SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
AG-4419-S-10-0493
2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED
03/31/2010
PAGE OF PAGES
1 37 IMPORTANT - The “offer” section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
5. REQUISITION/PURCHASE REQUEST NO.
375207
6. PROJECT NO.
ARRA-FS CIM
7. ISSUED BY CODE
8. ADDRESS OFFER TO
US Forest Service EROC East 1720 Peachtree Road NW, Suite 700 Atlanta, GA 30309
North East Acquisition Team Attn: Melissa Conn 4 Farm Colony Drive Warren, PA 16365
9. FOR INFORMATION
CALL:
A. NAME
Melissa Conn B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
(814) 728-6241
SOLICITATION
NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder.”
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):
TAS::12 1102::TAS Recovery Project
Project: Road Gate Replacement and Maintenance
Location: Various Roads across the Monongahela National Forest in WV
Price Range: The Government's estimate is: between $250,000 and $500,000.
This solicitation is advertised for full and open competition pursuant to FAR 19.1007
11. The Contractor shall begin performance within 10 calendar days and complete it within 365 calendar days after receiving award, notice to proceed. This performance period is mandatory, negotiable. (See Section F.)
12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If “YES,” indicate within how many calendar days after award in Item 12B.)
YES NO
12B. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
| A. | Sealed offers in original and 1 copies to perform the work required are due at the place specified in Item 8 by 2 pm ET (hour) local time 04/29/2010(date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due. | ||
| B. | An offer guarantee | is, | is not required. (see section I) |
| C. | All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference. | ||
| D. | Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected. | ||
| NSN 7540-01-155-3212 | 1442-101 | STANDARD FORM 1442 (REV. 4-85) |
Computer Generated
| Prescribed by GSA |
| FAR (48 CFR) 53.236-1(e) |
OFFER (Must be fully completed by offeror)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14)
CODE FACILITY CODE
17. The offeror agrees to perform the work at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
20B. SIGNATURE
20C. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT
ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
| 10 U.S.C. 2304(c)( ) | 41 U.S.C. 253(c)( ) |
| 26. ADMINISTERED BY | CODE |
27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
| 28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return ____ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work, requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications or incorporated by reference in or attached to this contract. |
| 29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary. |
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31A. NAME OF CONTRACTING OFFICER (Type or print) Melissa Conn
30B. SIGNATURE
30C. DATE
31B. UNITED STATES OF AMERICA
BY
31C. AWARD DATE
Computer Generated STANDARD FORM 1442 BACK (REV. 4-85)
AG-4419-S-10-0493
Recovery – Gate Mtce - Monongahela NF
PART I—THE SCHEDULE
SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS
SCHEDULE OF ITEMS
CIM-0921-9R-338-0921-01 Road Maintenance-Gates
Schedule of Items 1 - Road Maintenance Gates Pay Item Description Method of Measure Pay Unit Estimated Quantity Unit Price Amount Fabricate and Install Single Gate
AQ
Each
Fabricate and Install Double Gate
AQ
Removal of Gates
AQ
Rehab Single Gate
AQ
Rehab Double Gate
AQ
Reset Post
AQ
Furnish/Install Cross Arm
AQ
Furnish/Install Lock Post
AQ
Gate Signs Only
AQ
AQ-Actual Quantity (paid for work actually done) Total Bid $__________________
Schedule of Items 2 - Road Maintenance Gates Pay Item Description Method of Measure Pay Unit Estimated Quantity Unit Price Amount
Fabricate and Install Single Gate
AQ
Fabricate and Install Double Gate
AQ
Removal of Gates
AQ
Reset Post
AQ
Furnish/Install Cross Arm
AQ
Furnish/Install Lock Post
AQ
Gate Signs Only
AQ
AQ-Actual Quantity (paid for work actually done) Total Bid $__________________
Contractor Notes:
| There are 2 bid schedules for this project (Schedule of Items 1 and Schedule of Items 2). One schedule is based on rehabbing the majority of the existing gates and one is based on fabricating and installing new gates rather than rehabbing the old ones. You must bid on all items on both schedules, however the Forest Service will make award on one schedule only determined to be in the best interest of the government. The quantities are estimated and there may be changes based on forest needs and funding. |
| Contractor must be registered in www.ccr.gov and https://orca.bpn.gov to submit a bid. |
Pricing must be submitted for all items to be considered for award.
Awardee will be required to register in the Contractor Performance System. http://cps.od.nih.gov/Contractor_Info7.html.
There is a pre-bid meeting scheduled on April 8, 2010 at 2 pm ET. Participants shall meet at the Monongahela National Forest Supervisor’s Office, 200 Sycamore Street, Elkins, WV 26241.
SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
SCOPE OF CONTRACT
It is the intent of this contract to provide for road gate maintenance on the Monongahela National Forest. The contractor shall furnish all labor, equipment, materials, supplies (paint, primer, cement, signs, backfill, etc), supervision and incidentals required in the performance of the work. Work includes: Removal of existing gates, Fabrication and installation of gates, Removal of signs, Removal of old paint, Repainting of gate with primer and finished coats, Adjustment and replacement of crossarms, Furnish and install lock posts, Purchase and installation of signs
| NON-MOTORIZED USE WELCOME |
| TYPE 1 BARRICADE MARKERS |
| TYPE 2 OBJECT MARKERS |
LOCATION AND DESCRIPTION
Various locations across the Monongahela National Forest. See location maps.
452.211-73 Attachments to Statements of Work/Specifications. (FEB 1988)
The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.
TECHNICAL SPECIFICATIONS
GOVERNMENT FURNISHED INFORMATION
-Type 1 Gate Detail -Type 1 Double Gate Detail -Gate Repair Spreadsheet - identifies work needed at each location -Gate Location Maps - Set of Forest maps showing gate locations
PROJECT REQUIREMENTS
Fabrication and installation of gates, item 1 and 2
Gates shall be fabricated and installed in accordance with gate drawings.
Removal of Gates, item 3, Contractor shall remove gates at locations shown in the plans. All materials (pipes and concrete) shall be properly disposed of off federal lands. All signs shall be returned to the Forest Service Work Center Maintenance Garage. Any holes in the ground shall be backfilled with material approved by the COR. Ground surface shall be shaped to match adjacent terrain.
Rehab Gates, item 4 and 5.
This work includes:
- removing existing signs and returning to the Forest Service,
- adjusting tension on crossarms/turnbuckles,
- removal of paint, scale and rust to base metal in preparation for painting (gates have not been tested for lead paint but it is possible that older gates may contain lead based paint. Follow OSHA standard 1926.62 when removing paint from gates).
- applying prime and finish coats of paint as specified on the drawings
- installing contractor provided signs as specified on drawings.
Resetting Posts, item 6
This work includes:
-removing post from ground -removing concrete -repouring concrete and placement of post
Furnish/Install Cross Arm Assembly, items 7.
This work includes:
-fabricating/painting cross arm assembly -removing old cross arm assembly -installing cross arm assembly and signs
Furnish/Install Lock Post, item 8
This work includes:
-fabricating/painting lock closed or open posts -installing lock post, concreting in place -installing TYPE 2 Object markers (2 total)
Furnish/Install Gate Signs Only, item 9
This work includes:
-installing Type 2 Object markers to each post (6 total) -installing Type 1 Barricade markers red and white (4 total) -Non-motorized use welcome (1 total)
Work Hours
All field work shall be performed during daylight hours Monday through Friday. Weekend and Holiday work may be permitted if approved in advance by the COR.
Time of Performance
Work on a project shall commence within 14 calendar days of notice to proceed and be completed within 365 calendar days of start of work. The Contractor shall notify the Government representative when approaching completion of a unit of work so an inspection/acceptance can be made prior to acceptance in the event additional work is needed. Final acceptance shall be no later than 10 calendar days after receipt of notification of completion.
Safety
Contractor is required to follow all applicable OSHA standards (CFR 29), while working on the job site. In addition, it is recommended the successful contractor utilize appropriate personal protective safety equipment, which includes, but is not limited to, hard hats, ear protection, eye protection, and hand protection while working on project items. Contractor must keep the Government representative posted as to current site work, and must be especially alert to vehicular traffic during field operations.
General Notes
All gates shall be painted, unless otherwise noted. This work shall consist of removal of all signs and self adhesive stickers, removal of all paint and rust to bare metal, applications of primer and finish coats of paint of appropriate quality as specified.
Prior to any paint removal in the field, plastic or canvas tarps shall be placed under and around the gates. These tarps will be of sufficient size to contain any paint and/or rusty materials. These materials shall be removed from the Forest and disposed of properly.
All signs removed from gate are US Government Property and are to be returned to: USDA Forest Service Equipment Depot, 731 Yokum Street, Elkins, WV 26241.
Gates and gate components, with the exception of all signs, that are replaced shall be removed from Forest Service Land and shall become property of the Contractor. Exceptions include locks, locking pins and associated hardware that are suitable for reuse.
Finished Gates shall be as shown on the gate detail sheets.
SECTION D--PACKAGING AND MARKING
{For this Solicitation, there are NO clauses in this Section}
SECTION E--INSPECTION AND ACCEPTANCE
FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.arnet.gov/far/
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.246-12 Inspection of Construction. (APR 1996)
SECTION F--DELIVERIES OR PERFORMANCE
FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.arnet.gov/far/
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.242-14 Suspension of Work (APR 1984)
52.211-10 Commencement, Prosecution, and Completion of Work. (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 365 days. The time stated for completion shall include final cleanup of the premises.
This time does not include time for winter shut-down.
SECTION G--CONTRACT ADMINISTRATION DATA
AGAR 452.215-73 Post Award Conference (NOV 1996)
A post award conference with the successful offeror is required. It will be scheduled within ___10___ days after the date of contract award. The conference will be held at __TBD_________.
