Abstract-08-0017.pdf
PDF 328 KB Posted
- Attached to
- Chiwapa Creek Watershed
- Solicitation number
- AG-4423-S-08-0017
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Chiwapa 3 Specs-Amend CS9.pdf | ||
| IFB0017-08(Amend1).pdf | ||
| Chiwapa 3 Plans-Amend.pdf | ||
| Chiwapa 3 Specs.pdf | ||
| davisbaconMS10-heavy.pdf | ||
| 3-3-Chiwapa 3 Plans.pdf | ||
| IFB0017-08DamRehab.pdf | ||
| 1-3-Chiwapa 3 Plans.pdf | ||
| 2-3-Chiwapa 3 Plans.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ABSTRACT OF OFFERS - CONSTRUCTION 1. SOLICITATION NUMBER
AG-4423-S-08-0017
2. DATE ISSUED
8-11-08
3. DATE OPENED
9-10-08
PAGE
4. ISSUING OFFICE NAME AND TITLE OF CERTIFYING OFFICER (Type)
USDA-Natural Resources Conservation Service Suite 1321, Federal Building
I CERTIFY that I have opened, read, and recorded on this abstract all offers
Faith E. Tillman Contract Specialist
100 West Capitol Street Jackson, MS 39269-1399 received in response to this solicitation. SIGNATURE DATE SIGNED
5. PROJECT TITLE 8. GOVERNMENT ESTIMATE
(Check A. B. or C and complete D, E, and F)
9. OFFERS
NO. 1 NO. 2
CHIWAPA CREEK WATERSHED
REHABILITATION OF DAM NO. 3
A. HIRED LABOR A. OFFEROR
Camo Construction Company, Inc.
A. OFFEROR
Turner Environmental, Inc.
PONTOTOC COUNTY B REASONABLE CONTRACT
(Without Profit)
B. BID SECURITY (Type & Amount) Bid Bond – 20%
B. BID SECURITY (Type & Amount) Bid Bond – 20%
6. NUMBER OF AMENDMENTS ISSUED C. REASONABLE CONTRACT
(Including Profit)
C. AMENDMENTS ACKNOWLEDGED
Yes
C. AMENDMENTS ACKNOWLEDGED
Yes
7A.
ITEM
NO.
7B. DESCRIPTION OF OFFERED ITEM
7C. EST.
QUANTITY
D.
UNIT
E. UNIT
PRICE
F. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
1.
Clearing, Class B, Sediment (Permanent) Pool and Site Area
L.S.
XXXXXXX
0.00
24,000.00
2.
Clearing and Grubbing
26,600.00
30,000.00
3.
Protective Cover
AC.
1,380.00
27,600.00
500.00
8,000.00
4.
Mobilization and Demobilization
16,000.00
110,000.00
5.
Traffic Control
2,200.00
10,000.00
6.
Removal of Water
19,200.00
7.
Excavation, Common
27,056
C.Y.
3.10
83,873.60
4.00
108,224.00
8.
Earthfill, Class A
27,986
6.50
181,909.00
111,944.00
9.
Drainfill
9,036
33.75
304,965.00
30.00
271,080.00
10.
Reinforced Concrete, Class 4000
967.00
59,954.00
900.00
55,800.00
11.
Concrete, Class 4000, Pipe Conduit Bedding
7.5
605.00
4,537.50
3,750.00
12.
Steel Reinforcement
9,671
LB.
2.50
24,177.50
2.50
24,177.50
13.
Reinforced Concrete Pressure Pipe, 30” Dia.
L.F.
460.00
46,000.00
350.00
35,000.00
14.
6” Diameter PVC Pipe, Perforated
12.00
10,176.00
40.00
33,920.00
15.
6” Diameter PVC Pipe, Nonperforated
1,848.00
6,160.00
16.
4” Diameter PVC Pipe
800.00
3,040.00
17.
Rock Riprap
TON
45.50
12,057.50
80.00
21,200.00
18.
Filter Material for Rock Riprap
107.00
3,745.00
10.00
350.00
OPTIONAL FORM 1419 (11-88)
2. DATE ISSUED
8-11-08
3. DATE OPENED
9-10-08
PAGE
4. ISSUING OFFICE NAME AND TITLE OF CERTIFYING OFFICER (Type)
USDA-Natural Resources Conservation Service Suite 1321, Federal Building
I CERTIFY that I have opened, read, and recorded on this abstract all offers
100 West Capitol Street Jackson, MS 39269-1399 received in response to this solicitation. SIGNATURE DATE SIGNED
5. PROJECT TITLE 8. GOVERNMENT ESTIMATE
(Check A. B. or C and complete D, E, and F)
9. OFFERS
NO. 1 NO. 2
CHIWAPA CREEK WATERSHED
REHAB OF DAM NO. 3
A. HIRED LABOR A. OFFEROR
Camo Construction Co., Inc.
A. OFFEROR
Turner Environmental, Inc.
PONTOTOC COUNTY B REASONABLE CONTRACT
(Without Profit)
B. BID SECURITY (Type & Amount)
6. NUMBER OF AMENDMENTS ISSUED
C. REASONABLE CONTRACT
(Including Profit)
C. AMENDMENTS ACKNOWLEDGED
7A.
ITEM
NO.
7B. DESCRIPTION OF OFFERED ITEM
7C. EST.
QUANTITY
D.
UNIT
E. UNIT
PRICE
F. ESTIMATED
AMOUNT
19.
Water Control Slide Gate, 30”x30” Downward Opening
23,000.00
18,000.00
20.
