Schedule of Items__updated 4-16-10.xlsx

XLSX spreadsheet 13 KB Posted

Attached to
RECOVERY: PADDLE CREEK CULVERT REPLACMENT, WAYNE NATIONAL FOREST
Solicitation number
AG-4419-S-10-0411
Issued by

About this file

Updated Schedule

View the file

Other files

File Type Posted
Amendment_03.pdf PDF
Monday Crk Ford Paddle Creek Replacement.docx DOCX document
Attachment 10001.pdf PDF
Solicitation_02.pdf PDF
Specification Paddle Creek_updated.pdf PDF
Paddel Creek Drawings_updated 4-16-2010.pdf PDF
SF 1442 Cont_0411.pdf PDF
Paddle_Creek_PLAN_VIEW_1of3.pdf PDF
Paddle_Creek_BOX_CULVERT_DETAILS_3of3.pdf PDF
SF 1442.pdf PDF
COVER SHEET.pdf PDF
CIM-0914-18EW-230-0914-04_Specs Paddle Crk.pdf PDF
Paddle_Creek_PROFILE_VIEW_2of3.pdf PDF
DBA_WD.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Schedule

U.S.F.S. WAYNE NATIONAL FOREST
AOP crossings forest wide - high priority watersheds - Paddle Creek
ELIZABETH TOWNSHIP, LAWRENCE COUNTY, OHIO
CIM-0914-18EW-230-0914-04
Method of
ItemDescriptionMeasurementUnit PriceQuantityUnitItems Total
1MobilizationLSQ1LS
2Sediment Control Dike - "D" RockAQ75Tons
3Sediment Control Dike - GeotextileCQ50Sq. Yd.
4Removal of existing 4 ft. dia. PE culvertLSQ1LS
5Precast Concrete Box Culvert (ASTM C1433) 14 ft. (W) x 6 ft. (D)AQ28LF
6"D" Rock Plunging PoolAQ100Tons
7Native Channel Bed Material Fill Plunging Pool Area/ Bed in CulvertCQ100Cu. Yd.
8Excavation of upstream channelCQ850Cu. Yd.
9"D" Rock downstream stepsAQ78Tons
10"C" Rock downstream stepsAQ117Tons
11Native Channel Bed Material Downstream FillCQ550Cu. Yd.
12Bank-Cut Area Grading/PlacementLSQ1LS
13PavementAQ12Cu. Yd.
14Seeding and MulchingAQ2Acres
15Reinforced Root Wad BarbAQ2Each
16"B" Rock RiprapAQ45Tons
17ODOT 89 Bedding MaterialAQ15Tons
18GeotextileAQ500Sq. Yd.
ESTIMATE TOTAL
One of the following methods of measurement for determining final payment is DESIGNATED IN THE SCHEDULE OF ITEMS for each PAY ITEM:
a.) Contract Quantities (CQ). These quantities denote the final number of units to be paid for under the terms of the contract. They are based upon the original design data available prior to advertising the project. Original design data include the preliminary survey information, design assumptions, calculations, drawings, and the presentation in the contract. Changes in the number of units DESIGNATED IN THE SCHEDULE OF ITEMS may be authorized under any of the following conditions:
(1) Changes in the work authorized by the CO.
(2) A determination by the CO that errors exist in the original design that cause a PAY ITEM quantity to change by 15 percent or more.
(3) A written request submitted to the CO showing evidence of errors in the original design that cause the quantity of a PAY ITEM to change by 15 percent or more. The evidence must be verifiable and consist of calculations, drawings, or other data that show how the designed quantity is in error.

b.) Staked Quantities (SQ). These quantities are determined from staked measurements prior to construction.

c.) Actual Quantities (AQ). These quantities are determined from measurements of completed work.

d.) Vehicle Quantities (VQ). These quantities are measured or weighed in hauling vehicles.

e.) Lump Sum Quantities (LSQ). These quantities denote one complete unit of work as required by or described in the contract, including necessary materials, equipment, and labor to complete the unit of work.