Properly extract and Store Increment Cores for the Bent Creek Experimental Forest
Solicitation number
AG-4568-S-09-0097
Issued by

About this file

Amendment 004

Text of this file

AMENDMENT OF SOLICITATION/MODIFICATION OF

CONTRACT

1. CONTRACT ID CODE

J

2. Amendment/Modification No.

3. Effective Date

09/03/2009

4. Requisition/Purchase Req. No.

5. Project No.

6. Issued By:

SOUTHERN RESEARCH STN- HQ, ASHEVILLE

200 WEAVER BLVD

ASHEVILLE NC 28804

7. Administered By:

SAME

8. Name and Address of Contractor xx 9A Amendment of Solicitation No.

AG-4568-S-09-0097

xx 9B. Dated (See Item 11) 08/19/2009

10A. Modification of Contract No.

10B. Date Issued (See Item 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

[x} The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [ ] is extended, [ x ] is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning 1 copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting and Appropriate Data (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS, IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. This Change Order is issued pursuant to: (specify authority) The changes set forth in Item 14 are made in the Contract Order No. in Item 10A.

B. The above numbered contract/order is modified to reflect the administrative changes set forth in Item 14, pursuant to the authority of FAR 43.103(b).

C. This supplemental agreement is entered into pursuant to authority of:

D. Other (specify type of modification and authority):

E. IMPORTANT: Contractor [ ] is not, [X ] is, required to sign this document and return 1 copy to the issuing office.

Description of Amendment/Modification: (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

This Amendment is issued to incorporate questions and answers regarding specifications

(Continued on Page 2) Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. Name and Title of Signer

16A. Name and Title of Contracting Officer

KAREN WELCH

CONTRACTING OFFICER

15B. Contractor/Offeror

(Authorized Signature) Date Signed 16B. United States of America

(Signature of Contracting Officer) Date Signed

09/03/2009 NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (rev. 10-83)

AG-4568-S-09-0097, AMENDMENT 004

BENT CREEK

EXTRACTING TREE CORE SAMPLES

Q1:Is there an estimated or expected award notification date by which contractors may determine the 120 day delivery period? If not, is there a general time frame for award notification for example, "no later than..."?
A1:After award the COR and the contractor will have a pre-work meeting to discuss the project, at that time the Notice to proceed will be issued. The 120 days starts on the date the Notice to proceed is given out.
Q2:What is the range of distance from roads / parking to plots and/or is there an index of these distances from parking locations? Do any plots require off trail or bush-whacking more than 1/2 to 1 mile?
A2:In general, plots are located within an easy walking distance of a road (1/2 mile or so). There are some isolated plots in which a 2 mile hike in is required.
Q3:Is there a lat-long file that can be reviewed to further pinpoint exact plot locations in order to estimate plots per day within general city / quad geographic groups?
A3:We can not provide details regarding the specific location of these plots to a contractor until the contract is awarded.
Q4:Will trees be re-measured during field work with DBH tape (radius or circumference) or simply cored without further measure? Are any other parameters measured as well?
A4:No remeasurements will be required. The trees will just be cored.
Q5.How many USFS / contractor meetings are required or suggested - i.e. - introductory / in-process or updates / training verification and coordination / conclusion - follow up, etc.
A5:As many as needed but generally a prework and a final inspection meeting.

Q6: Are interim or reports based on fieldwork expected and if so, how many?

A6: No official reports will be required. A weekly update via email or phone relaying progress will be expected.

Q7:Does USFS provide the larger field storage tube in which cores will be safely stored during / between plots (this is not listed under tools).
A7:The Contractor will provide any tools or equipment not listed in Amendment 2.
Q8:What is the brand and quality of increment borers? Are they new, used, and/or still under warranty? Will the contractor be held responsible for bore-tips which break off or lodge into trees which cannot be removed (which can happen with cheap bits). Will USFS replace broken bits that are not contractors fault? How many bits are supplied (ie - are additional bits supplied in the event bits break or are useless?)
A7:The FS will provide 4 Hagolf increment borers. In addition, the FS will provide a bore sharpening kit. These increment borers are high-quality and therefore should not have the issues that a cheaper bit can have (e.g., breaking off in the tree). Damage to increment borers that are not the contractors fault will be replaced. However, lost borers, borers broke or unusable due to improper storage, usage, etc. must be replaced by the contractor. Contractor will be responsible for sharpening dull bits.

AG-4568-S-09-0097, AMENDMENT 004

BENT CREEK

EXTRACTING TREE CORE SAMPLES

Q9:Are cores to be sanded and counted or simply provided to USFS while taped?
A9:No, the cores do not have to be sanded or counted.
Q10.Is there any data entry or record keeping required which will be notable in terms of estimating time?
A10:No.
Q11.How clearly are plots and trees marked and what are they marked with? Is the marking consistent?
A11:The plots are clearly marked. They are 1/4 acre in size and green paint is on each tree in the plot at

dbh. Individual trees are marked with a brass tag at the base of the tree.

Q12.Are photos required for plots and if so, what is the methodology?
A12:No, photos are not required.

Q13. What is the backup tree coring protocol for fallen trees or plots which have been destroyed by natural disturbance?

A14: A list of between 8 and 10 trees will be provided. The first 5 listed will be the preferred trees to core. However, if one of the first 5 trees is dead or if the contractor is unable to hit the pith of a tree, another tree from the provided list should be selected.

AS A RESULT OF THE QUOTATION DEADLINE BEING SEPTEMBER 10 THIS WILL BE THE LAST AMENDMENT. NO MORE QUESTIONS CAN BE ANSWERED ON THIS SOLICITATION.

Other files

File Type Posted
Amd003.rtf RTF text file
ATT1 NC FSWD.doc DOC document
Amd002.rtf RTF text file
ATT1 VA FSWD.doc DOC document
Amd001.rtf RTF text file
AMD001_Plot location descriptions.pdf PDF
SF1449.pdf PDF
ATT2 SPECIFICATIONS.doc DOC document
ATT3 EXPERIENCE QUESTIONNAIRE.doc DOC document
RFQ pgs 3-13.doc DOC document
WD FS 2009.doc DOC document
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .