CIM-0900-17F-546-0919-02_Evaluation_Criteria.doc
DOC document 23 KB Posted
- Solicitation number
- AG-4419-S-10-0303
About this file
Evaluation Criteria
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF-1449.doc | DOC document | |
| CIM-0900-17F-546-0919-02_SignInstallationGuide_Part2.pdf | ||
| CIM-0900-17F-546-0919-02_Spec List.doc | DOC document | |
| CIM-0900-17F-546-0919-02_SignInstallationGuide_Part1.pdf | ||
| CIM-0900-17F-546-0919-02_Sign Detail List.xls | XLS spreadsheet | |
| CIM-0900-17F-546-0919-02_Specs.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CIM-0900-17F-546-0919-02_Install ANF Rec Signs
RECOMMENDED EVALUATION CRITERIA
1. Based on ability of contractor to complete work as scheduled. Contractor shall identify all existing contracts with percentage work remaining, anticipated work between date this request is issued and May 01, 2010, and workforce and equipment available during this time period.
2. Based on Price.
3. Based on past performance on Forest Service type road construction/ reconstruction projects.
Evaluation shall be weighted equally for each criteria.
File details come from the government source that posted it. Updated .