CIM-0900-17F-546-0919-02_Evaluation_Criteria.doc

DOC document 23 KB Posted

Attached to
Install Forest Service provided signs on Allegheny National Forest
Solicitation number
AG-4419-S-10-0303
Issued by

About this file

Evaluation Criteria

View the file

Other files

File Type Posted
SF-1449.doc DOC document
CIM-0900-17F-546-0919-02_SignInstallationGuide_Part2.pdf PDF
CIM-0900-17F-546-0919-02_Spec List.doc DOC document
CIM-0900-17F-546-0919-02_SignInstallationGuide_Part1.pdf PDF
CIM-0900-17F-546-0919-02_Sign Detail List.xls XLS spreadsheet
CIM-0900-17F-546-0919-02_Specs.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CIM-0900-17F-546-0919-02_Install ANF Rec Signs

RECOMMENDED EVALUATION CRITERIA

1. Based on ability of contractor to complete work as scheduled. Contractor shall identify all existing contracts with percentage work remaining, anticipated work between date this request is issued and May 01, 2010, and workforce and equipment available during this time period.

2. Based on Price.

3. Based on past performance on Forest Service type road construction/ reconstruction projects.

Evaluation shall be weighted equally for each criteria.