SECTION H--SPECIAL CONTRACT REQUIREMENTS
{For this Solicitation, there are NO clauses in this Section}
PART II--CONTRACT CLAUSES
SECTION I--CONTRACT CLAUSES
FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
www.arnet.gov/far/ www.usda.gov/procurement/policy/agar.html
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
| 52.202-1 | Definitions (JUL 2004) | |
| 52.203-3 | Gratuities (APR 1984) | |
| 52.203-5 | Covenant Against Contingent Fees (APR 1984) | |
| 52.203-6 | Restrictions on Subcontractor Sales to the Government (SEP 2006) | |
| 52.203-7 | Anti-Kickback Procedures (JUL 1995) | |
| 52.203-8 | Cancellation, Rescission, and Recovery of Funds for Illegal |
or Improper Activity (JAN 1997) 52.203-10 Price or Fee Adjustment for Illegal or Improper Activity (JAN 1997)
| 52.203-12 | Limitation on Payments to Influence Certain Federal Transactions (SEP 2007) | |
| 52.204-4 | Printed or Copied Double-Sided on Recycled Paper (AUG 2000) | |
| 52.209-2 | Prohibition on Contracting with Inverted Domestic Corporations – Representation (JUL 2009) | |
| 52.209-6 | Protecting the Government's Interest when Subcontracting |
with Contractors Debarred, Suspended, or Proposed for Debarment (MAY 2008)
| 52.211-18 | Variation in Estimated Quantity (APR 1984) | |
| 52.215-8 | Order of Precedence--Uniform Contract Format (OCT 1997) | |
| 52.219-4 | Notice of Price Evaluation Preference for HUBZone Small Business Concerns (JUL 2005) (Applicable if > $100,000) | |
| 52.219-8 | Utilization of Small Business Concerns (MAY 2004) | |
| 52.222-3 | Convict Labor (JUN 2003) | |
| 52.222-4 | Contract Work Hours and Safety Standards Act -- Overtime Compensation (JUL 2005) | |
| 52.222-6 | Davis-Bacon Act (JUL 2005) | |
| 52.222-7 | Withholding of Funds (FEB 1988) | |
| 52.222-8 | Payrolls and Basic Records (FEB 1988) | |
| 52.222-9 | Apprentices and Trainees (JUL 2005) | |
| 52.222-10 | Compliance with Copeland Act Requirements (FEB 1988) | |
| 52.222-11 | Subcontracts (Labor Standards) (JUL 2005) | |
| 52.222-12 | Contract Termination - Debarment (FEB 1988) | |
| 52.222-13 | Compliance with Davis-Bacon and Related Act Regulations (FEB 1988) | |
| 52.222-14 | Disputes Concerning Labor Standards (FEB 1988) | |
| 52.222-15 | Certification of Eligibility (FEB 1988) | |
| 52.222-21 | Prohibition of Segregated Facilities (FEB 1999) | |
| 52.222-26 | Equal Opportunity (MAR 2007) | |
| 52.222-35 | Equal Opportunity for Special Disabled Veterans, Veterans of the Vietnam Era, and other Eligible Veterans (SEP 2006) | |
| 52.222-36 | Affirmative Action for Workers with Disabilities (JUN 1998) | |
| 52.222-37 | Employment Reports on Special Disabled Veterans, Veterans of the Vietnam Era, and Other Eligible Veterans (SEP 2006) | |
| 52.222-50 | Combating Trafficking in Persons (SEP 2007) | |
| 52.222-54 | Employment Eligibility Verification (JAN 2009) | |
| 52.223-2 | Affirmative Procurement of Biobased Products Under Service and Construction Contracts (DEC 2007) | |
| 52.223-5 | Pollution Prevention and Right-to-Know Information (AUG 2003) | |
| 52.223-6 | Drug-Free Workplace (MAY 2001) | |
| 52.223-14 | Toxic Chemical Release Reporting (AUG 2003) | |
| 52.225-13 | Restrictions on Certain Foreign Purchases (JUN 2008) | |
| 52.227-1 | Authorization and Consent (DEC 2007) | |
| 52.227-2 | Notice and Assistance Regarding Patent and Copyright Infringement (DEC 2007) | |
| 52.227-4 | Patent Indemnity -- Construction Contracts (DEC 2007) | |
| 52.228-2 | Additional Bond Security (OCT 1997) | |
| 52.228-5 | Insurance – Work on a Government Installation (JAN 1997) | |
| 52.228-11 | Pledges of Assets (FEB 1992) | |
| 52.228-12 | Prospective Subcontractor Requests for Bonds (OCT 1995) | |
| 52.228-14 | Irrevocable Letter of Credit (DEC 1999) | |
| 52.228-15 | Performance and Payment Bonds – Construction (NOV 2006) | |
| 52.229-3 | Federal, State, and Local Taxes (APR 2003) | |
| 52.232-5 | Payments Under Fixed-Price Construction Contracts (SEP 2002) | |
| 52.232-17 | Interest (OCT 2008) | |
| 52.232-23 | Assignment of Claims (JAN 1986) | |
| Prompt Payment for Construction Contracts (OCT 2008) |
| 52.232-33 | Payment by Electronic Funds Transfer – Central Contractor Registration (OCT 2003) | |
| 52.233-1 | Disputes (JULY 2002) | |
| 52.233-3 | Protest After Award (AUG 1996) | |
| 52.233-4 | Applicable Law for Breach of Contract Claim (OCT 2004) | |
| 52.236-2 | Differing Site Conditions (APR 1984) | |
| 52.236-3 | Site Investigation and Conditions Affecting the Work (APR 1984) | |
| 52.236-5 | Material and Workmanship (APR 1984) | |
| 52.236-6 | Superintendence by The Contractor (APR 1984) | |
| Permits and Responsibilities (NOV 1991) |
Other Contracts (APR 1984) Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (APR 1984) Operations and Storage Areas (APR 1984)
Use and Possession Prior to Completion (APR 1984) Cleaning Up (APR 1984)
| 52.236-13 | Accident Prevention (NOV 1991) | |
| 52.236-15 | Schedules for Construction Contracts (APR 1984) | |
| 52.236-21 | Specifications and Drawings for Construction (FEB 1997) | |
| 52.236-26 | Preconstruction Conference (FEB 1995) | |
| 52.242-13 | Bankruptcy (JUL 1995) | |
| 52.243-4 | Changes (AUG 1987) | |
| 52.244-6 | Subcontracts for Commercial Items (MAR 2009) | |
| 52.245-1 | Property Records (JUN 2007) | |
| 52.246-21 | Warranty of Construction (MAR 1994) | |
| 52.248-3 | Value Engineering -- Construction (SEP 2006) | |
| 52.249-2 | Termination for Convenience of the Government (Fixed-Price) (MAY 2004) | |
| 52.249-10 | Default (Fixed-Price Construction) (APR 1984) | |
| 52.253-1 | Computer Generated Forms (JAN 1991) |
AGRICULTURE ACQUISITION REGULATION (48 CFR CHAPTER 4) CLAUSES
| 452.232-70 | Reimbursement for Bond Premiums – Fixed-Price Construction Contracts (NOV 1996) |
| 452.236-71 | Prohibition Against the Use of Lead-Paint (NOV 1996) |
| 452.236-72 | Use of Premises (NOV 1996) |
| 452.236-73 | Archeological or Historic Sites (FEB 1988) |
| 452.236-74 | Control of Erosion, Sedimentation and Pollution (NOV 1996) |
| 452.236-76 | Samples and Certificates (FEB 1988) |
| 452.236-77 | Emergency Response (NOV 1996) |
52.203-15 Whistleblower Protections Under the American Recovery and Reinvestment Act of 2009. (MAR 2009)
(a) The Contractor shall post notice of employees rights and remedies for whistleblower protections provided under section 1553 of the American Recovery and Reinvestment Act of 2009 (Pub. L. 111-5).
(b) The Contractor shall include the substance of this clause including this paragraph (b) in all subcontracts.
52.204-7 Central Contractor Registration (APR 2008)
(a) Definitions. As used in this clause— “Central Contractor Registration (CCR) database” means the primary Government repository for Contractor information required for the conduct of business with the Government.
“Data Universal Numbering System (DUNS) number” means the 9-digit number assigned by Dun and Bradstreet, Inc. (D&B) to identify unique business entities.
“Data Universal Numbering System+4 (DUNS+4) number” means the DUNS number means the number assigned by D&B plus a 4-character suffix that may be assigned by a business concern. (D&B has no affiliation with this 4-character suffix.) This 4-character suffix may be assigned at the discretion of the business concern to establish additional CCR records for identifying alternative Electronic Funds Transfer (EFT) accounts (see the FAR at Subpart 32.11) for the same concern.
“Registered in the CCR database” means that—
(1) The Contractor has entered all mandatory information, including the DUNS number or the DUNS+4 number, into the CCR database; and
(2) The Government has validated all mandatory data fields, to include validation of the Taxpayer Identification Number (TIN) with the Internal Revenue Service (IRS), and has marked the record “Active”. The Contractor will be required to provide consent for TIN validation to the Government as a part of the CCR registration process.
(b)
(1) By submission of an offer, the offeror acknowledges the requirement that a prospective awardee shall be registered in the CCR database prior to award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation.
(2) The offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation “DUNS” or “DUNS+4” followed by the DUNS or DUNS+4 number that identifies the offeror’s name and address exactly as stated in the offer. The DUNS number will be used by the Contracting Officer to verify that the offeror is registered in the CCR database.
(c) If the offeror does not have a DUNS number, it should contact Dun and Bradstreet directly to obtain one.
(1) An offeror may obtain a DUNS number—
(i) Via the internet at http://fedgov.dnb.com/webform or if the offeror does not have internet access, it may call Dun and Bradstreet at 1-866-705-5711 if located within the United States; or
(ii) If located outside the United States, by contacting the local Dun and Bradstreet office. The offeror should indicate that it is an offeror for a U.S. Government contract when contacting the local Dun and Bradstreet office.
(2) The offeror should be prepared to provide the following information:
(i) Company legal business name.
(ii) Tradestyle, doing business, or other name by which your entity is commonly recognized.
(iii) Company physical street address, city, state and Zip Code.
(iv) Company mailing address, city, state and Zip Code (if separate from physical).
(v) Company telephone number.
(vi) Date the company was started.
(vii) Number of employees at your location.
(viii) Chief executive officer/key manager.
(ix) Line of business (industry).
(x) Company Headquarters name and address (reporting relationship within your entity).
(d) If the Offeror does not become registered in the CCR database in the time prescribed by the Contracting Officer, the Contracting Officer will proceed to award to the next otherwise successful registered Offeror.
(e) Processing time, which normally takes 48 hours, should be taken into consideration when registering. Offerors who are not registered should consider applying for registration immediately upon receipt of this solicitation.
(f) The Contractor is responsible for the accuracy and completeness of the data within the CCR database, and for any liability resulting from the Government’s reliance on inaccurate or incomplete data. To remain registered in the CCR database after the initial registration, the Contractor is required to review and update on an annual basis from the date of initial registration or subsequent updates its information in the CCR database to ensure it is current, accurate and complete. Updating information in the CCR does not alter the terms and conditions of this contract and is not a substitute for a properly executed contractual document.
(g) (1)
(i) If a Contractor has legally changed its business name, “doing business as” name, or division name (whichever is shown on the contract), or has transferred the assets used in performing the contract, but has not completed the necessary requirements regarding novation and change-of-name agreements in Subpart 42.12, the Contractor shall provide the responsible Contracting Officer a minimum of one business day’s written notification of its intention to:
(A) Change the name in the CCR database;
(B) Comply with the requirements of Subpart 42.12 of the FAR;
(C) Agree in writing to the timeline and procedures specified by the responsible Contracting Officer. The Contractor must provide with the notification sufficient documentation to support the legally changed name.
(ii) If the Contractor fails to comply with the requirements of paragraph (g)(1)(i) of this clause, or fails to perform the agreement at paragraph (g)(1)(i)(C) of this clause, and, in the absence of a properly executed novation or change-of-name agreement, the CCR information that shows the Contractor to be other than the Contractor indicated in the contract will be considered to be incorrect information within the meaning of the “Suspension of Payment” paragraph of the electronic funds transfer (EFT) clause of this contract.
(2) The Contractor shall not change the name or address for EFT payments or manual payments, as appropriate, in the CCR record to reflect an assignee for the purpose of assignment of claims (see FAR Subpart 32.8, Assignment of Claims). Assignees shall be separately registered in the CCR database. Information provided to the Contractor’s CCR record that indicates payments, including those made by EFT, to an ultimate recipient other than that Contractor will be considered to be incorrect information within the meaning of the “Suspension of payment” paragraph of the EFT clause of this contract.
(h) Offerors and Contractors may obtain information on registration and annual confirmation requirements via the Internet at http://www.ccr.gov or by calling 1-888-227-2423, or 269-961-5757.
52.204-11 American Recovery and Reinvestment Act--Reporting Requirements. (MAR 2009)
(a) Definitions. As used in this clause--
"Contract," as defined in FAR 2.101, means a mutually binding legal relationship obligating the seller to furnish the supplies or services (including construction) and the buyer to pay for them. It includes all types of commitments that obligate the Government to an expenditure of appropriated funds and that, except as otherwise authorized, are in writing. In addition to bilateral instruments, contracts include (but are not limited to) awards and notices of awards; job orders or task letters issued under basic ordering agreements; letter contracts; orders, such as purchase orders, under which the contract becomes effective by written acceptance or performance; and bilateral contract modifications. Contracts do not include grants and cooperative agreements covered by 31 U.S.C. 6301, et seq. For discussion of various types of contracts, see FAR Part 16.
"First-tier subcontract" means a subcontract awarded directly by a Federal Government prime contractor whose contract is funded by the Recovery Act.
"Jobs created" means an estimate of those new positions created and filled, or previously existing unfilled positions that are filled, as a result of funding by the American Recovery and Reinvestment Act of 2009 (Recovery Act). This definition covers only prime contractor positions established in the United States and outlying areas (see definition in FAR 2.101). The number shall be expressed as "full-time equivalent" (FTE), calculated cumulatively as all hours worked divided by the total number of hours in a full-time schedule, as defined by the contractor. For instance, two full-time employees and one part-time employee working half days would be reported as 2.5 FTE in each calendar quarter.