Water Control Slide Gate, 30”x30” Upward Opening
23,000.00
15,000.00
21.
Trash Rack, Principal Spillway
15,850.00
12,000.00
22.
Impact Basin Cover
7,255.00
2,500.00
23.
Cast Iron Manhole Cover and Rim
2,782.00
24.
Quality Control
28,640.00
50,000.00
25.
Geotextile
S.Y.
3.00
930.00
3.50
1,085.00
TOTAL BID PRICE 927,100.10 967,730.50
OPTIONAL FORM 1419 (11-88)
PAGE
CONTINUATION SHEET INSRUCTIONS: Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 18 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419’s for contract items in excess of 18 and attach additional Continuation Sheets (OF 1419A) as needed.
2. PROJECT TITLE
4. OFFERS (Continued)
NO. 3 NO. 4 NO. 5 NO. 6
CHIWAPA CREEK WATERSHED
REHAB OF DAM NO. 3
A. OFFEROR
Prairie Construction, LLC
A. OFFEROR
Phillips Contracting Co., Inc.
A. OFFEROR
TLSL, Inc.
A. OFFEROR
Quinn Contracting, Inc.
PONTOTOC COUNTY B. BID SECURITY (Type & Amount) Bid Bond – 20%
B. BID SECURITY (Type & Amount) Bid Bond – 20%
B. BID SECURITY (Type & Amount) Bid Bond – 20%
Bid Bond – 20%
3. CONTRACT ITEMS
Yes
C. AMENDMENTS ACKNOWLEDGED
Yes
C. AMENDMENTS ACKNOWLEDGED
Yes
C. AMENDMENTS ACKNOWLEDGED
Yes
A.
ITEM
NO.
B.
ESTIMATED
QUANTITY
C.
UNIT
E.
ESTIMATED
AMOUNT
XXXXXXXX
5,000.00
52,000.00
25,000.00
40,000.00
75,000.00
38,500.00
1,750.00
28,000.00
2,000.00
32,000.00
1,650.00
26,400.00
20,000.00
7,500.00
8,000.00
4,500.00
2.75
74,404.00
6.00
162,336.00
2.00
54,112.00
2.25
60,876.00
6.50
181,909.00
7.00
195,902.00
4.75
132,933.50
335,832.00
361,440.00
30.00
271,080.00
60.00
542,160.00
70.00
632,520.00
750.00
46,500.00
1,500.00
93,000.00
770.00
47,740.00
1,475.00
91,450.00
3,750.00
550.00
4,125.00
1,250.00
9,375.00
1.00
9,671.00
1.25
12,088.75
2.09
20,212.39
1.30
12,572.30
363.40
36,340.00
750.00
75,000.00
15.00
12,720.00
10,176.00
12,720.00
5,088.00
2,310.00
1,848.00
2,310.00
924.00
1,000.00
1,000.00
50.00
13,250.00
10,600.00
15,900.00
33.00
8,745.00
1,400.00
100.00
3,500.00
2,100.00
1,400.00
OPTIONAL FORM 1419A (11-88)
PAGE
CONTINUATION SHEET INSRUCTIONS: Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 18 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419’s for contract items in excess of 18 and attach additional
NO. 3 NO. 4 NO. 5 NO. 6
CHIWAPA CREEK WATERSHED
REHAB OF DAM NO. 3
A. OFFEROR
Prairie Construction, LLC
A. OFFEROR
Phillips Contracting Co., Inc.
A. OFFEROR
TLSL, Inc.
A. OFFEROR
Quinn Contracting, Inc.
PONTOTOC COUNTY B. BID SECURITY (Type & Amount)
B. BID SECURITY (Type & Amount) B. BID SECURITY (Type & Amount)
C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED
A.
ITEM
NO.
B.
ESTIMATED
QUANTITY
C.
UNIT
AMOUNT
19,200.00
19,379.38
45,000.00
19,000.00
19,590.38
45,000.00
18,000.00
13,422.08
6,000.00
19,500.00
6,160.00
2,200.00
2,360.00
60,000.00
6,000.00
1,240.00
930.00
1,240.00
5.00
1,550.00
TOTAL
BID PRICE 974,594.00 1,124,360.75 1,149,304.40 1,463,733.30
PAGE
CONTINUATION SHEET INSRUCTIONS: Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 18 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419’s for contract items in excess of 18 and attach additional
NO. 7 NO. NO. NO.
CHIWAPA CREEK WATERSHED
REHAB OF DAM NO. 3
A. OFFEROR
Colom Construction Company, Inc.
A. OFFEROR
A. OFFEROR
Bid Bond – 20%
Yes
ITEM
NO.
B.
ESTIMATED
QUANTITY
C.
UNIT
AMOUNT
24,000.00
3.50
94,696.00
167,916.00
65.00
587,340.00
93,000.00
11,250.00
29,013.00
2,747.50
274,750.00
24.50
20,776.00
24.00
3,696.00
4,000.00
45.50
12,057.50
67.20
2,352.00
PAGE
CONTINUATION SHEET INSRUCTIONS: Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 18 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419’s for contract items in excess of 18 and attach additional
NO. 7 NO. NO. NO.
CHIWAPA CREEK WATERSHED
REHAB OF DAM NO. 3
A. OFFEROR
Colom Construction Company, Inc.
A. OFFEROR A. OFFEROR
ITEM
NO.
B.
ESTIMATED
QUANTITY
C.
UNIT
AMOUNT
75,750.00
75,750.00
32,000.00
13,000.00
2,800.00
5.00
1,550.00
TOTAL
BID PRICE 1,645,696.50