C - SECTION G_contract_admin.docx

DOCX document 21 KB Posted

Attached to
RECOVERY* Mine Closure-Upper Peninsula-Michigan Federal contract opportunity
Solicitation number
AG-4419-S-10-0022
Issued by
Department of Agriculture Forest Service Washington Office Economic Recovery Operations Center East

About this file

Section G - Contract Administration

View the file

Other files for this federal contract opportunity

Other files attached to RECOVERY* Mine Closure-Upper Peninsula-Michigan, newest first.
File Type Posted
Amendment 2 - SF30.pdf PDF
Attachment 3 - pre-bid_mtg_attendee_list.doc DOC document
C - SECTION J_attach_and_exhibits.docx DOCX document
Attachment 2 - 5711 PASP Requirements.doc DOC document
Attachment 1 - pre-bid_mtg_notes.doc DOC document
Amendment 1 - SF30 .pdf PDF
C - NEPA_Map1_Norwich_dm.pdf PDF
C - SECTION H_special_requirements.doc DOC document
C - Wage Determination.doc DOC document
C - Construction ARRA Clauses.doc DOC document
C - Evaluation Criteria.doc DOC document
C - Schedule_of_items.xls XLS spreadsheet
C - SECTION J_attach_and_exhibits.docx DOCX document
C - SECTION F_deliveries_performance.doc DOC document
C- SECTION C _SOW_SPECS.doc DOC document
SF1442.pdf PDF
C - SECTION E_inspection_acceptance.docx DOCX document
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CIM-0907-3A-006-0907-01

SECTION G--CONTRACT ADMINISTRATION DATA

AGAR 452.215-73 Post Award Conference (NOV 1996) A post award conference with the successful offeror is required. It will be scheduled within 60 days after the date of contract award. The conference will be held at a location to be determined.

GOVERNMENT-FURNISHED PROPERTY

Item
Description
Where, When, How
Bagged topsoil
120 bags (40#) of topsoil will be provided for use on foam plugs. If additional topsoil is needed to meet contract specifications, the contractor will have to provide at no cost to the government.
Available at the Forest Service Office in Ironwood for contractor delivery to site
Three-wheeled cart
Three-wheeled hand cart capable of hauling 500 pounds.
Available at request by contractor to haul materials to mine openings.
Seed Mix
The Government shall provide the exact seed mix for the contractor to procure on reclamation and decommissioning of roads and disturbed areas
Provided in Section J.1.3.

METHOD OF CALCULATING PAYMENT

Payment Calculation Payment less damages will be based on the number of features completed. In cases where partial remediation of a feature or features is agreed upon due to safety related factors such as ground conditions, payment shall be prorated.

Unacceptable Work Any feature remediated at less than the performance standards in section C of this contract will be considered unacceptable and may be rejected. For unacceptably remediated features, the Government may (i) accept the work at a reduced price (ii) require the feature to be reworked at no additional expense to the Government, or (iii) reject the work in its entirety. If the work quality is unacceptable, the Contractor’s right to proceed is subject to immediate termination for default.

Scheduling Contractor's requests to rework an area will be permitted only at a time agreeable to the Government.

Re-inspection Any Government quality assurance assessment needed due to the Contractor reworking an area will be at the Contractor's expense. Items to be included in the actual damage includes (but is not limited to) wages of the COR and Government inspector(s) incurred due to the rework and costs of vehicles that are incurred while administering the contract during the rework.

Performance Evaluation Any work quality that the Government determines as unacceptable will be so noted in the performance evaluation.

DAMAGES

Warranties The contractor shall exercise existing manufacturers’ commercial warranties on all Government purchased equipment and supplies, including warranties on existing equipment, equipment replacements, and new equipment installations under this Contract. The contractor shall exercise the warranty to repair or replace any installed equipment and materials furnished by the contractor that fail within the warranty period. The contractor shall report to the contracting officer instances in which the costs of enforcement would exceed the benefits derived. The contractor shall repair warranty items without recourse to the warranty if the failure or defect results from contractor abuse or if the Government directs such repair. Existence of a warranty does not alleviate the contractor of the responsibility to perform the work under this Contract. The contractor shall inform the Government in writing of all warranty actions. All written warranties shall be kept on file.

Liquidated Damages Remediation Quality. It is agreed that when the quality of remediation work does not meet specifications, the Government is damaged. Generally, poor quality work can be corrected or in some extreme cases, removed and replaced. Therefore, liquidated damages are not appropriate to this contract.

Damages at Large It is agreed that when the quality of remediation work does not meet specifications, the Government is damaged. Damages assessed by the Government shall be set at the cost of repairs necessary to bring the work to specification. If this is not possible, damages assessed by the Government shall be no more than the cost to remove and replace the work.

Archeology It is agreed that any damage to archeological resources shall be assessed as stated in section C 5.7.3 of this contract.