"Jobs retained" means an estimate of those previously existing filled positions that are retained as a result of funding by the American Recovery and Reinvestment Act of 2009 (Recovery Act). This definition covers only prime contractor positions established in the United States and outlying areas (see definition in FAR 2.101). The number shall be expressed as "full-time equivalent" (FTE), calculated cumulatively as all hours worked divided by the total number of hours in a full-time schedule, as defined by the contractor. For instance, two full-time employees and one part-time employee working half days would be reported as 2.5 FTE in each calendar quarter.
"Total compensation" means the cash and noncash dollar value earned by the executive during the contractor's past fiscal year of the following (for more information see 17 CFR 229.402(c)(2)):
(1) Salary and bonus.
(2) Awards of stock, stock options, and stock appreciation rights. Use the dollar amount recognized for financial statement reporting purposes with respect to the fiscal year in accordance with the Statement of Financial Accounting Standards No. 123 (Revised 2004) (FAS 123R), Shared Based Payments.
(3) Earnings for services under non-equity incentive plans. Does not include group life, health, hospitalization or medical reimbursement plans that do not discriminate in favor of executives, and are available generally to all salaried employees.
(4) Change in pension value. This is the change in present value of defined benefit and actuarial pension plans.
(5) Above-market earnings on deferred compensation which is not tax-qualified.
(6) Other compensation. For example, severance, termination payments, value of life insurance paid on behalf of the employee, perquisites or property if the value for the executive exceeds $10,000.
(b) This contract requires the contractor to provide products and/or services that are funded under the American Recovery and Reinvestment Act of 2009 (Recovery Act). Section 1512(c) of the Recovery Act requires each contractor to report on its use of Recovery Act funds under this contract. These reports will be made available to the public.
(c) Reports from contractors for all work funded, in whole or in part, by the Recovery Act, and for which an invoice is submitted prior to June 30, 2009, are due no later than July 10, 2009. Thereafter, reports shall be submitted no later than the 10th day after the end of each calendar quarter.
(d) The Contractor shall report the following information, using the online reporting tool available at http://www.FederalReporting.gov.
(1) The Government contract and order number, as applicable.
(2) The amount of Recovery Act funds invoiced by the contractor for the reporting period. A cumulative amount from all the reports submitted for this action will be maintained by the government's on-line reporting tool.
(3) A list of all significant services performed or supplies delivered, including construction, for which the contractor invoiced in this calendar quarter.
(4) Program or project title, if any.
(5) A description of the overall purpose and expected outcomes or results of the contract, including significant deliverables and, if appropriate, associated units of measure.
(6) An assessment of the contractor's progress towards the completion of the overall purpose and expected outcomes or results of the contract (i.e., not started, less than 50 percent completed, completed 50 percent or more, or fully completed). This covers the contract (or portion thereof) funded by the Recovery Act.
(7) A narrative description of the employment impact of work funded by the Recovery Act. This narrative should be cumulative for each calendar quarter and only address the impact on the contractor's workforce. At a minimum, the contractor shall provide--
(i) A brief description of the types of jobs created and jobs retained in the United States and outlying areas (see definition in FAR 2.101). This description may rely on job titles, broader labor categories, or the contractor's existing practice for describing jobs as long as the terms used are widely understood and describe the general nature of the work; and
(ii) An estimate of the number of jobs created and jobs retained by the prime contractor, in the United States and outlying areas. A job cannot be reported as both created and retained.
(8) Names and total compensation of each of the five most highly compensated officers of the Contractor for the calendar year in which the contract is awarded if--
(i) In the Contractor's preceding fiscal year, the Contractor received--
(A) 80 percent or more of its annual gross revenues from Federal contracts (and subcontracts), loans, grants (and subgrants) and cooperative agreements; and
(B) $25,000,000 or more in annual gross revenues from Federal contracts (and subcontracts), loans, grants (and subgrants) and cooperative agreements; and
(ii) The public does not have access to information about the compensation of the senior executives through periodic reports filed under section 13(a) or 15(d) of the Securities Exchange Act of 1934 (15 U.S.C. 78m(a), 78o(d)) or section 6104 of the Internal Revenue Code of 1986.
(9) For subcontracts valued at less than $25,000 or any subcontracts awarded to an individual, or subcontracts awarded to a subcontractor that in the previous tax year had gross income under $300,000, the Contractor shall only report the aggregate number of such first tier subcontracts awarded in the quarter and their aggregate total dollar amount.
(10) For any first-tier subcontract funded in whole or in part under the Recovery Act, that is over $25,000 and not subject to reporting under paragraph 9, the contractor shall require the subcontractor to provide the information described in (i), (ix), (x), and (xi) below to the contractor for the purposes of the quarterly report. The contractor shall advise the subcontractor that the information will be made available to the public as required by section 1512 of the Recovery Act. The contractor shall provide detailed information on these first-tier subcontracts as follows:
(i) Unique identifier (DUNS Number) for the subcontractor receiving the award and for the subcontractor's parent company, if the subcontractor has a parent company.
