J3 - Wage Determinations.doc
DOC document 93 KB Posted
- Solicitation number
- AG-4419-S-10-0493
About this file
J3 Davis Bacon Wage Determinations
View the file
Other files
| File | Type | Posted |
|---|---|---|
| type1_gate_detail revision 1.pdf | ||
| type1_double_gate_detail revision 1.pdf | ||
| Amendment 1.rtf | RTF text file | |
| Pre-bid meeting notes.pdf | ||
| J2 - gate_sign_detail drawings.pdf | ||
| J1 Gate Repair Spreadsheet.pdf | ||
| J4 - Location maps 11 x 17.pdf | ||
| sf24 bid bond form.pdf | ||
| AG-4419-S-10-0493.rtf | RTF text file | |
| SF1442 Contractor to complete and return.rtf | RTF text file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Davis Bacon General Decision Number: WV100001 03/19/2010 WV1
Superseded General Decision Number: WV20080001
State: West Virginia
Construction Type: Heavy
Counties: Barbour, Braxton, Calhoun, Doddridge, Gilmer, Grant, Hampshire, Hardy, Harrison, Jackson, Lewis, Marion, Mason, Monongalia, Morgan, Pendleton, Pleasants, Preston, Randolph, Ritchie, Roane, Taylor, Tucker, Tyler, Upshur, Webster, Wetzel and Wirt Counties in West Virginia.
HEAVY CONSTRUCTION PROJECTS
Modification Number Publication Date
0 03/12/2010
1 03/19/2010
CARP0476-003 12/01/2009
BRAXTON, DODDRIGE, GILMER, HARRISON, LEWIS, MARION, UPSHUR, AND
WEBSTER COUNTIES
Rates Fringes
CARPENTER........................$ 25.97 14.54
CARP0604-001 12/01/2009
BARBOUR, MONOGALIA, PRESTON, RANDOLPH, TAYLOR, AND TUCKER
COUNTIES
Rates Fringes
CARPENTER........................$ 25.97 14.54
CARP0899-002 12/01/2009
CALHOUN, PLEASANTS, RITCHIE, TYLER, WETZEL, and WIRT COUNTIES
Rates Fringes
CARPENTER........................$ 25.97 14.54
CARP1024-005 12/01/2006
GRANT, HAMPSHIRE, HARDY, MORGAN, AND PENDLETON COUNTIES
Rates Fringes
CARPENTER........................$ 25.98 10.25
Pile Driver......................$ 26.90 10.25
CARP1159-001 12/01/2009
JACKSON and MASON COUNTIES
Rates Fringes
CARPENTER........................$ 25.97 14.54
CARP1207-005 12/01/2009
ROANE COUNTY
Rates Fringes
CARPENTER........................$ 25.97 14.54
ELEC0026-011 11/07/2005
HARDY AND PENDLETON COUNTIES
Rates Fringes
ELECTRICIAN......................$ 21.71 7.80
ELEC0141-009 09/01/2009
WETZEL COUNTY
Rates Fringes
CABLE SPLICER....................$ 28.61 19.75
ELECTRICIAN......................$ 28.36 19.75
ELEC0307-005 12/01/2009
GRANT, HAMPSHIRE, and MORGAN COUNTIES
Rates Fringes
ELECTRICIAN......................$ 27.90 14.26
ELEC0317-015 06/01/2009
MASON COUNTY
Rates Fringes
CABLE SPLICER....................$ 32.68 18.13
ELECTRICIAN......................$ 31.12 18.08
ELEC0466-005 06/01/2009
BRAXTON, CALHOUN, GILMER, ROANE, and WEBSTER COUNTIES
Rates Fringes
CABLE SPLICER....................$ 35.06 14.10
ELECTRICIAN......................$ 31.87 14.01
ELEC0596-003 06/01/2009
BARBOUR, DODDRIDGE, HARRISON, LEWIS, MARION, MONONGALIA,
PRESTON, RANDOLPH, TAYLOR, TUCKER AND UPSHUR COUNTIES
Rates Fringes
CABLE SPLICER....................$ 32.99 18.04
ELECTRICIAN......................$ 29.99 17.95
ELEC0968-001 06/01/2009
JACKSON, PLEASANTS, RITCHIE, TYLER, AND WIRT COUNTIES
Rates Fringes
ELECTRICIAN......................$ 29.41 17.89
IRON0301-004 12/01/2009
BRAXTON, RANDOLPH (Southern portion), and WEBSTER COUNTIES
Rates Fringes
IRONWORKER, REINFORCING..........$ 31.63 16.47
IRON0549-004 12/01/2009
BARBOUR (Northwest Third of County to include Twp of Philippi), HARRISON, MARION, MONONGALIA, TAYLOR, TYLER AND WETZEL COUNTIES
Rates Fringes
IRONWORKER, REINFORCING..........$ 31.56 14%+16.04
IRON0568-006 12/01/2009
BARBOUR (Excluding northwest third of County including
Towhnship of Philippi), BROOKE, GRANT, HAMPSHIRE, HARDY, MORGAN, PENDLETON, PRESTON, RANDOLPH (Excluding southeast portion of County including the Townships of including the
Townships of Cheat Bridge, Elkwater, Huttonsville, Mingo, Monterville and Valley Head)), AND TUCKER COUNTIES
Rates Fringes
IRONWORKER, REINFORCING..........$ 31.41 12.88
IRON0787-001 12/01/2009
CALHOUN, DODDRIDGE, GILMER, JACKSON, LEWIS, MASON, PLEASANTS,
RITCHIE, ROANE, UPSHUR, and WIRT COUNTIES
Rates Fringes
IRONWORKER, REINFORCING..........$ 30.07 16.65
LABO0379-002 12/01/2009
Rates Fringes
Laborers:
Grade Checke, Poser Tool
Operator, & Mulcher and
Seeder (hand or machine)....$ 23.82 11.75
PLAS0006-002 12/01/2005
HAMPSHIRE AND MORGAN COUNTIES
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 28.24 7.12
PLAS0015-002 12/01/2005
GRANT, HARDY, PENDLETON, AND RANDOLPH COUNTIES
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 28.24 7.12
PLAS0039-007 12/01/2005
WETZEL COUNTY
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 23.83 11.06
PLAS0181-004 12/01/2004
CALHOUN, GILMER, JACKSON, PLEASANTS, RITCHIE, TYLER, AND WIRT
COUNTIES
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 25.29 8.95
PLAS0711-001 12/07/2002
BARBOUR, DODDRIDGE, HARRISON, LEWIS, MARION, MONONGALIA,
PRESTON, TAYLOR, TUCKER, AND UPSHUR COUNTIES
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 28.53 4.41
* PLAS0887-004 12/01/2009
BRAXTON, MASON, ROANE, and WEBSTER COUNTIES
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 28.98 12.20
SUWV2000-001 02/24/2000
Rates Fringes
Laborers:
Flaggers....................$ 15.44 6.56
Pipelayers..................$ 17.83 6.70
Unskilled...................$ 16.40 6.56 Power equipment operators:
Backhoes....................$ 18.55 8.41
Bulldozers..................$ 18.29 8.75
Loaders.....................$ 18.52 8.75
Truck drivers:
Tandem Axle Dump............$ 17.61 6.04
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour
Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
Davis Bacon General Decision Number: WV100010 03/19/2010 WV10
Superseded General Decision Number: WV20080010
State: West Virginia
Construction Type: Heavy
Counties: Boone, Brooke, Cabell, Clay, Fayette, Greenbrier, Hancock, Kanawha, Lincoln, Logan, Marshall, McDowell, Mercer, Mingo, Monroe, Nicholas, Ohio, Pocahontas, Putnam, Raleigh, Summers, Wayne, Wood and Wyoming Counties in West Virginia.
HEAVY CONSTRUCTION PROJECTS
Modification Number Publication Date
0 03/12/2010
1 03/19/2010
BRWV0001-002 07/01/2007
MARSHALL AND OHIO COS.
