C - SECTION G_contract_admin.docx
DOCX document 21 KB Posted
- Attached to
- RECOVERY* Mine Closure-Upper Peninsula-Michigan Federal contract opportunity
- Solicitation number
- AG-4419-S-10-0022
About this file
Section G - Contract Administration
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 2 - SF30.pdf | ||
| Attachment 3 - pre-bid_mtg_attendee_list.doc | DOC document | |
| C - SECTION J_attach_and_exhibits.docx | DOCX document | |
| Attachment 2 - 5711 PASP Requirements.doc | DOC document | |
| Attachment 1 - pre-bid_mtg_notes.doc | DOC document | |
| Amendment 1 - SF30 .pdf | ||
| C - NEPA_Map1_Norwich_dm.pdf | ||
| C - SECTION H_special_requirements.doc | DOC document | |
| C - Wage Determination.doc | DOC document | |
| C - Construction ARRA Clauses.doc | DOC document | |
| C - Evaluation Criteria.doc | DOC document | |
| C - Schedule_of_items.xls | XLS spreadsheet | |
| C - SECTION J_attach_and_exhibits.docx | DOCX document | |
| C - SECTION F_deliveries_performance.doc | DOC document | |
| C- SECTION C _SOW_SPECS.doc | DOC document | |
| SF1442.pdf | ||
| C - SECTION E_inspection_acceptance.docx | DOCX document |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CIM-0907-3A-006-0907-01
SECTION G--CONTRACT ADMINISTRATION DATA
AGAR 452.215-73 Post Award Conference (NOV 1996) A post award conference with the successful offeror is required. It will be scheduled within 60 days after the date of contract award. The conference will be held at a location to be determined.
GOVERNMENT-FURNISHED PROPERTY
| Item |
| Description |
| Where, When, How |
| Bagged topsoil |
| 120 bags (40#) of topsoil will be provided for use on foam plugs. If additional topsoil is needed to meet contract specifications, the contractor will have to provide at no cost to the government. |
| Available at the Forest Service Office in Ironwood for contractor delivery to site |
| Three-wheeled cart |
| Three-wheeled hand cart capable of hauling 500 pounds. |
| Available at request by contractor to haul materials to mine openings. |
| Seed Mix |
| The Government shall provide the exact seed mix for the contractor to procure on reclamation and decommissioning of roads and disturbed areas |
| Provided in Section J.1.3. |
METHOD OF CALCULATING PAYMENT
Payment Calculation Payment less damages will be based on the number of features completed. In cases where partial remediation of a feature or features is agreed upon due to safety related factors such as ground conditions, payment shall be prorated.
Unacceptable Work Any feature remediated at less than the performance standards in section C of this contract will be considered unacceptable and may be rejected. For unacceptably remediated features, the Government may (i) accept the work at a reduced price (ii) require the feature to be reworked at no additional expense to the Government, or (iii) reject the work in its entirety. If the work quality is unacceptable, the Contractor’s right to proceed is subject to immediate termination for default.
Scheduling Contractor's requests to rework an area will be permitted only at a time agreeable to the Government.
Re-inspection Any Government quality assurance assessment needed due to the Contractor reworking an area will be at the Contractor's expense. Items to be included in the actual damage includes (but is not limited to) wages of the COR and Government inspector(s) incurred due to the rework and costs of vehicles that are incurred while administering the contract during the rework.
Performance Evaluation Any work quality that the Government determines as unacceptable will be so noted in the performance evaluation.
DAMAGES
Warranties The contractor shall exercise existing manufacturers’ commercial warranties on all Government purchased equipment and supplies, including warranties on existing equipment, equipment replacements, and new equipment installations under this Contract. The contractor shall exercise the warranty to repair or replace any installed equipment and materials furnished by the contractor that fail within the warranty period. The contractor shall report to the contracting officer instances in which the costs of enforcement would exceed the benefits derived. The contractor shall repair warranty items without recourse to the warranty if the failure or defect results from contractor abuse or if the Government directs such repair. Existence of a warranty does not alleviate the contractor of the responsibility to perform the work under this Contract. The contractor shall inform the Government in writing of all warranty actions. All written warranties shall be kept on file.
Liquidated Damages Remediation Quality. It is agreed that when the quality of remediation work does not meet specifications, the Government is damaged. Generally, poor quality work can be corrected or in some extreme cases, removed and replaced. Therefore, liquidated damages are not appropriate to this contract.
Damages at Large It is agreed that when the quality of remediation work does not meet specifications, the Government is damaged. Damages assessed by the Government shall be set at the cost of repairs necessary to bring the work to specification. If this is not possible, damages assessed by the Government shall be no more than the cost to remove and replace the work.
Archeology It is agreed that any damage to archeological resources shall be assessed as stated in section C 5.7.3 of this contract.