(ii) Name of the subcontractor.
(iii) Amount of the subcontract award.
(iv) Date of the subcontract award.
(v) The applicable North American Industry Classification System (NAICS) code.
(vi) Funding agency.
(vii) A description of the products or services (including construction) being provided under the subcontract, including the overall purpose and expected outcomes or results of the subcontract.
(viii) Subcontract number (the contract number assigned by the prime contractor).
(ix) Subcontractor's physical address including street address, city, state, and country. Also include the nine-digit zip code and congressional district if applicable.
(x) Subcontract primary performance location including street address, city, state, and country. Also include the nine-digit zip code and congressional district if applicable.
(xi) Names and total compensation of each of the subcontractor's five most highly compensated officers, for the calendar year in which the subcontract is awarded if--
(A) In the subcontractor's preceding fiscal year, the subcontractor received--
(l) 80 percent or more of its annual gross revenues in Federal contracts (and subcontracts), loans, grants (and subgrants), and cooperative agreements; and
(2) $25,000,000 or more in annual gross revenues from Federal contracts (and subcontracts), loans, grants (and subgrants), and cooperative agreements; and
(B) The public does not have access to information about the compensation of the senior executives through periodic reports filed under section 13(a) or 15(d) of the Securities Exchange Act of 1934 (15 U.S.C. 78m(a), 78o(d)) or section 6104 of the Internal Revenue Code of 1986.
52.214-26 Audit and Records—Sealed Bidding Alt 1 (Mar 2009)
(a) As used in this clause, “records” includes books, documents, accounting procedures and practices, and other data, regardless of type and regardless of whether such items are in written form, in the form of computer data, or in any other form.
(b) Cost or pricing data. If the Contractor has been required to submit cost or pricing data in connection with the pricing of any modification to this contract, the Contracting Officer, or an authorized representative of the Contracting Officer, in order to evaluate the accuracy, completeness, and currency of the cost or pricing data, shall have the right to examine and audit all of the Contractor’s records, including computations and projections, related to—
(1) The proposal for the modification;
(2) The discussions conducted on the proposal(s), including those related to negotiating;
(3) Pricing of the modification; or
(4) Performance of the modification.
(c) The Comptroller General of the United States, an appropriate Inspector General appointed under section 3 or 8G of the Inspector General Act of 1978 (5 U.S.C. App.), or an authorized representative of either of the foregoing officials, shall have access to and the right to—
(1) Examine any of the Contractor’s or any subcontractors' records that pertain to, and involve transactions relating to, this contract or a subcontract hereunder; and
(2) Interview any officer or employee regarding such transactions.
(d) Availability. The Contractor shall make available at its office at all reasonable times the materials described in paragraph (b) of this clause, for examination, audit, or reproduction, until 3 years after final payment under this contract, or for any other period specified in Subpart 4.7 of the Federal Acquisition Regulation (FAR). FAR Subpart 4.7, Contractor Records Retention, in effect on the date of this contract, is incorporated by reference in its entirety and made a part of this contract.
(1) If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement.
(2) Records pertaining to appeals under the Disputes clause or to litigation or the settlement of claims arising under or relating to the performance of this contract shall be made available until disposition of such appeals, litigation, or claims.
(e)(1) Except as provided in paragraph (e)(2), the Contractor shall insert a clause containing the provisions of this clause, including this paragraph (e), in all subcontracts.
(2) The authority of the Inspector General under paragraph (c)(2) of this clause does not flow down to subcontracts.
52.225-21 Required Use of American Iron, Steel, and Other Manufactured Goods—Buy American Act—Construction Materials. (MAR 2009)
(a) Definitions. As used in this clause— “Construction material” means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
“Domestic construction material” means—
(1) An unmanufactured construction material mined or produced in the United States; or
(2) A construction material manufactured in the United States.
“Foreign construction material” means a construction material other than a domestic construction material.
“Manufactured construction material” means any construction material that is not unmanufactured construction material.
“Steel” means an alloy that includes at least 50 percent iron, between .02 and 2 percent carbon, and may include other elements.
“United States” means the 50 States, the District of Columbia, and outlying areas.
“Unmanufactured construction material” means raw material brought to the construction site for incorporation into the building or work that has not been—
(1) Processed into a specific form and shape; or
(2) Combined with other raw material to create a material that has different properties than the properties of the individual raw materials.
(b) Domestic preference.
(1) This clause implements—
(i) Section 1605 of the American Recovery and Reinvestment Act of 2009 (Recovery Act) (Pub. L. 111-5), by requiring, unless an exception applies, that all iron, steel, and other manufactured goods used as construction material in the project are produced in the United States; and
(ii) The Buy American Act (41 U.S.C. 10a - 10d) by providing a preference for unmanufactured domestic construction material.
(2) The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraph (b)(3) and (b)(4) of this clause.