Rates Fringes
BRICKLAYER
All refactory work..........$ 28.47 11.44
Includes acid brick or acid resistant materials or any brick, block, stone, ceramic tile, or marble masonry in an industrial facility.........$ 26.32 11.44
BRWV0005-003 06/01/2006
CABELL, LINCOLN, MINGO, AND WAYNE COUNTIES
Rates Fringes
Bricklayer, Stonemason...........$ 26.38 12.75
BRWV0006-004 06/01/2009
WOOD COUNTY
Rates Fringes
Bricklayer, Stonemason...........$ 25.74 12.38
BRWV0009-003 12/01/2008
BOONE, CLAY, FAYETTE, GREENBRIER, KANAWHA, LOGAN, MCDOWELL,
MERCER, MONROE, NICHOLAS, PUTNAM, RALEIGH, SUMMERS, AND WYOMING
COUNTIES
Rates Fringes
Bricklayer, Stonemason, Pointer, Caulker & Cleaner.......$ 26.54 14.40
BRWV0011-002 07/01/2007
BROOKE AND HANCOCK COUNTIES
Rates Fringes
BRICKLAYER
All refractory work, acid brick or acid resistant materials or any brick, block, stone, ceramic tile or marble masonry in an industrial facility.........$ 29.26 11.30
* BRWV0015-003 06/01/2009
POCAHONTAS COUNTY
Rates Fringes
Bricklayer, Stonemason...........$ 27.24 13.31
CARP0003-007 12/01/2009
BROOKE, HANCOCK, MARSHALL (North of 39 degrees 46' latitude), and OHIO COUNTIES
Rates Fringes
CARPENTER........................$ 23.96 16.40
CARP0302-002 12/01/2009
CABELL, MINGO, and WAYNE COUNTIES
Rates Fringes
CARPENTER........................$ 25.97 14.54
Pile Driver......................$ 26.52 14.54
CARP0604-004 12/01/2009
POCAHONTAS COUNTY
Rates Fringes
Carpenter & Soft Floor Layer
Including Drywall Hanging...$ 23.56 15.19
CARP0899-005 12/01/2009
WOOD and MARSHALL (South of 39 degrees 46' latitude) COUNTIES
Rates Fringes
CARPENTER........................$ 25.97 14.54
CARP1207-001 12/01/2009
BOONE, CLAY, KANAWHA, LINCOLN, LOGAN, NICHOLAS, and PUTNAM
COUNTIES
Rates Fringes
CARPENTER........................$ 25.97 14.54
Pile Driver......................$ 26.52 14.54
CARP1911-002 12/01/2009
FAYETTE, GREENBRIER, McDOWELL, MERCER, MONROE, RALEIGH, SUMMERS, and WYOMING COUNTIES
Rates Fringes
CARPENTER........................$ 25.97 14.54
Pile Driver......................$ 26.52 14.54
CARP2235-011 12/01/2009
BROOKE, HANCOCK, MARSHALL, and OHIO COUNTIES
Rates Fringes
Pile Driver......................$ 29.95 12.17
ELEC0071-016 12/29/2008
BROOKE (EXCEPT BUFFALO TOWNSHIP) and HANCOCK COUNTIES
Rates Fringes
Line Construction:
Equipment operator..........$ 27.45 10.51
Groundman...................$ 19.83 8.92
Lineman & Cables Splicers...$ 30.50 11.15
ELEC0141-004 09/01/2009
BROOKE (Buffalo Twp. only); MARSHALL, and OHIO COUNTIES
Rates Fringes
CABLE SPLICER....................$ 28.61 19.75
ELECTRICIAN......................$ 28.36 19.75
ELEC0141-006 09/01/2009
BROOKE (Buffalo Twp. only), MARSHALL, and OHIO COUNTIES
Rates Fringes
Line Construction:
Cable Splicer...............$ 27.21 19.17
Groundman...................$ 21.57 18.96
Lineman & Equipment
Operator....................$ 26.96 19.16
ELEC0246-007 11/01/2009
BROOKE (Except Buffalo Township) and HANCOCK COUNTIES
Rates Fringes
ELECTRICIAN......................$ 33.00 22.77+a
FOOTNOTE: a. 1 1/2 Paid Holidays: The last scheduled workday prior to Christmas & 4 hours on Good Friday.
* ELEC0317-010 09/06/2009
BOONE, CABELL, CLAY, FAYETTE, KANAWHA, LINCOLN, LOGAN, MINGO,
NICHOLAS, PUTNAM, RALEIGH, SUMMERS, WAYNE , and WYOMING COUNTIES
Rates Fringes
Line Construction:
Cable Splicer...............$ 31.20 12.38
Equipment Mechanic..........$ 22.13 12.38
Equipment Operator A: John
Henry Rock Drill, D6 (or equivalent) and above, Trackhoe Digger, & Cranes
(greater than 25 tons and less than 45 tons)..........$ 26.39 12.38
Equipment Operator B:
Cranes (6-25 tons), Backhoes, Road Tractor, Dozer up to D5, Pressure
Digger-Wheeled or Tracked, & all Tension Wire
Stringing Equipment.........$ 23.09 12.38
Equipment Operator C:
Trencher, Vibratory
Compactor, Ground Rod
Driver, Boom Truck (6 ton or below), & Skid Steer
Loaders.....................$ 18.17 12.38
Groundman/Truck Driver......$ 14.09 12.38
Line Truck w/Auger..........$ 20.30 12.38
Lineman & Technician........$ 29.68 12.38
All operators of 45 ton cranes or larger shall be paid the journeyman lineman's rate of pay.
ELEC0317-011 06/01/2009
CABELL, LINCOLN, LOGAN, MINGO AND WAYNE COUNTIES
Rates Fringes
Electricians:
Cable Splicers..............$ 32.68 18.13
Electricians................$ 31.12 18.08
ELEC0466-002 06/01/2009
BOONE, CLAY, FAYETTE, KANAWHA, NICHOLAS, PUTNAM, RALEIGH,
SUMMERS, and WYOMING COUNTIES
Rates Fringes
CABLE SPLICER....................$ 35.06 14.10
ELECTRICIAN......................$ 31.87 14.01
ELEC0637-003 06/01/1998
GREENBRIER, MCDOWELL, MERCER, MONROE AND POCAHONTAS COUNTIES
Rates Fringes
Line Construction:
Cable Splicer...............$ 20.31 3.80+3.5%
Equipment Operator..........$ 11.04 3.80+3.5%
Groundman & Truck with winch.......................$ 10.82 3.80+3.5%
Lineman.....................$ 19.34 3.80+3.5%
ELEC0637-004 06/01/2003
GREENBRIER, MCDOWELL, MERCER, MONROE AND POCAHONTAS COUNTIES
Rates Fringes
ELECTRICIAN......................$ 18.31 5.80+1.5%
ELEC0968-004 06/01/2009
WOOD COUNTY
Rates Fringes
ELECTRICIAN......................$ 29.41 17.89
ELEC0968-005 06/01/2009
WOOD COUNTY
Rates Fringes
Line Construction:
Cable Splicer, Equipment
Operator, Groundman, and
Lineman.....................$ 29.41 17.54
ENGI0132-002 12/01/2009
Rates Fringes
Power equipment operators:
GROUP 1.....................$ 29.00 15.80
GROUP 2.....................$ 26.24 15.80
GROUP 3.....................$ 25.13 15.80
GROUP 4.....................$ 21.67 15.80
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Class I shall include those operating the following equipment: cranes, tower cranes, derricks, derrick boats, dredge, draglines, clamshells, cableways, boom trucks, loaders of six (6) cubic yard capacity and over, excavators and shovels with an operating weight of one hundred ten thousand (110,000) pounds and over.
GROUP 2: Class II shall include those operating the following equipment: loaders up to six (6) cubic yard capacity, gradall, hoist (two drums or more), mixer plant
(two or more mixers includiing batch control), pile driver, trencher, backhoe, asphalt paver, cement paver, rotary drill, bulldozers, standard gauge locomotive, concrete pump, controlled fine grade machine, slip form paver, log loader, log skidder, motor grader, rubber tired scraper, tractor pan, Roto Miller, tow or work boat, mobile conveyor, transloader, articulating equipment, material hauler, carry deck, compactor with blade, skidsteer including attachments, fork lift, self-propelled concrete spreader, concrete finishing machine, derrick (single drum), hoist (single drum), single drum paver, air tugger, Ross Carrier, multiple concrete saw, hydraulic post driver, horizontal road-boring machine, tie distributor, track lining machine, ballast tamper, anchor application machine, ribbon rail puller, ballast regulator, auto sled, turn table, pavement breaker, asphalt batch plant, concrete batch plant, crushing plant, compactor with blade, power broom, vac-all truck, self-propelled concrete spreader and concrete finishing machine, mechanics with tools greasers.
Class II shall also include excavators, and shovels with an operating weight of up to one hundred ten thousand
(110,000) pounds.
GROUP 3: Class III shall include those operating the following equipment: Asphalt roller.
GROUP 4: Class IV shall include those operating the following type of equipment: air compressor, concrete mixer (under one (1) cubic yard), light plant, narrow gauge locomotive, fireman, mechanic's tender, assistant engineer, deckhand, screed man, spreader box man, joint sealer and pump, steam jenny, stationary conveyor (belt or bucket), gasoline or diesel powered welder, brakeman of locomotive, conductor of locomotive, A-frame tire man, screening and washing plant, form subgrader, power form handling equipment, burlap and curing machine, form grader, bull float, bar and joint installing machine, roller and compactor, hydroblaster, concrete mixer (single drum, one (1) cu. yd. or over), portable concrete saw and highway striping operator.
Utility operators shall be paid Class II rate when operating more than one (1) but less than five (5) air compressors, pumps, stationary conveyors (belt or bucket), light plants, and gasoline or diesel powered welder, brakeman of locomotive conductor or locomotive, A-frame tire man, screening and washing plant, form subgrader, power form handling equipment, burlap and curing machine, form grader, bull float, bar and joint installing machine, roller and compactor, hydroblaster, concrete mixer (single drum, one (cu. yd. or over), portable concrete saw and highway stripping operator. Utility operators shall be paid Class II rate when operating more than one (1) but less than five (5) air compressors, pumps, stationary conveyors (belt or bucket), light pants, and gasoline or diesel powered welders.
A. Classes shall be paid the following rates for the years
2004 through and including 2006 as long as those rates are the prevailing rates for the respective years:
B. Operators operating excavators and endloaders of one and one-half (1 1/2) cu. yd. capacity to, and including, three
(3) cu. yd. capacity shall receive an additional $1.05 per hour worked above the Class II Rate. Operators operating excavators and endloaders from three (3) cu. yd. capacity to six (6) cu. yd. capacity shall receive an additional
$1.35 per hour worked above this Class II Rate. Operators required to have an Electricians License will receive an additional $1.00 per hour.
C. Capacities for equipment shall be as per manufacturers maximum rated capacity.
D. $0.25 per hour shall be added to all of the above schedules for tunneling and for all other underground work.
Footnote: (Hazardous/toxic waste material handling - wages for employees working in direct contact with a hazardous/toxic waste material which is classified level A or level B by the U.S. Environmental Protection Agency and who are required to wear personal protective equipment for respiratory, skin or eye protection for that level of work, shall be $.50 above the appropriate classification rate).
IRON0301-002 12/01/2009
BOONE, CLAY, FAYETTE, KANAWHA, LINCOLN, LOGAN, MCDOWELL, MINGO,
NICHOLAS, PUTNAM, RALEIGH, and WYOMING COUNTIES
Rates Fringes
IRONWORKER.......................$ 31.63 16.47
IRON0549-005 12/01/2009
BROOKE, HANCOCK, MARSHALL, AND OHIO COUNTIES
Rates Fringes
IRONWORKER.......................$ 31.56 14%+16.04
IRON0697-004 12/01/2009
GREENBRIER, MERCER, MONROE, POCAHONTAS, and SUMMERS COUNTIES
Rates Fringes
IRONWORKER.......................$ 31.55 11.43
IRON0769-006 12/01/2008
CABELL AND WAYNE COUNTIES
Rates Fringes
IRONWORKER
ZONE 1......................$ 32.30 17.07
ZONE 2......................$ 32.70 17.07
ZONE 3......................$ 34.30 17.07
ZONE 1 - Up to 10 mile radius of Union Hall, Ashland, Ky., 1643 Greenup Ave.
ZONE 2 - 10 to 50 mile radius of Union Hall, Ashland, Ky., 1643 Greenup Ave.
ZONE 3 - 50 mile radius & over of Union Hall, Ashland, Ky., 1643 Greenup Ave.
