
Highlands
Rosman
Cullowhee
Waynesville
Asheville
I-26
I-40
Brevard
NANTAHALA Forest
Glenville
Lake
- VICINITY MAP -
P
A
R
K
W
A
Y
PROJECT SITE
HEADWALL & WING WALL FOUNDATION PLAN - A.O.P.
EXISTING SITE CONDITIONS (AERIAL - A.O.P.)
TRAFFIC SIGNAGE
FOOTING & HEADWALL DETAILS 2
REV. 7.31.17
REV. 7.31.17
REV. 7.31.17
REV. 7.31.17
REV. 7.31.17
REV. 7.31.17
REV. 7.31.17
REV. 7.31.17
REV. 7.31.17
REV. 7.31.17
REV. 7.31.17
REV. 7.31.17
REV. 7.31.17
REV. 7.31.17
Date
Date
Date
RECOMMENDED BY: Mike Wilkins - District Ranger
APPROVED BY: Allen Nicholas - Forest Supervisor
RECOMMENDED BY: Barry Jones
REGION 8
U.S.D.A. FOREST SERVICE
NATIONAL FORESTS IN N.C.
Engineering, Heritage, Recreation, Lands and Special Uses Staff Officer
Designed by:
Checked by:
NANTAHALA NATIONAL FOREST
/s/ G. Lee Wood
/s/ J. Barry Jones
*PRINT DRAWINGS IN 11" X 17"
/s/ J. Barry Jones
/s/ Mike Wilkins
/s/ Allen Nicholas
Total watershed area above Existing 48" Culvert: 531.6 AC
Min elevation: 3780 ft / Max elevation: 5226 ft
Approximate Stream length in watershed: 27120 LF
(5.14 miles above crossing)
WATERSHED AREA ABOVE CROSSING
NFSR # 4651D MOSES CREEK - EAST FORK
AQUATIC ORGANISM PASSAGE
SCALE: 1" = 600'
300'
0'
300' 600'
N O
R T
H
TP #3 - 60D NAIL
N: 610,868.17' E: 782,258.68'
ELEV.: 3,783.25'
TP #4 - 60D NAIL
N: 610,823.78' E: 782,198.86'
ELEV.: 3,773.63'
TP #5 - 60D NAIL
N: 610893.21' E: 782316.06'
ELEV.: 3781.11'
TP #7 - 60D NAIL
N: 611051.62' E: 782292.35'
ELEV.: 3795.36'
SCALE: 1" = 60'
30'
0'
30' 60'
N O
R T
H
NFSR # 4651D MOSES CREEK - EAST FORK
AQUATIC ORGANISM PASSAGE
GENERAL NOTES:
1. FOR THIS PROJECT STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL
HIGHWAY PROJECTS AND SPECIAL PROJECT SPECIFICATIONS WILL BE USED, HEREINAFTER REFERRED TO
AS FP-03 SPEC.
2. STORAGE OF ALL EQUIPMENT ON SITE WILL BE AT THE CONTRACTOR'S RISK AND AT A LOCATION
APPROVED BY THE CONTRACTING OFFICER.
3. CONSTRUCTION EQUIPMENT SHALL BE CONFINED TO THE ROADWAY, UNLESS OTHERWISE APPROVED
BY THE CONTRACTING OFFICER.
4. ALL EXCAVATION IS CONSIDERED TO BE UNCLASSIFIED.
5. CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIR OF DAMAGE TO NATIONAL FOREST ROADS DUE TO
TRANSPORTATION OF CONTRACTORS EQUIPMENT AND OR MATERIALS.
6. CONTRACTOR SHALL BE RESPONSIBLE FOR DIVERSION OF WATER DURING CONSTRUCTION AS REQUIRED;
CONTRACTOR SHALL FOLLOW BEST MANAGEMENT PRACTICES (BMP'S) TO ENSURE QUALITY.
7. EACH CULVERT'S LOCATION, LENGTH AND SKEW SHALL BE FIELD VERIFIED BY THE CONTRACTOR AND
APPROVED BY THE CONTRACTING OFFICER PRIOR TO ORDERING.
8. WOODY MATERIAL CUT DURING CULVERT INSTALLATION SHALL BE SCATTERED OUTSIDE
THE CLEARING LIMITS.
9. EXISTING CULVERTS TO BE REMOVED ARE THE PROPERTY OF THE CONTRACTOR AND SHALL
BE REMOVED FROM NATIONAL FOREST LANDS AND DISPOSED OF PROPERLY.
10. FILL SLOPE= 1.5:1, CUT SLOPE=1:1, OR AS STAKED BY THE CONTRACTING OFFICER OR AS
SHOWN ON THE PLANS.
11. WOODY MATERIAL GREATER THAN 2" IN DIAMETER OR LONGER THAN 3' SHALL NOT BE
INCORPORATED INTO CONSTRUCTED FILLS.
12. DEPTHS OF MATERIALS SHOWN ON THE PLANS ARE FINAL IN-PLACE COMPACTED DEPTHS.
13. ALL RIPRAP SHALL BE PLACED BY HAND OR MACHINE, NOT SIDE CAST OR END DUMPED.
14. ALL PERMANENT SIGNS SHALL BE SECURED WITH TAMPER-RESISTANT HARDWARE APPROVED
BY THE CONTRACTING OFFICER.
15. PRIOR TO ANY EXCAVATION, CALL "NORTH CAROLINA ONE-CALL CENTER" AT 1-800-632-4949 OR 8-1-1.
16. THE CONTRACTOR IS RESPONSIBLE FOR ALL TRAFFIC CONTROL INCLUDING TEMPORAR SIGNING AND
PROTECTION OF THE PUBLIC. SIGNAGE BEYOND THOSE SHOWN ON THE DRAWING MAY BE REQUIRED.
17. TRAFFIC CONTROL SIGNS SHALL CONFORM TO MUTCD SPECIFICATIONS.
18. ALL DRAINAGE STRUCTURES CONSTRUCTED/RECONSTRUCTED/RECONDITIONED SHALL BE
CONSTRUCTED/RECONSTRUCTED/RECONDITIONED TO DRAIN.
19. STATIONS/MILEPOSTS IDENTIFIED FOR AGGREGATE PLACEMENT ARE FULL DEPTH, CONTRACTOR SHALL
TAPER AGGREGATE 10' AHEAD AND BACK OF THE DEFINED STATION/MILEPOST, FOR A SMOOTH TRANSITION.
20. ALL STAKES AND FLAGGING IN THE FIELD THAT WERE USED FOR PROJECT IMPLEMENTATION SHALL BE
GATHERED & REMOVED FROM FOREST LAND BY THE CONTRACTOR PRIOR TO FINAL ACCEPTANCE OF THE
PROJECT. THIS WORK IS CONSIDERED PART OF MOBILIZATION AND NO SEPARATE PAYMENT T WILL BE MADE.
GENERAL NOTES: PAY ITEMS
1. CONTRACTOR IS RESPONSIBLE FOR PROTECTION OF ALL SURVEY STAKES AND MONUMENTS, QUALITY
CONTROL, AND SAMPLING AND TESTING, NO SEPARATE PAYMENT WILL BE MADE.
2. CLEARING REQUIRED FOR CONSTRUCTION, RECONSTRUCTION, MAINTENANCE, INSTALLATION OF OUTLET
DITCHES, CULVERT INSTALLATIONS AND RIPRAP PLACEMENT IS INCIDENTAL TO THAT WORK REQUIREMENT
AND NO SEPARATE PAYMENT WILL BE MADE.
301 AGGREGATE SURFACE COURSE: THIS ITEM INCLUDES ALL ABC STONE USED IN PROJECT,
INCLUDING SURFACING, PIPE BEDDING, SHOULDERS, TURNOUTS, TURNAROUNDS, & CURVE
WIDENING.
FORMLINERS:
1. FORMLINERS SHALL BE ROCK DRY STACK PATTERN AS MANUFACTURED BY FITZGERALD FORMLINERS.
1341 EAST POMONA ST. SANTA ANA, CA. (714-547-6710) OR APPROVED EQUAL. FORMLINERS SHALL
BE INSTALLED IN ACCORDANCE WITH MANUFACTURERS GUIDELINES AND THE APPLICABLE SUBSECTIONS
OF FP-03 SECTION 613. PROVIDE 3' X 3' TEST SECTION FOR APPROVAL. THERE SHALL BE NO OBVIOUS SEAMS
OR JOINTS BETWEEN FORMLINER SECTIONS. CORNERS SHALL BE MITRED. FORMLINERS WILL NOT BE
MEASURED BUT ALL COSTS ASSOCIATED WITH PROVIDING. INSTALLING AND REMOVING SHALL BE INCLUDED
IN THE PRICE BID FOR STRUCTURAL CONCRETE.
EROSION AND SEDIMENT CONTROL:
1. EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE INSTALLED PRIOR TO BEGINNING EARTH DISTURBING
ACTIVITIES IN ACCORDANCE WITH THE APPROVED EROSION CONTROL PLAN. ADDITIONAL EROSION AND
SEDIMENT CONTROL MEASURES MAY BE REQUIRED BY CONTRACTING OFFICER.
2. STABILIZATION MEASURES SHALL BE INITIATED AS SOON AS PRACTICABLE IN PORTIONS OF THE SITE WHERE
CONSTRUCTION ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED, BUT IN NO CASE MORE THAN 14
DAYS AFTER WORK HAS CEASED.
3. ALL SEDIMENT AND EROSION CONTROL DEVICES SHALL BE INSPECTED EVERY SEVEN +7) DAYS OR AFTER EACH
RAINFALL OCCURRENCE THAT EXCEEDS ONE-HALF +1/2) INCH. DAMAGED OR INEFFECTIVE DEVICES SHALL BE
REPAIRED OR REPLACED.
4. CONTRACTOR SHALL PROVIDE SILT FENCE AND/OR OTHER CONTROL DEVICES, AS MAY BE REQUIRED TO
CONTROL SOIL EROSION DURING ROAD CONSTRUCTION.
5. SEDIMENT SHALL BE REMOVED FROM BEHIND TEMPORARY SILT FENCING WHEN THE DEPTH OF SEDIMENT
REACHES 6 INCHES.
6. ALL DISTURBED AREAS WHERE EARTH IS EXPOSED SHALL BE CLEANED, GRADED SMOOTH, SHAPED TO DRAIN, AND SEEDED.
7. SEE SUPPLEMENTAL SPECIFICATION 713 - "ROADSIDE IMPROVEMENT MATERIAL" FOR SEED & FERTILIZER
MIXTURE. WHEN SECTION 625 IS NOT INCLUDED IN THE BID SCHEDULE, SEEDING IS CONSIDERED INCIDENTAL TO
OTHER WORK AND THERE WILL BE NO SEPARATE PAYMENT. REPAIR SEEDING IF INITIAL SEEDING DOES NOT
ESTABLISH SATISFACTORY COVER TO CONTROL EROSION, REPAIR WASHES, PREPARE SOIL, SEED AND MULCH AS
BEFORE.
8. ALL TEMPORARY SEDIMENT CONTROL MEASURES AND PRACTICES SHALL BE REMOVED WITHIN TWO +2) MONTHS
AFTER THE FOREST SERVICE HAS ACCEPTED THE PROJECT.
NFSR # 4651D MOSES CREEK - EAST FORK
AQUATIC ORGANISM PASSAGE
GENERAL CONSTRUCTION NOTES
1. SUBMIT A TRAFFIC PLAN FOR REVIEW BY THE CONTRACTING OFFICER PRIOR
TO THE START OF OPERATIONS. USE TRAFFIC RELATED SIGNING AND
FLAGGERS IN ACCORDANCE WITH MUTCD AN OSHA REQUIREMENTS.
2. IT IS THE CONTRACTOR'S RESPONSIBILITY TO ENSURE THE SAFETY OF ALL
ROAD USERS DURING THE LIFE OF THE CONTRACT.
3. PRIOR TO START OF EARTHWORK OR STOCKPILING OF EARTH MATERIALS,
REMOVE AND CONSERVE SURFACE LAYER OF ORIGINAL SOIL. REDISTRIBUTE
CONSERVED ORGANICS OVER ALL FINISHED SOIL SLOPES. CONSERVATION AND
REDISTRIBUTION OF ORGANICS IS SUBSIDIARY TO SECTION 209.
4. CONTRACTING OFFICER APPROVAL REQUIRED PRIOR TO PLACEMENT OF
THE FOLLOWING ITEMS: CONCRETE FORMS, STRUCTURAL OR LEAN
CONCRETE, STREAM FLOW THROUGH BYPASS PIPE OR OVER NEWLY
CONSTRUCTED STREAM BED, BACKFILLING AROUND PIPE OR ARCH OR
FOOTINGS, CRUSHED AGGREGATE BASE/SURFACING.
5. CEASE DOWNWARD EXCAVATION WHEN BEDROCK IS ENCOUNTERED AND
NOTIFY CONTRACTING OFFICER +LATERAL EXCAVATION ABOVE BEDROCK
SURFACE MAY CONTINUE) CO WILL MAKE FINAL ADJUSTMENTS TO
FOUNDATION ELEVATIONS AFTER ENTIRE BEDROCK SURFACE IS EXPOSED
AND WILL NOTIFY CONTRACTOR IN WRITING WHEN FINAL FOOTING OR PIPE
INVERT ELEVATIONS ARE DETERMINED.
6. REPAIR ANY DAMAGE TO THE EXISTING ROAD SYSTEM DUE TO
CONTRACTOR'S OPERATIONS, INSIDE OR OUTSIDE THE WORK AREA,
AT THE CONTRACTOR'S EXPENSE, PRIOR TO FINAL ACCEPTANCE.
7. COVER ALL SOIL DISTURBED BY CONSTRUCTION, EXCEPT THE ROADBED,
WITH A 1-INCH LAYER OF CERTIFIED WEED-FREE GRAIN STRAW. THIS WORK IS
SUBSIDIARY TO SECTION 157.
8. PRIOR TO USE AT PROJECT SITE, WATER PUMP(S), HOSES, INTAKES, AND
SCREENS SHOULD BE CLEANED OF MUD AND ORGANIC DEBRIS (VEGETATION,
LEAVES, ETC.) BY WASHING WITH HIGH PRESSURE WATER. ALL EQUIPMENT
SHOULD BE ALLOWED TO THOROUGHLY DRY FOR A MINIMUM OF 24 HOURS
PRIOR TO USE AT THE PROJECT SITE. WADERS SHOULD BE CLEANED OF ANY
MUD AND EITHER DRIED FOR A MINIMUM OF 2 WEEKS PRIOR TO USE AT THE
PROJECT SITE OR DIPPED IN A 1% BLEACH SOLUTION FOR 10 MINUTES.
ALIGNMENT AND GRADING, AS SHOWN ON THE DRAWINGS, ARE SUBJECT TO FIELD ADJUSTMENT.
ROADWAY CONSTRUCTION NOTES:
FINISH ROADWAY CONSTRUCTION TOLERANCE SHALL BE PRECISION CLASS E.
3%
3%
14'
M
I N
S
L
O
P
E
V
A
R
I
E
S
S
L
O
P
E
V
A
R
I
E
S
WHERE APPLICABLE (DITCH)
TYPICAL DITCH SECTION - AGGREGATE SURFACE
3% 3%
M
I N
4" ABC AGGREGATE
ROADBED
2.0' 2.0'
(OR MATCH EXISTING)
A.O.P.
NOT TO SCALE
14'2.0' 2.0'
(OR MATCH EXISTING)
EXISTING STREAM BED
PROPOSED
PLATE
PROPOSED
GRADE
EXISTING
GRADE
PROPOSED
GRADE
4" ABC AGGREGATE
ROADBED
TP #3 - 60D NAIL
N: 610,868.17' E: 782,258.68'
ELEV.: 3,783.25'
TP #4 - 60D NAIL
N: 610,823.78' E: 782,198.86'
ELEV.: 3,773.63'
TP #5 - 60D NAIL
N: 610893.21' E: 782316.06'
ELEV.: 3781.11'
SCALE: 1" = 20'
10'
0'
10' 20'
J U
N
T R
U
N
O R
T H
B
Y
S
O L A
R
O
B S
E R
V A
T I O
N
ANTI-SEEP
COLLAR
OVERFLOW WIDTH 1/2 "BANKFULL"
STREAMBED
VARIES AS NEEDED
SANDBAGS
SANDBAG BYPASS DAM DETAILS
GEOTEXTILE-WRAPPED STRAW BALE SEDIMENT CONTROL WEIR
GEOTEXTILE
MIRAFI 140N
OR EQUAL
SECTION VIEW
STREAMBED
STRAW BALES
GEOTEXTILE
MIRAFI 140N
OR EQUAL
BANKFULL
PLAN VIEW
STRAW BALES
STREAMBED
IMPERVIOUS MEMBRANE KEY TRENCH
AS NEEDED TO CONTROL SEEPAGE
UNDER IMPERVIOUS MEMBRANE
FILL WITH CLEAN GRAVEL
BYPASS PIPE
30" DIAMETER
MINIMUM
SANDBAGS
IMPERVIOUS MEMBRANE
DOWNSTREAM END
PROFILE VIEW
STREAM FLOW
2' MIN.
(NOT TO SCALE)
(NOT TO SCALE)
2' MIN.
ANTI-SEEP
COLLAR
ANTI-SEEP
COLLAR
" PLYWOOD
SHEET
BYPASS
PIPE
6 MIL PLASTIC
SHEETING
OPTIONAL ANTI-SEEP COLLAR DETAIL
S T
R E
A M
F L
O W
REMOVE SEDIMENT/TURBIDITY
BEFORE ALLOWING WATER
TO RE-ENTER STREAM
TYPICAL SECTION C-C
REMOVED DAM
AREA
BYPASS PIPE
1.5
STREAM
FLOW
"BROWN-WATER"
SUMP
ELBOW JOINTS
AS NEEDED
BYPASS SCHEMATIC - TYPICAL PLAN VIEW
(NOT TO SCALE)
GEOTEXTILE-WRAPPED
STRAW BALE SEDIMENT
CONTROL WEIR
REMOVE SEDIMENT WHEN
1/2 HEIGHT OF THE
STRAW BALES
EXCAVATION
SLOPE
BYPASS DAM
(SEE DETAILS)
FLOW
BYPASS PIPE
30" DIAMETER
MINIMUM
NOTES
1. THIS DEWATERING & SEDIMENT CONTROL PLAN SHOWS THE
MINIMUM ACCEPTABLE CRITERIA, AND MAY REQUIRE ADDITIONAL
MEASURES. THE CONTRACTOR WILL SUBMIT A DESIGN/PLAN
TO THE C.O.R. FOR APPROVAL THAT MEETS OR EXCEEDS THE STANDARDS
SHOWN HEREON.
2. MAINTAINING WATER TURBIDITY DOWNSTREAM (NOT EXCEEDING
THE TURBIDITY OF THE UPSTREAM WATER) IS THE RESPONSIBILITY OF THE
CONTRACTOR THROUGHOUT THE DURATION OF THE PROJECT.
3. PUMPS CAPABLE OF PUMPING STREAM FLOW SHALL BE ON-SITE
UNTIL STREAM IS FLOWING ON APPROVED FINISHED STREAMBED.
4. OVERNIGHT PUMPING IS NOT PERMITTED, OPERATE "BROWN-WATER" SUMP
AT END OF WORK DAY UNTIL SUMP WATER IS CLEAR.
5. MATERIAL HANDLING BAGS MAY BE USED, INSTEAD OF SANDBAGS,
WHERE THEY ARE MORE EFFECTIVE.
6. THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING THE NEW CONSTRUCTION
AREA IN AS DRY A CONDITION AS POSSIBLE DURING CONSTRUCTION.
GRANULAR BACKFILL
SECTION 703.03(a)
GRANULAR BACKFILL
SECTION 703.03(a)
IMPERVIOUS MEMBRANE
UPSTREAM END
(NOT TO SCALE)
(NOT TO SCALE)
C
C
DEWATERING DETAILS
THIS PLAN IS FOR EXAMPLE ONLY - NOT REQUIRED - CONSIDER AS GUIDANCE
BYPASS NOTES
1. BYPASS PIPE: MINIMUM DIAMETER: 30" (SUMMER FLOWS)
LENGTH: _____ (APPROX.)
GRADE: _____% (APPROX.)
45 DEGREE ELBOWS REQUIRED: ___ (MIN.)
2. BYPASS PIPE UNDER FINISHED:
HIGH DENSITY POLYETHYLENE PIPE MEETING REQUIREMENTS OF
SEC. 602 MITER ENDS TO FINISHED FILL SLOPES. PAYMENT
SUBSIDIARY TO ITEM 15713.
3. REMOVE ALL DEWATERING FACILITIES WHEN NEED IS GONE.
CONTRACTOR'S OPTION TO REMOVE THE DEWATERING PIPE FROM
UNDER FILL OR PLUG EACH END WITH CONCRETE AND LEAVE IN PLACE.
NOTE:
THIS DRAWING IS A GRAPHIC REPRESENTATION OF A TYPICAL WATER
DIVERSION INSTALLATION.
AFTER THE AWARD OF THE CONSTRUCTION CONTRACT, THE CONTRACTOR
WILL PROVIDE A DESIGN/PLAN TO MEET OR EXCEED THE STANDARDS SHOWN
HERE AND TO MEET THE APPROVAL OF THE C.O.R.
ELEVATION VIEW
ANTI-SEEP
COLLAR
BANKFULL
NOTES:
1. EXCAVATE BEDROCK TO PLACE FOOTINGS (24" MINIMUM), BOTTOM
ELEVATION OF FOOTINGS MAY VARY IF BEDROCK IS PRESENT. A FOOTING
DEPTH OF 24 INCHES DEPTH SHALL BE MAINTAINED ON THE BEDROCK. IF
BED ROCK IS NOT ENCOUNTERED, THE FOOTING DEPTH IS A MINIMUM
OF 36 INCHES.
2. BOX CULVERT IS ALUMINUM STRUCTURAL PLATE
(ALSP-IV-3 SPEC SASD) OR APPROVED EQUAL.
3. CONTRACTOR SHALL SUBMIT THREE COPIES OF ANY
CHANGE OF MANUFACTURER FOR APPROVAL OF
SPAN, RISE, BASE CONNECTION AND OTHER RELATED MATERIALS.
/4
/8
CULVERT DETAILS
SPECIFICATION - ALUMINUM STRUCTURAL PLATE
Scope: This specification covers the manufacture and installation of the aluminum structural plate structure detailed in the plans.
Material: The aluminum structural plate structure shall consist of plates and appurtenant items as shown on the plans and shall conform to the requirements of AASHTO M 219 and ASTM B 746.
The corrugated plate (and ribs if required) shall be curved and bolt hole punched at the plant. Plate thickness and rib spacings shall be as indicated on the plans. All manufacturing processes including corrugating, punching, curving and galvanizing shall be performed within the United States using raw materials made in the
United States.
Bolts and nuts shall conform to the requirements of ASTM
A307 or ASTM A449.
Assembly: The structure shall be assembled in accordance with the shop drawings provided by the manufacturer and per the manufacturer’s recommendations. Bolts shall be tightened using an applied torque of between 100 and 150 ft.-lbs.
Installation: The structure shall be installed in accordance with the plans and specifications, the manufacturer’s recommendations, and the AASHTO Standard Specifications for Highway Bridges, Section 26 (Division II).
Backfill: The structure shall be backfilled using clean well graded granular material that meets the requirements of AASHTO
M 145 for soil classifications A-1, A-2 or A-3.
Backfill must be placed symmetrically on each side of the structure in 6 to 8 inch lifts. Each lift shall be compacted to a minimum of 90 percent density per AASHTO T 99.
Note: Construction loads that exceed highway load limits are not allowed on the structure without approval from the Contracting Officer.
BASE CHANNEL DETAIL
NOT TO SCALE
UPPER END ELEVATION (NE SIDE)
CROSSING ONE - OBLIQUE VIEW (NORTH)
V a r i e s
7'
20.0'
18.0'
20.0'
18.0'
FOOTING DEPTH VARIES
BASED ON BEDROCK
7'
NOT TO SCALE
NOT TO SCALE
This specification covers the design, manufacturing and installation of the
ALUMINUM STRUCTURAL PLATE 9 inch x 2-1/2 inch corrugated aluminum structural plate structure detailed in the plans.
Aluminum Pure Arch, 18’ x 5’-9” x 36.0’ Long
Opening:103.9 sq.ft
Thickness: 0.125” Thick
Type 4 Ribs @ 27”
Min/Max Cover: 2.5’/19’
Square Ends
ANCHOR BOLTS
3/4 x 2" BOLT & NUT
3/4" x 4" x 9" ANCHOR
SIDE ANGLE= 10.07°
4 7/8"
SUPER-COR SIDE / HAUNCH PLATE
SPACED @ 15" C-C
STRUCTURE
ON THE INSIDE CREST
USE LOWER HOLES FOR ASSEMBLY
INSIDE SPAN
SUPER-COR BASE CHANNEL
CONCRETE FOOTING
INSIDE OF
WORK POINT IS TAKEN AT THE BASE OF STEEL
ALIGNMENT. FILL WITH BOLTS
15" C-C
SPACED @ 15" C-C
BOLT c/w DBL. NUTS
1 1/2" PROJECTION
7'
HEADWALL / WINGWALL ELEVATION - CROSSING ONE
V A
R I E
S 20'
7'
NOT TO SCALE
FORMLINER DETAIL
NOT TO SCALE
SECTION A-A'
STREAM STATION CENTERLINE 0+56.6 SECTION VIEW
NOT TO SCALE
2.0'
18'
36'
MATCH EXISTING
2.0'
SECTION A-A'
ROAD STATION CENTERLINE 0+92.8 SECTION VIEW
NOT TO SCALE
18.00'
18'
FORMLINER FINISH (TYPICAL) ON ALL EXPOSED FACES
AND A MINIMUM OF 1 FOOT FROM TOP OF HEADER AND
WING WALLS ON THE ROAD CENTERLINE SIDE. STYLE TO
BE DETERMINED BY THE CONTRACTING OFFICER
STREAMBED ROCK CLASS 24
THICKNESS 1.5' NOM.
BLEND BOTTOM WITH
EXISTING MATERIAL
BED
2 FT SHOULDER
TOP OF HEADWALL
FORMLINER FINISH +TYPICAL)
ON ALL EXPOSED FACES
FINISHED SUBGRADE
STREAMBED
INVERT TO BE
CONSTRUCTED
6" BELOW
EXISTING
GRADE.
EACH SIDE
UPSTREAM EDGE OF SUBGRADE
AT CULVERT CENTERLINE
EXISTING SURFACE ELEV: unknown
FINISHED SUBGRADE ELEV: 3775.3'
EXISTING & IMPORTED
STREAMBED MATERIAL
EXISTING
FINISHED
5" X 16" X VARIOUS LENGTH
CAP STONE LEAVE TOP
SURFACE "ROUGH" FOR
APPLICATION OF CAP ROCKS
GENERAL NOTE:
CAP ROCKS ARE TO BE NORTH
CAROLINA FIELD STONE, 5" X 16"
BY VARIOUS LENGTHS.
PAYMENT FOR CAP STONE IS
INCIDENTAL TO CONCRETE
PLACEMENT.
FOOTING (VARIES 24"-36")
STREAM
ROADWAY
SLOPE TIES TO
GENERAL NOTES:
1. ALL CONCRETE SHALL HAVE A MINIMUM DESIGN
STRENGTH OF 4000 PSI AND CONFORM TO FP-03
STRUCTURAL CONCRETE.
2. REINFORCEMENT SHALL CONFORM TO 554,
REINFORCING STEEL
3. ELEVATIONS RELATE TO BENCH MARKS
SHOWN ON PLAN.
4. IT IS ASSUMED THAT BEDROCK WILL BE PRESENT.
5. EXCAVATE BEDROCK TO PLACE FOOTINGS,
BOTTOM ELEVATION OF FOOTINGS MAY VARY
WHEN BEDROCK IS PRESENT.
6. WHEN BEDROCK IS ENCOUNTERED, A FOOTING DEPTH
OF 24" DEPTH SHALL BE MAINTAINED ON THE BEDROCK.
WHEN BED ROCK IS NOT ENCOUNTERED, THE FOOTING
SHALL BE 36" MINIMUM DEPTH.
FOOTING & WINGWALL LAYOUT - PLAN VIEW - A.O.P.
36.0' X 18' X 5'-9" ALUMINUM
SCALE: 1" = 5'
STRUCTURAL PLATE
#6 CONT. 12" O.C. EXTEND
INTO CULVERT FOOTER
#4 @ 12" O.C. EXTEND INTO WING WALL FOOTING
#4 @ 12" O.C. EXTEND INTO WING WALL FOOTING
ADJUST STEM WALL TO MEET
CULVERT MANUFACTURER'S
FINAL SUPPLIED LENGTH
42" WING WALL FOOTING
(TYPICAL WIDTH)
36" PLATE
FOOTING
(TYPICAL
WIDTH)
BEDROCK
(IF PRESENT)
4" FORMLINER FACING
(TYPICAL)
36.0'
24"
24"
15.74'
HEADWALL
ADJUST STEM WALL TO MEET
CULVERT MANUFACTURER'S
FINAL SUPPLIED LENGTH
#6 CONT. 12" O.C. EXTEND
INTO CULVERT FOOTER
#5 CONT. 12" O.C. EXTEND INTO
CULVERT FOOTER
#5 @ 12" O.C. EXTEND INTO
WING WALL FOOTING
V A
R I E
S
42"
#5 CONT. @ 12" O.C.
#5 L-BARS @ 12" O.C.
12"
CONCRETE FOOTING / WINGWALL TYPICAL &
CONCRETE HEADWALL OVER TOP OF CULVERT TYPICAL
N.T.S.
V A
R I E
S
#5 U-BARS
OVERLAP L-BARS AT TOP AND
BOTTOM
V A
R I E
S
36"
(8) #5 REBAR
EXPOSED WALL FACE: ANTIETAM
DRYSTACK, RANDOM ROUGH STACKED BY
FITZGERALD FORMLINES - (800) 547-7700
M
I N
3" CLEAR COVER (TYPICAL)
ALUMINUM
STRUCTURAL PLATE
10"
18"
GENERAL NOTE:
CAP ROCKS ARE TO BE NORTH CAROLINA
FIELD STONE, 5" X 16" BY VARIOUS
LENGTHS. PAYMENT FOR CAP STONE IS
INCIDENTAL TO CONCRETE PLACEMENT.
ALUMINUM PLATE
CONCRETE FOOTING SECTION
N.T.S.
STEP & VARY FOOTING AS
NECESSARY TO CONFORM TO
BEDROCK AND FOOTING BASE
24" FOOTING DEPTH MINIMUM ON
BEDROCK TO 36" WITH NO BEDROCK
NOTE: FOOTING SHALL BE 24" MIN. ON
BEDROCK AND 36" IF BEDROCK IS NOT FOUND.
ROCK ANCHORS - USE ONLY WHEN BEDROCK IS PRESENT.
TOTAL VARIES FOR EACH SIDE OF PLATE. #8 THREADED REBAR
- GALVANIZED (ROCK DRILL AND EPOXY INTO BEDROCK).
NOTE: ANCHORS ARE INCIDENTAL TO THE FOOTING
ROCK ANCHORS - USE ONLY WHEN BEDROCK
IS PRESENT. TOTAL VARIES
EACH SIDE OF PLATE (24"O.C.)
CONCRETE FOOTING: 24" MIN. DEPTH IF
BEDROCK IS ENCOUNTERED. 36" MIN. DEPTH
BELOW STREAMBED ELEVATION IF BEDROCK IS
NOT PRESENT.
ROCK ANCHORS - ARE INCIDENTAL
TO THE FOOTING.
NFSR # 4651D MOSES CREEK - EAST FORK
AQUATIC ORGANISM PASSAGE
CLOSED
ROAD
R11-2
48" X 30"
TYPE III BARRICADE
ROAD
CLOSED
1000 FT
W20-3
36" x 36" MIN.
ROAD
CLOSED
500 FT
W20-3
36" x 36" MIN.
CONSTRUCTION SIGN SCHEDULE
SIGN LOCATION
TEXT
R11-2 TYPE III
10 FT FROM BARRICADE
ROAD CLOSED
ROAD CLOSED 4000 FT
ROAD CLOSED 1000 FT
ROAD CLOSED 500 FT
4000 FT FROM BARRICADE
1000 FT FROM BARRICADE
500 FT FROM BARRICADE
SCALE: 1" = 800'
0'
400' 800'
ROAD
CLOSED
4000 FT
W20-3
36" x 36" MIN.
400'