Attachment_03_Revised_Schedule_of_Items_07312017.xlsx

XLSX spreadsheet 20 KB Posted

Attached to
Moses Creek -East Fork AOP Culvert Replacement Federal contract opportunity
Solicitation number
AG-4568-S-17-0028
Issued by
Department of Agriculture Forest Service

About this file

Attachment 03 Revised Schedule of Items

View the file

Other files for this federal contract opportunity

Other files attached to Moses Creek -East Fork AOP Culvert Replacement, newest first.
File Type Posted
Attachment_02_Moses_Creek_AOP_DwgRev2_07312017.pdf PDF
Attachment_02_NFSR_Moses_Creek_SUP_SPECS_Revised_07312017.doc DOC document
Moses_Creek_AOP_Culvert_Replacement_PreBid_Q&A.docx DOCX document
Moses_Creek_AOP_Pre-Bid_Sign-In_Sheet_07182017.pdf PDF
SF-30_Amendment_02.pdf PDF
Amendment_01_Attachment_03_Schedule_of_Items.xlsx XLSX spreadsheet
Amendment_01_Attachment_02.pdf PDF
Amendment_01_SF-30.pdf PDF
SF-1442.pdf PDF
Attachment_04_Experience_Questionnaire.docx DOCX document
Attachment_01.docx DOCX document
Sol__Body_AG-4568-S-17-0028.rtf RTF text file
Attachment_03_Schedule_of_Items.xlsx XLSX spreadsheet
Attachment_02_SOW.pdf PDF
DRAFT_NFSR_Moses_Creek_SUP_SPECS.doc DOC document
03-30-17_Moses_Creek_East_Fork_Binder.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

BID SCHEDULE

(PUBLIC WORKS)

Revised 7/11/2017

ContractNFSR # 4651D Moses Creek AOP Culvert Replacement
ITEM NO.DESCRIPTIONMETHOD OF MEASUREUNITQuantityUnit PriceTOTALS
15101MobilizationLSQLS1$___________$______________
15201Construction survey and staking,

Method 1, Precision class B

Tolerance BLSQLS1$___________$______________
15401Contractor testingLSQLS1$___________$______________
15702Sedimentation, Pollution & Erosion ControlLSQLS1$___________$______________
20102Clearing and grubbing

Tops and limbs, scatter on completed fillslopes Stumps, bury as directed

Deck firewood materialLSQLS1$___________$______________
20801Dewatering Structures (dams), bypass pipe excavation and placement and removalCQCY1$___________$______________
20304Removal of Existing Large CulvertLSQLS1$___________$______________
20401Equipment Rental for Stream Restoration - CAT 312 or equalCQHR12.0$___________$______________
20801Structure excavationLSQLS1$___________$______________
30109Aggregate Surface Course,

Grading NCDOT ABC

Compaction Method A.AQTon200$___________$______________
55201Structural concrete Class A(AE)
Includes rebar - incidentalAQCY68$___________$______________
60305Aluminum Pure Arch, 18' x 5'9" x 36' long single radius arch, opening: 74.8 sq.ft, .175" thick, type 4 ribs @ 18", min/max cover: 2'/19'AQLS1$___________$______________
64805APlaced streambed simulation rock
Bed class 24, Method DAQTon30$___________$______________
64805BFish Rest Stop Rock, FRS 8AQEach50$___________$______________
62527Seeding, fertilizing, and mulching, hydraulic methodLSQLS1$___________$______________
BASE BID TOTAL FOR ROAD:$____________
BID ALTERNATES
ITEM NO.DESCRIPTIONMETHOD OF MEASUREUNITQuantityUnit PriceTOTALS
30109-AAggregate Surface Course,

Grading NCDOT ABC Compaction Method A.

Placed on NFSR # 4651, Moses CreekAQTon200$__________$______________
30109-BAggregate Surface Course,

Grading NCDOT ABC Compaction Method A.

Placed on NFSR # 4652, Old BaldAQTon500$__________$______________
30109-CAggregate Surface Course,

Grading NCDOT ABC Compaction Method A.

Placed on NFSR # 4665, Sugar CreekAQTon750$__________$______________
30109-DAggregate Surface Course,

Grading NCDOT ABC Compaction Method A.

Placed on NFSR # 4666, Piney Mtn. & # 4675, Dryland Laurel BranchAQTon500$__________$______________
30109-EAggregate Surface Course,

Grading NCDOT ABC Compaction Method A.

COR Directed Location within 40 road mile delivery of NFSR # 4651AQTon750$__________$______________
BASE BID + ALTERNATES TOTAL FOR ROAD:DISTRICT ROADS$_________

REVISED 7/31/2017 AG-4568-S-17-0028

NFNC Nantahala RD Moses Creek AOP Culvert

File details come from the government source that posted it. Updated .