IRON0787-005 12/01/2009
WOOD COUNTY
Rates Fringes
IRONWORKER.......................$ 30.07 16.65
LABO0379-004 12/01/2009
BOONE, BROOKE, CABELL, CLAY, FAYETTE, GREENBRIER,HANCOCK,
KANAWHA, LINCOLN, LOGAN, MCDOWELL, MARSHALL, MERCER, MINGO,
MONROE, NICHOLAS, OHIO, POCAHONTAS, PUTNAM, RALEIGH, SUMMERS,
WAYNE, WOOD, and WYOMING COUNTIES
Rates Fringes
Laborers:
GROUP 1.....................$ 24.85 11.75
GROUP 2.....................$ 23.82 11.75
GROUP 3.....................$ 22.76 11.75
LABORER CLASSIFICATIONS
GROUP 1: Blacksmith, Tunnel Driller, Tunnel Miner, Powderman, Mucker-Chucker, Reinforcing Bar Handler
(Structures), Toxic and Hazardous Waste Removal Laborer, Asbestos Abatement Laborer and Lead Base Paint Removal
Laborer, Inside Laborer, Laser Screed Operator, and GPS
Operator.
GROUP 2: Pipelayer (Including Laser Beam Set Up), Form
Setter (Road), Drill op., Air Tool op., Grade Checker and
Asphalt Raker, Vibrator Man, Whacker, Chainsaw op., Mortarman, Brick Mason Tender, Blacksmith Tender, Cement
Finisher Tender, Drill Tender, Powderman Tender, Water
Proofer, Sheeter & Shorer, Placement of Lagging, Bull-Float
Man, Pavement Reinforcing Placer, Handyman, Signal Man, Greencutter, Georgia Power Buggie, Burner, Cement Blower
Man,Tree Trimmer, Deckhand, Bituminous Hand Sprayer, Bork
250 Remote Control Ditch Witch and Walk Behind Concrete
Saw, Deckhand, Casion Bottom Man, Mulcher and Seeder (hand and machine), Installation of Ground Mounted Beams and
Signs including Concrete Footers, Installation of Overhead sign Supports and Signs including concrete Footers, Installation of Guardrail and Anchors Assemblies, Tree
Trimmer, Bush Hammering Laborer, Core Drilling Laborer, and
Placement and Mixing of Grout Laborer.
GROUP 3: General Laborer, Flag Person, Traffic Control
Maintenance Person, Watchman, Carpenter's Tender, Pipelayer
Tender, and Herbicide Sprayer.
PAIN0091-002 12/01/2008
BROOKE (SOUTH OF BUFFALO CREEK), MARSHALL,AND OHIO COUNTIES
Rates Fringes
Painters: (Smokestacks, Railroad and Highway Bridges, and Locks and Dams)..............$ 27.70 10.00
Painters: (Substations, Power
Line Towers).....................$ 27.70 10.00
PAIN0438-004 12/01/2008
BROOKE (NORTH OF BUFFALO CREEK) AND HANCOCK COUNTIES
Rates Fringes
Painters: ( Bridges, Locks and Dams, High Tension Towers and Substations).................$ 27.70 10.00
Painters: (Tanks, Smokestacks, Raildroad &
Highway).........................$ 27.70 10.00
PAIN0813-002 12/01/2008
CABELL, LINCOLN, LOGAN, MINGO AND WAYNE COUNTIES
Rates Fringes
Painters:
Brush, Roller, Spray, and
Sandblast...................$ 24.83 10.00
PAIN0970-002 12/01/2008
BOONE, CLAY, FAYETTE, GREENBRIER, KANAWHA, MCDOWELL, MERCER,
MONROE, NICHOLAS, POCAHONTAS, PUTNAM, RALEIGH, SUMMERS AND
WYOMING COUNTIES
Rates Fringes
Painters:
Bridges, Locks, and Dams....$ 27.83 10.00
Industrial: Stacks, Vent
Pipes, Flagpoles in excess
30 Ft, Towers, Elevated
Tanks, Electrical Switch
Yards, Transformer Banks,...$ 24.83 10.00
PAIN1144-004 12/01/2008
WOOD COUNTY
Rates Fringes
PAINTER..........................$ 24.87 10.00
PLAS0002-002 12/01/2005
MCDOWELL, MERCER AND WYOMING COUNTIES
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 24.45 11.50
PLAS0005-004 12/01/2005
MINGO COUNTY
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 25.91 11.50
PLAS0015-001 12/01/2005
POCAHONTAS COUNTY
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 28.24 7.12
PLAS0039-005 12/01/2005
BROOKE, HANCOCK, MARSHALL, AND OHIO COUNTIES
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 23.83 11.06
PLAS0181-003 12/01/2004
WOOD COUNTY
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 25.29 8.95
* PLAS0887-002 12/01/2009
BOONE, CABELL, CLAY, FAYETTE, GREENBRIER, KANAWHA, LINCOLN,
LOGAN, MERCER, MONROE, NICHOLAS, PUTNAM, RALEIGH, SUMMERS, and
WAYNE COUNTIES
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 28.98 12.20
PLUM0083-003 07/01/2009
BROOKE COUNTY (North to Route #27 due east to the State Line, Excluding the City limits of Wellsburg), MARSHALL,AND OHIO
COUNTIES
Rates Fringes
Plumber; Steamfitter.............$ 30.51 16.28
* PLUM0495-005 06/01/2009
BROOKE (City limits of Wellsburg and north of St. Rt. 27 to the
Pennsylvania State Line) and HANCOCK (Districts of Butler, Clay and the part of Grant District south of the dividing line)
COUNTIES
Rates Fringes
Plumbers and Pipefitters.........$ 34.79 15.23
PLUM0521-004 06/01/2009
CABELL, LINCOLN, LOGAN, MCDOWELL, MINGO, WAYNE AND WYOMING
COUNTIES
Rates Fringes
Plumbers and Pipefitters.........$ 29.75 14.97
PLUM0565-003 07/01/2009
WOOD COUNTY
Rates Fringes
Plumbers and Pipefitters.........$ 30.98 17.08
PLUM0625-004 12/01/2009
BOONE, CLAY, FAYETTE, GREENBRIER, KANAWHA, MONROE, NICHOLAS,
POCAHONTAS, PUTNAM, RALEIGH, and SUMMERS COUNTIES
Rates Fringes
Plumbers and Pipefitters.........$ 32.19 15.38
* PLUM0625-006 12/01/2009
MERCER COUNTY
Rates Fringes
Plumbers and Pipefitters.........$ 31.99 15.38
TEAM0092-002 01/01/2009
BROOKE AND HANCOCK COUNTIES
Rates Fringes
Truck drivers:
GROUP 1.....................$ 24.38 11.67
GROUP 2.....................$ 26.13 11.67
GROUP 3.....................$ 26.92 11.67
GROUP 1: Single Axle Trucks used as Dumps, Suppy, Fuel, Water, Van , Flatbody, Monorail, Distributor (other than
Bituminous Distributors) including Towed Single Units, Team
4-Up, Team 2-Up & Pick-up trucks.
GROUP 2: Tandem and Tri-Axle Trucks used as Dumps, Supply, Fuel, Water, Van, Flatbody, Monorail and including Towed
Single Units, Truck Tractors used in combination with
Dumps, Van, Tank, Flatbed, Low platform or Pole Trailers, Bituminous Distributors, Agitators or Mixer Trucks (up to and including 20 cubic-yards), Rubber-tired tractors, (towing and pushing), Drag Drivers and Tag-alongs.
GROUP 3: Off Highway Trucks, Mobile Metered Mixer, Agitator or Mixer Trucks (over 20 cubic yards), Off Highway Rear
Dump Trucks, Articulating Dumps, "A" Frame & Mechanic.
TEAM0175-004 01/01/2009
BARBOUR, BOONE, BRAXTON, CALHOUN, CLAY, DODDRIDGE, FAYETTE,
GILMER, GREENBRIER, KANAWHA, MCDOWELL, MERCER, MONROE,
NICHOLAS, POCAHONTAS, PUTNAM, RALEIGH, SUMMERS, WOOD AND
WYOMING COUNTIES
Rates Fringes
TRUCK DRIVER
GROUP 1.....................$ 23.77 A
GROUP 2.....................$ 24.56 A
GROUP 3.....................$ 25.24 A
GROUP 1: Single Axle Trucks used as Dumps, Supply, Fuel, Water, Van, Flatbody, Monorail, Distributor (other than
Bituminous Distributors), and including Towed Single Units, Team 4-Up, Greasers, Tireman and Mechanic Tenders (Trucks), Yardmen, Team 2-Up and pick-up trucks.
GROUP 2: Tandem and Tri-Axle Trucks used as Dumps, Supply, Fuel, Water, Van, Flatbody, Monorail and including Towed
Single Units, Truck Tractors used in combination with Dump, Van, Tank, Flatbed, Low Platform or Pole Tailers, Bituminous Distributors, Agitator or Mixer Trucks (up to and including 20 cubic yards), Rubber-tired Tractors
(lowing and pushing), Drag Drivers and Tag-alongs.
GROUP 3: Off Highway Trucks, Mobile Metered Mixer, Agitator or Mixer Trucks (over 20 cubic yards), Off Highway Trucks, Rear Dump Trucks, Articulating Dumps, "A" Frame, Mechanic
(Truck).
A. EMPLOYER CONTRIBUTES $1,025.00 PER MONTH TO HEALTH AND
WELFARE FUND, AND $960.71 PER MONTH TO PENSION FUND WHICH
SHALL BE PAID TO EMPLOYEES WORKING FIVE (5) OR MORE WORKING
DAYS.
TEAM0505-006 01/01/2009
CABELL, LINCOLN, LOGAN, MINGO AND WAYNE COUNTIES
Rates Fringes
Truck drivers:
GROUP 1.....................$ 24.50 13.03+A
GROUP 2.....................$ 25.47 13.03+A
GROUP 3.....................$ 26.26 13.03+A
GROUP 1: Single Axle Trucks used as Dumps, Suppy, Fuel, Water, Van , Flatbody, Monorail, Distributor (other than
Bituminous Distributors) including Towed Single Units, Material Checkers & Receivers, Team 4-Up, Team 2-Up and
Pick-up trucks.
GROUP 2: Tandem and Tri-Axle Trucks used as Dumps, Supply, Fuel, Water, Van, Flatbody, Monorail and including Towed
Single Units, Truck Tractors used in combination with
Dumps, Van, Tank, Flatbed, Low platform or Pole Trailers, Bituminous Distributors, Agitators or Mixer Trucks (up to and including 20 cubic-yards), Rubber-tired tractors, (towing and pushing), Drag Drivers and Tag-alongs.
GROUP 3: Off Highway Trucks, Mobile Metered Mixer, Agitator or Mixer Trucks (over 20 cubic yards), Off Highway Rear
Dump Trucks, Articulating Dumps, "A" Frame, Mechanic.
Paid Holidays: New Year's Day, Memorial Day, July 4th, Labor
Day, Thanksgiving Day, Day after Thanksgiving, and
Christmas Day.
TEAM0697-004 01/01/2009
MARSHALL AND OHIO COUNTIES
Rates Fringes
Truck drivers:
GROUP 1.....................$ 23.53 7.63+A
GROUP 2.....................$ 24.44 7.63+A
GROUP 3.....................$ 25.19 7.63+A
A. EMPLOYER CONTRIBUTES $144.60 PER WEEK TO PENSION FUND.
GROUP 1: Single Axle Trucks used as dumps, supply, fuel, water, van, flatbody, monorail, distributor (other than
Bituminous Distributors), and including towed single units, material checkers and receivers, team 4-up, greasers, tiremen and mechanic tenders (trucks), warehouse, yardmen, team 2-up John Deere gators and similar equipment.
GROUP 2: Tandem axle trucks used as dump, supply, fuel, water flatbody, monorail and including towed single units, truck tractors used in combination with dump, van, tank, flatbed, low platform, or pole trailers, bituminous distributors, agitator or mixer trucks (up to and including 20 c.y.), rubber-tired tractors (towing and pushing), drag drivers, tag-alongs, passenger vans and buses.
GROUP 3: Off Highway Trucks, mobile metered mixer, agitator or mixter trucks (over 20 cubic yards), off highway rear dump trucks, articulating dumps, "A" frame, mechanic
(truck) and/or dispatchers
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour
Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION