CIM-0900-17F-546-0919-02_Specs.doc
DOC document 82 KB Posted
- Solicitation number
- AG-4419-S-10-0303
About this file
Specs
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF-1449.doc | DOC document | |
| CIM-0900-17F-546-0919-02_SignInstallationGuide_Part2.pdf | ||
| CIM-0900-17F-546-0919-02_Spec List.doc | DOC document | |
| CIM-0900-17F-546-0919-02_SignInstallationGuide_Part1.pdf | ||
| CIM-0900-17F-546-0919-02_Sign Detail List.xls | XLS spreadsheet | |
| CIM-0900-17F-546-0919-02_Evaluation_Criteria.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CIM-0900-17F-546-0919-02_Install ANF Rec Signs
Preface
Preface_wo_03_15_2004_m Delete all but the first paragraph and add the following:
The Forest Service, US Department of Agriculture has adopted FP-03 for construction of National Forest System Roads. FP-03 is available on the internet at the following site:
http://flh.fhwa.dot.gov/resources/pse/specs/
101 - Terms, Format, and Definitions
101.00_nat_us_07_25_2005
101.01_nat_us_01_22_2009
101.01 Meaning of Terms
Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications.
101.03_nat_us_06_16_2006
101.03 Abbreviations.
Add the following to (a) Acronyms:
AFPA
MSHA
NIST
NESC
WCLIB
American Forest and Paper Association Mine Safety and Health Administration National Institute of Standards and Technology National Electrical Safety Code West Coast Lumber Inspection Bureau
Add the following to (b) SI symbols:
| mp |
| Milepost |
| ppm |
| Part Per Million |
101.04_nat_us_03_29_2007
101.04 Definitions.
Delete the following definitions and substitute the following:
Bid Schedule--The Schedule of Items.
Bridge--No definition.
Contractor--The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “purchaser”.
Culvert--No definition.
Right-of-Way--A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.
Add the following:
Adjustment in Contract Price--“Equitable adjustment,” as used in the Federal Acquisition Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.
Change--“Change” means “change order” as used in the Federal Acquisition Regulations, or “design change” as used in the Timber Sale Contract.
Design Quantity--“Design quantity” is a Forest Service method of measurement from the FS-96 Forest Service Specifications for the Construction of Roads and Bridges. Under these FP specifications this term is replaced by the term “Contract Quantities”.
Forest Service--The United States of America, acting through the Forest Service, U.S. Department of Agriculture.
Neat Line--A line defining the proposed or specified limits of an excavation or structure.
Pioneer Road--Temporary construction access built along the route of the project.
Purchaser--The individual, partnership, joint venture, or corporation contracting with the Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.
Protected Streamcourse--A drainage shown on the plans or timber sale area map that requires designated mitigation measures.
Road Order--An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.
Schedule of Items--A schedule in the contract that contains a listing and description of construction items, quantities, units of measure, unit price, and amount.
Utilization Standards--The minimum size and percent soundness of trees described in the specifications to determine merchantable timber.
Add Figure 101-1—Illustration of road structure terms:
Figure 101-1—Illustration of road structure terms.
102 - Bid, Award, and Execution of Contract
102.00_nat_us_02_16_2005
102 Bid, Award, and Execution of Contract
Delete Section 102 in its entirety.
103 - Scope of Work
103.00_nat_us_02_16_2005
Deletions
Delete all but subsection 103.01 Intent of Contract.
103.01 Intent of Contract
Add the following:
Contractor shall provide all labor, transportation and incidental equipment (i.e. hammers, wrenches, post hole diggers, etc) necessary to install recreation signs, identified by the Forest Service, within the designated recreation areas of the Allegheny National Forest (i.e. Reflective aluminum signs, routed recycled plastic signs and painted cedar signs)
The following equipment will be provided by the Forest Service:
· All signs panels
· All hardware (nuts, bolts, fasteners) necessary for installing signs to posts Specific sign installation locations will be provided to contractor after award of contract.
Sign installations shall conform to the layout and specifications in the Forest Service Manual Supplement, Sign Installation Guide – July 2003. A hard copy will be provided to the contractor.
104 - Control of Work
104.00_nat_us_06_16_2006
Deletions
Delete Sections 104.01, 104.02, and 104.04.
104.06_nat_us_02_17_2005
Add the following subsections:
104.06 Use of Roads by Contractor
The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.
104.07 Schedule of Work
A pre-work conference will be conducted after the contract award at which time a complete listing of roads and maps will be given to the Contractor. These documents will show individual roads, sign installation schematics, and maps describing work locations. Adjustments to this schedule may be made as priorities change. Adjustments will be limited to ± 20% of the total contract quantities as specified in the schedule. Any such adjustments require prior written documentation (Work Order) from the Contracting Officer’s Representative (COR).
105 - Control of Material
105.02_nat_us_01_18_2007
105.02 Material Sources.
105.02(a) Government-provided sources.
Add the following:
Comply with the requirements of 30 CFR 56, subparts B and H. Use all suitable material for aggregate regardless of size unless otherwise designated. When required, re-establish vegetation in disturbed areas according to section 625.
105.05_nat_us_05_12_2004
105.05 Use of Material Found in the Work.
Delete 105.05 (a) and (b) and the last sentence of the second paragraph and substitute the following:
Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. The Government is not obligated to make reimbursement for the cost of producing these materials.
106 - Acceptance of Work
106.07_nat_us_05_11_2004
106.07 Delete
Delete subsection 106.07.
107 - Legal Relations and Responsibility to the Public
107.05_nat_us_05_11_2004
107.05 Responsibility for Damage Claims.
Delete the entire subsection.
107.06_nat_us_06_16_2006
107.06 Contractor’s Responsibility for Work.
Delete the following from the first paragraph.
“except as provided in Subsection 106.07”.
107.09_nat_us_06_16_2006
107.09 Legal Relationship of the Parties.
Delete the entire subsection.
107.10_nat_us_06_16_2006
108 - Prosecution and Progress
108.00_nat_us_02_16_2005
108 Delete.
Delete Section 108 in its entirety.
109 - Measurement and Payment
109.00_nat_us_02_17_2005
109 Deletions
Delete the following entire subsections:
109.06 Pricing of Adjustments.
109.07 Eliminated Work.
109.08 Progress Payments.
109.09 Final Payment.
109.02_nat_us_06_16_2006
109.02 Measurement Terms and Definitions.
(b) Contract quantity.
Add the following:
Contract quantities will be adjusted only when there are errors in the original design of 15% or more.
155 - Schedules for Construction Contracts
155.00_nat_us_05_11_2004
155 Delete.
Delete Section 155 in its entirety.
633 - Permanent Traffic Control
633.02_nat_us_03_03_2005
633.01 Description.
Delete the subsection and add the following:
This work consists of removing existing signs and installing government furnished signs.
633.03_nat_us_03_03_2005
633.03 General.
Delete the subsection and add the following:
Sign panels and incidental fasteners, as listed in Subsection 103.01, will be furnished by the Government.
Sign installations shall conform to the layout and specifications shown in the Forest Service Manual Supplement, Sign Installation Guide – July 2003.
633.05_nat_us_03_03_2005
File details come from the government source that posted it. Updated .