The document provided is a Scope of Work (SOW) for the replacement of a failed Carrier Chiller at Building 902. The SOW specifies the technical requirements for the replacement chiller, including the model, power, refrigerant type, fan type, and various other features. The vendor is required to deliver the equipment, provide startup and warranty services, and complete any necessary training to execute the SOW.
The related federal contract opportunity is a Request for Quote (RFQ) for the Bld. 902 Chiller Replacement, issued by the Department of Energy Office of Science. The RFQ requires the offeror to furnish and deliver the Carrier Model 30RC Chiller per the SOW, with a completion date of May 30, 2025. All questions regarding the solicitation must be submitted by July 29th, 2024.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P.O. Box 5000
Upton, NY 11973-5000 managed by Brookhaven Science Associates for the U.S. Department of Energy
Subject: Scope of work for B902 Chiller Replacement
1. Vendor to provide a like-in-kind replacement for the existing failed Carrier Chiller at B902.
With the following specifications
a. Carrier Model 30RC:
b. 460-3-60
c. 162 Tons
d. R-32 Refrigerant compatible
e. VARIABLE SPEED FAN (6-POLE)
f. DX, SSV OPTION
g. DX, SUCTION LINE INSULATION
h. BACnet IP
i. STD COMPR. HOT GAS BYPASS - DX
j. STD FAN (FB6)
k. LOW SOUND (BLANKET)
l. COIL HEADER COVERS + CFSP
m. STD SCCR (10kA)
n. COPPER/ALUMINUM COIL
o. DUAL 15 HP NO VFD DX EVAP
p. PIC6 + EMM + REMOTE CONNECTIVITY WITH ETHERNET SWITCH
q. RAPID RESTART
r. DX, EVAPORATOR HEATER
s. SINGLE POINT WITH DISCONNECT
2. Vendor will deliver the equipment to B902, to be installed by BNL craft
3. Vendor to provide startup and 1 year labor warranty
4. Vendor to provide a complete asset parts and labor warranty for years 2-5, beyond the
5. standard 1 year warranty
6. The vendor will provide their own tools, equipment, and any necessary supplies to complete the require future service visits.
7. The vendor will provide their own PPE based off their equipment, repair, and supply’s operator’s manual.
8. The vendor will complete all BNL training required to execute this SOW. Vendor should look to have a dedicated personnel team to limit the quantity of technicians that will need to be trained to perform work at BNL.