Chiwapa 3 Specs-Amend CS9.pdf

PDF 10 KB Posted

Attached to
Chiwapa Creek Watershed
Solicitation number
AG-4423-S-08-0017
Issued by

About this file

Amendment No. 1 - Attachment (spec.)

View the file

Other files

File Type Posted
Abstract-08-0017.pdf PDF
IFB0017-08(Amend1).pdf PDF
Chiwapa 3 Plans-Amend.pdf PDF
Chiwapa 3 Specs.pdf PDF
davisbaconMS10-heavy.pdf PDF
3-3-Chiwapa 3 Plans.pdf PDF
IFB0017-08DamRehab.pdf PDF
1-3-Chiwapa 3 Plans.pdf PDF
2-3-Chiwapa 3 Plans.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CS 9. TRAFFIC CONTROL, Cont'd

Watershed: Chiwapa Creek

Project: Dam No. 3

NRCS-MS-SDS (9-3) 5/27/2008

7. ITEMS OF WORK AND CONSTRUCTION DETAILS

Items of work to be performed in conformance with this specification and the construction details are:

a. Bid Item, Traffic Control

(1) This item shall consist of establishment and maintenance of a traffic control system.

(2) The contractor shall contact local law enforcement officials and officials to advise them of the Traffic Control plan. The contractor shall furnish proof of this contact to the Engineer.

File details come from the government source that posted it. Updated .