(3) This requirement does not apply to the construction material or components listed by the Government as follows:
____________None______________________________ [Contracting Officer to list applicable excepted materials or indicate “none”]
(4) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(3) of this clause if the Government determines that—
(i) The cost of domestic construction material would be unreasonable.
(A) The cost of domestic iron, steel, or other manufactured goods used as construction material is unreasonable when the cumulative cost of such material will increase the cost of the contract by more than 25 percent;
(B) The cost of unmanufactured construction material is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;
(ii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available quantities and of a satisfactory quality; or
(iii) The application of the restriction of section 1605 of the Recovery Act or the Buy American Act to a particular construction material would be inconsistent with the public interest.
(c) Request for determination of inapplicability of Section 1605 of the Recovery Act or the Buy American Act (1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(4) of this clause shall include adequate information for Government evaluation of the request, including—
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Cost;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(4) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed cost comparison table in the format in paragraph (d) of this clause.
(iii) The cost of construction material shall include all delivery costs to the construction site and any applicable duty.
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
(2) If the Government determines after contract award that an exception to section 1605 of the Recovery Act or the Buy American Act applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable cost of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(4)(i) of this clause.
(3) Unless the Government determines that an exception to section 1605 of the Recovery Act or the Buy American Act applies, use of foreign construction material is noncompliant with section 1605 of the American Recovery and Reinvestment Act or the Buy American Act.
(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
Construction Material Description Unit of Measure Quantity Cost (Dollars)* Item 1:
Foreign construction material Domestic construction material
Item 2:
Domestic construction material
[List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.] [Include other applicable supporting information.] [* Include all delivery costs to the construction site.] Foreign and Domestic Construction Materials Cost Comparison
FAR 52.228-1 Bid Guarantee (SEP 1996) (Applicable over $100,000)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds –
(1) To unsuccessful bidders as soon as practicable after the opening of bids, and (2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.
(c) The amount of the bid guarantee shall be __20____ percent of the bid price or $_30,000___, whichever is less.
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
52.228-15 Performance and Payment Bonds—Construction. (NOV 2006)
(a) Definitions. As used in this clause— “Original contract price” means the award price of the contract; or, for requirements contracts, the price payable for the estimated total quantity; or, for indefinite-quantity contracts, the price payable for the specified minimum quantity. Original contract price does not include the price of any options, except those options exercised at the time of contract award.
(b) Amount of required bonds. Unless the resulting contract price is $100,000 or less, the successful offeror shall furnish performance and payment bonds to the Contracting Officer as follows:
(1) Performance bonds (Standard Form 25). The penal amount of performance bonds at the time of contract award shall be 100 percent of the original contract price.
(2) Payment Bonds (Standard Form 25A). The penal amount of payment bonds at the time of contract award shall be 100 percent of the original contract price.
(3) Additional bond protection.
(i) The Government may require additional performance and payment bond protection if the contract price is increased. The increase in protection generally will equal 100 percent of the increase in contract price.
(ii) The Government may secure the additional protection by directing the Contractor to increase the penal amount of the existing bond or to obtain an additional bond.
(c) Furnishing executed bonds. The Contractor shall furnish all executed bonds, including any necessary reinsurance agreements, to the Contracting Officer, within the time period specified in the Bid Guarantee provision of the solicitation, or otherwise specified by the Contracting Officer, but in any event, before starting work.
(d) Surety or other security for bonds. The bonds shall be in the form of firm commitment, supported by corporate sureties whose names appear on the list contained in Treasury Department Circular 570, individual sureties, or by other acceptable security such as postal money order, certified check, cashier's check, irrevocable letter of credit, or, in accordance with Treasury Department regulations, certain bonds or notes of the United States. Treasury Circular 570 is published in the Federal Register or may be obtained from the:
U.S. Department of the Treasury Financial Management Service Surety Bond Branch 3700 East West Highway, Room 6F01 Hyattsville, MD 20782.
Or via the internet at http://www.fms.treas.gov/c570/.
(e) Notice of subcontractor waiver of protection (40 U.S.C. 3133(c)). Any waiver of the right to sue on the payment bond is void unless it is in writing, signed by the person whose right is waived, and executed after such person has first furnished labor or material for use in the performance of the contract.
452.228-71 Insurance Coverage (NOV 1996)
Pursua…
This is the start of the file's text. The full file is on GovTribe.
Other files
| File | Type | Posted |
|---|---|---|
| type1_gate_detail revision 1.pdf | ||
| type1_double_gate_detail revision 1.pdf | ||
| Amendment 1.rtf | RTF text file | |
| Pre-bid meeting notes.pdf | ||
| J2 - gate_sign_detail drawings.pdf | ||
| J1 Gate Repair Spreadsheet.pdf | ||
| J4 - Location maps 11 x 17.pdf | ||
| sf24 bid bond form.pdf | ||
| J3 - Wage Determinations.doc | DOC document | |
| SF1442 Contractor to complete and return.rtf | RTF text file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .