Environmental report.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Responses_to_questions.pdf | ||
| AG-4329-S-16-0001.pdf | ||
| Flooring_DIAGRAM.pdf | ||
| RFQ_Remidation_Byron_SOW.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REPLACE HVAC SYSTEM
BUILDING 1
FOR
USDA-ARS, SOUTHEASTERN FRUIT
AND TREE NUT RESEARCH STATION
BYRON, GEORGIA
Environmental Report Final Submittal June 24, 2015
USDA Contract Number: AG-3K15-C-11-0011 USDA Order Number: AG-32SC-D-14-0178
TM Project Number: 14023
SURVEY
FOR ASBESTOS & LEAD-IN PAINT
USDA BYRON HVAC REPLACEMENT
US HORTICULTURAL RESEARCH LABORATORY
BYRON, GEORGIA
Prepared for:
TOLAND & MIZELL ARCHITECTS, INC.
590 MEANS STREET NW, SUITE 200
ATLANTA, GEORGIA 30318
Report Date:
August 28, 2014
Prepared by:
DURBIN ENVIRONMENTAL CONSULTANTS, INC.
3461 LAWRENCEVILLE-SUWANEE ROAD, SUITE A
SUWANEE, GEORGIA 30024
(678) 482-9917
USDA Byron, Building 1 HVAC Replacement DEC Project No. 1408.002
TABLE OF CONTENTS
PAGE
1. INTRODUCTION 3
2. DISCUSSION AND RESULTS 3
a. Asbestos
b. Lead
c. PCBs/Fluorescent Lights
3. METHODOLOGY 5
Asbestos sampling protocol
Lead-In-Paint (LBP) sampling protocol
4. OBSERVATIONS/CONCLUSIONS 7
5. RECOMMENDATIONS 8
6. REFERENCES 9
APPENDIX
A. Asbestos Bulk Sampling Summary followed by the Laboratory Report and
Representative Photographs of Suspect Asbestos Containing Materials
B. Paint Chip Sampling Summary followed by the Laboratory Report and Representative
Photographs of Paint Chip Samples
1. INTRODUCTION
Durbin Environmental Consultants, Inc. (DEC) was retained by Toland & Mizell Architects, Inc., to conduct a hazardous material assessment for suspect asbestos containing materials and lead-in-paint (LBP) at the USDA Horticultural Research Laboratory, Building 1 in Byron, Georgia. Michael F. Durbin, CIH and Sellers C. Carmack of Durbin Environmental Consultants, Inc., conducted the hazardous material assessment on August 19, 2014. Mr. Durbin and Mr.
Carmack are currently accredited as asbestos inspectors through an Environmental Protection
Agency (EPA) approved training provider.
Bulk sample analysis for suspect asbestos containing materials was performed by Analytical
Environmental Services, Inc., 3785 Presidential Parkway, Suite 111, Atlanta, Georgia 30340.
Analytical Environmental Services Inc. is accredited for asbestos fiber analysis through participation in the National Institute of Standards and Technology (NIST) National Voluntary
Laboratory Accreditation Program (NVLAP) and is assigned NVLAP Lab Code 102082-0.
Analytical Environmental Services Inc. utilized the analytical method: EPA/600/R-93/116:
"Method for the Determination of Asbestos in Bulk Building Materials” (polarized light microscopy in conjunction with dispersion staining).
2. DISCUSSION AND RESULTS
a. USDA Byron Building 1 - Asbestos
The asbestos survey was conducted in accordance with the sampling protocol established in the
Environmental Protection Agency’s Asbestos Hazard Emergency Response Act (AHERA 40
CFR, Part 763) for the materials included in this specific survey. The following provides general information and summarizes the potential impact of asbestos containing material during any scheduled renovation project.
Bulk samples were collected from the following suspect asbestos containing materials during this survey:
1. BATT Insulation (HM #1)
2. Built Up Roof with Stones (HM #2)
3. Black Covebase and Associated Mastic/Glue/Adhesive (HM #3)
4. Grey Covebase and Associated Mastic/Glue/Adhesive (HM #4)
5. 2’ X 4’ White Ceiling Tile with Fissures and Sparse Pinholes (HM #5)
6. 2’ X 4’ White Ceiling Tile with Small Gouges and Pinholes (HM #6)
7. 2’ X 4’ White Ceiling Tile with Fissures and Dense Pinholes (HM #7)
8. 2’ x 2’ White Ceiling Tile (HM #8)
9. 2’ X 2’ White Ceiling Tile with Fissures (HM #9)
10. Duct Insulation – Foil Wrapped with Brown Mastic (HM #10)
11. Duct Insulation – Foil Wrapped with Tan Mastic (HM #11)
12. Duct Insulation – Canvas Wrapped (HM #12)
13. Drywall and Joint Compound (HM #13)
14. 9” X 9” Floor Tile – White with Grey Streaks and Associated Mastic/Glue/Adhesives (HM
#14)
15. Grey Roof Flashing on Equipment (HM #15)
16. Pipe Insulation – Canvas Wrapped with Foamglass/Fiberglass (HM #16)
17. Pipe Insulation – Paper Wrapped with Fiberglass (HM #17)
18. Roof Penetration Sealant - White (HM #18)
19. Roof Shingles on Exhaust Equipment (HM #19)
20. Laboratory Fume Hoods – Transite-type (Assumed Positive)
21. Perimeter Wall Panels – Transite-type (Assumed Positive)
The following collected bulk sample materials contained asbestos by Polarized Light
Microscopy (PLM) (reference Appendix A for the Asbestos Bulk Sampling Summary followed by the Laboratory Report and Representative Photographs of Suspect Asbestos Containing
Materials).
1. 9” X 9” Floor Tile – White with Grey Streaks and Associated Mastic/Glue/Adhesives (HM
2. Grey Roof Flashing on Equipment (HM #15)
3. Pipe Insulation – Canvas Wrapped with Foamglass/Fiberglass (HM #16)
4. Laboratory Fume Hoods – Transite-type (Assumed Positive)
5. Perimeter Wall Panels – Transite-type (Assumed Positive)
b. USDA Byron Building 1 - Lead
Paint chip samples were collected from the following representative surfaces:
1. Blue Paint on Metal Door Frame, Room 236 Mechanical Room (Sample # B-PC-01)
2. Brown Paint over Blue Paint on Metal Door, Room 236 Mechanical Room (Sample # B-PC-
02)
3. Beige Paint on CMU Walls, Room 236 Mechanical Room (Sample # B-PC-03)
4. Blue Paint on Metal Door Frame, Auditorium (Sample # B-PC-04)
5. Beige Paint on Concrete Columns, Auditorium (Sample # B-PC-05)
All of the painted surfaces sampled in USDA Byron Building 1 in areas that will be impacted by the scheduled renovation project had detectable levels of lead via Flame Atomic Absorption
Spectrophotometry.
The Occupational Safety and Health Administration (OSHA) Construction Industry Standard for
Lead (29 CFR 1926.62) does not reference the HUD definition for LBP. If detectable levels of lead are identified in any painted surface, paint disturbance will fall under the OSHA Lead
Standard. OSHA 29 CFR 1926.62 requires employers to perform exposure monitoring for employees whose tasks disturb or potentially disturb lead. The data contained in this survey report should be provided to the Contractor, prior to the Contractor submitting bids for maintenance, renovation or demolition work. The Contractor shall assume that all painted surfaces may contain detectable levels of lead for purposes of this project and demonstrate through personal air sampling that airborne lead levels will not exceed 30 micrograms (ug) lead per cubic meter (m ) of air determined as an 8-hour time-weighted average (TWA), for each representative task and trade that disturbs painted surfaces.
Refer to Appendix B for the Paint Chip Sample Summary followed by Laboratory Data and
Representative Photographs of Paint Chip Samples.
c. USDA Byron Building 1 - PCBs/Fluorescent Lights
The construction date of USDA Byron Building 1 was not known on the day of the inspection.
All ballasts installed or manufactured prior to 1978, should be assumed to contain PCBs unless specifically labeled as having no PCBs.
Additionally, the fluorescent lights and high intensity discharge bulbs (HID) should be assumed to contain mercury.
All known or assumed PCB ballasts should be handled in accordance with 40 CFR Part 761
Polychlorinated Biphenyls (PCBs) Manufacturing, Processing, Distribution in Commerce, and
Use Prohibitions.
All mercury vapor light fixtures should be handled in accordance with 40 CFR Part 273
Standards for Universal Waste Management.
3. METHODOLOGY
Asbestos Sampling Protocol
The inspector sampled all suspect ACM in accessible areas. In order for a group of homogeneous materials to be considered as non asbestos containing, all samples from that specific homogeneous material must be analyzed and determined to be non asbestos containing or less than or equal to 1% asbestos.
Representative, randomly selected samples were collected from each homogeneous area of suspect asbestos-containing material. For purposes of this report, the homogeneous area is physically defined as all material with the same visual appearance, texture and hardness.
Material types followed by NOT APPLICABLE were not identified during this asbestos survey.
The minimum number of samples collected for each homogeneous area (or material) is as follows:
1. Friable Spray-applied or Trowel-applied Material (NOT APPLICABLE)
a. Less than or equal to 1000 square feet (S.F.) = 3 samples
b. Greater than 1000 S.F. and less than or equal to 5000 S.F. = 5 samples.
c. Greater than 5000 S. F. = 7 samples
2. Pipe and Duct Insulation
Three samples per homogeneous area of insulation were taken unless it was a confirmation sample.
3. Elbows, Valves, Fittings and Connection Mud
Three representative samples were taken from each representative type of insulated elbow, valve, fitting and connecting mud unless it was a confirmation sample.
4. Boiler, Tanks and Furnaces (NOT APPLICABLE)
A minimum of 3 samples per unit was collected.
5. Patchwork
Patchwork is defined as a patch or repair to existing material based on the following quantities:
a. Surfacing material patches are limited to a maximum of 6 S. F.
b. Pipe and duct insulation patches are limited to a maximum of 6 L. F. or 6
S. F.
c. Boiler, tanks and furnace patches are limited to 6 S.F. maximum.
If the patchwork exceeded the limits prescribed above, the sampling protocol resorted back to the homogeneous area descriptions in items 1-4. If a material qualifies as patchwork, a single sample was collected per patch.
6. Ceiling or Acoustical Tile
a. Minimum of 3 Samples
7. Miscellaneous Friable Material (INCLUDED DRYWALL & JOINT
COMPOUND)
a. 3 Samples
8. Non-friable Material
Non-friable materials for purposes of this survey would include material such as floor tiles and mastic/adhesive, linoleum floor covering, interior/exterior caulks, flooring felt (if still under floor tile), roofing materials, miscellaneous cementitious material such as wall or ceiling panels, caulking or sealant, or window glazing.
a. Minimum of 3 samples
Lead-Based Paint (LBP) Sampling Protocol
Paint chips containing lead concentrations at or above 0.5 percent by weight are considered positive for lead based on EPA and Department of Housing and Urban Development (HUD) guidelines for Target Housing and Child Occupied Facilities.
The inspector collected paint chip samples from representative surfaces and components likely to be impacted by any renovation project and compared them against the HUD definition for Lead-
Based Paint (LBP) of 0.5 % by weight. Individual sample results are presented in tabular form in Appendix B.
The Occupational Safety and Health Administration (OSHA) Construction Industry Standard for
Lead (29 CFR 1926.62) does not reference the HUD definition for LBP. If detectable levels of lead are identified in any painted surface, paint disturbance will fall under the OSHA Lead
Standard. OSHA 29 CFR 1926.62 requires employers to perform exposure monitoring for employees whose tasks disturb or potentially disturb lead. The data contained in this survey report should be provided to the Contractor, prior to the Contractor submitting bids for maintenance, renovation or demolition work. The Contractor shall assume that all painted surfaces may contain detectable levels of lead for purposes of this project and demonstrate through personal air sampling that airborne lead levels will not exceed 30 micrograms (ug) lead per cubic meter (m ) of air determined as an 8-hour time-weighted average (TWA), for each representative task and trade that disturbs painted surfaces.
4. OBSERVATIONS/CONCLUSIONS
USDA Byron Building 1 - Asbestos
The following collected bulk sample materials contained asbestos by Polarized Light
Microscopy (PLM) (reference Appendix A for the Asbestos Bulk Sampling Summary followed by the Laboratory Report and Representative Photographs of Suspect Asbestos Containing
Materials).
1. 9” X 9” Floor Tile – White with Grey Streaks and Associated Mastic/Glue/Adhesives (HM
2. Grey Roof Flashing on Equipment (HM #15)
3. Pipe Insulation – Canvas Wrapped with Foamglass/Fiberglass (HM #16)
4. Laboratory Fume Hoods – Transite-type (Assumed Positive)
5. Perimeter Wall Panels – Transite-type (Assumed Positive)
USDA Byron Building 1 - Lead
All of the painted surfaces sampled in USDA Byron Building 1 in areas that will be impacted by the scheduled renovation project had detectable levels of lead via Flame Atomic Absorption
Spectrophotometry.
Disturbance to any painted item/surface/component shall be done in compliance with the OSHA
Construction Industry Standard for Lead (29 CFR 1926.62). The Occupational Safety and
Health Administration (OSHA) Construction Industry Standard for Lead (29 CFR 1926.62) does not reference the HUD definition for LBP. If detectable levels of lead are identified in any painted surface, paint disturbance will fall under the OSHA Lead Standard. OSHA 29 CFR
1926.62 requires employers to perform exposure monitoring for employees whose tasks disturb or potentially disturb lead. The data contained in this survey report should be provided to the
Contractor, prior to the Contractor submitting bids for maintenance, renovation or demolition work. The Contractor shall assume that all painted surfaces may contain detectable levels of lead for purposes of this project and demonstrate through personal air sampling that airborne lead levels will not exceed 30 micrograms (ug) lead per cubic meter (m ) of air determined as an 8-hour time-weighted average (TWA), for each representative task and trade that disturbs painted surfaces.
USDA Byron Building 1 – PCBs/Fluorescent Lights
The construction date of USDA Byron Building 1 was not known on the day of the survey. All ballasts installed or manufactured prior to 1978, should be assumed to contain PCBs unless specifically labeled as having no PCBs.
Additionally, the fluorescent lights and high intensity discharge bulbs (HID) should be assumed to contain mercury.
All known or assumed PCB ballasts should be handled in accordance with 40 CFR Part 761
Polychlorinated Biphenyls (PCBs) Manufacturing, Processing, Distribution in Commerce, and
Use Prohibitions.
All mercury vapor light fixtures should be handled in accordance with 40 CFR Part 273
Standards for Universal Waste Management.
5. RECOMMENDATIONS
A. The asbestos containing material survey report should be maintained at the job site during performance of the construction activities. At least ten (10) working days advanced written
NESHAPS Notification to Georgia Department of Natural Resources, Environmental
Protection Division, Air Protection Branch/Air Quality Control Section, Attention: Asbestos and Lead Program, 4244 International Parkway, Suite 104, Phone: (404) 363-7026/Fax:
(404) 363-7100 and EPD Asbestos Fees Lockbox, Post Office Box 101173, Atlanta, Georgia
30392 is required for renovation work on this project.
B. Communication of this asbestos survey report results should be presented in accordance with the OSHA 29 CFR 1926.1101 Asbestos Standard to all personnel who may enter or perform work in USDA Byron Building 1.
C. Disturbance of painted surfaces should be performed in accordance with the OSHA Lead
Standard (29 CFR 1926.62). Waste generated by disturbance of painted surfaces should be subjected to Toxicity Characteristic Leaching Procedure (TCLP) testing to determine leachable lead concentrations. If leachable concentrations of lead in construction waste are determined by TCLP testing, those materials should be disposed of in accordance with 40
CFR Part 260 to 271.
D. Remove and dispose of all PCB ballasts in accordance with 40 CFR Part 761 Polychlorinated
Biphenyls (PCBs) Manufacturing, Processing, Distribution in Commerce, and Use
Prohibitions, and other applicable Federal, State and Local Regulations.
E. Remove and dispose of (or recycle) all mercury vapor light fixtures in accordance with 40
CFR Part 273 Standards for Universal Waste Management and other applicable Federal, State and Local Regulations.
6. REFERENCES
1. Guidance for Controlling Asbestos-Containing Materials in Buildings”
(Purple Book). EPA 560/5-85-024. Office of Pesticides and Toxic Substances
Washington, DC 20460.
2. 40 CFR, Part 763, Asbestos Hazard Emergency Response Act
3. 40 CFR, Part 763, Asbestos School Hazard Abatement Reauthorization Act
4. 40 CFR, Part 61, Subpart M Asbestos
5. 29 CFR Part 1926.1101 Asbestos
6. 29 CFR Part 1926.62 Lead
7. HUD Guidelines for the Evaluation and Control of Lead-Based Paint Hazards in Housing
8. 40 CFR Part 260 General Hazardous Waste Management.
9. 40 CFR Part 261 Identification and Listing of Hazardous Waste.
10. 40 CFR Part 262 Standards Applicable to Generators of Hazardous Waste.
11. 40 CFR Part 263 Standards Applicable to Transporters of Hazardous Waste.
12. 40 CFR Part 268 Land Disposal Restrictions.
13. 40 CFR Part 761 Polychlorinated Biphenyls (PCBs) Manufacturing, Processing, Distribution in Commerce, and Use Prohibitions.
14. 40 CFR Part 273 Standards for Universal Waste Management
If you have any questions or comments regarding this report, please do not hesitate to call.
Sincerely, Durbin Environmental Consultants, Inc.
Sellers C. Carmack
Sellers C. Carmack
Vice President
Michael F. Durbin, CIH
Michael F. Durbin, CIH
President
APPENDIX A
Asbestos Bulk Sampling Summary
Followed By the Laboratory Data and Representative Photographs of Suspect Asbestos Containing Materials
Sample
Number Description Asbestos
Present Friable Non-
Asbestos
Material
Present
Sample
Location
HM
B-BATT-01 BATT Insulation NAD N/A See Lab
Report
Building 1, Corridor
Outside Room
B-BATT-02 BATT Insulation NAD N/A See Lab
Report Building 1, Room 215 1
B-BATT-03 BATT Insulation NAD N/A See Lab
Report Building 1, Corridor 209
B-BUR-01 Built Up Roof with
Stones NAD N/A See Lab
Report Building 1, Roof, Center
B-BUR-02 Built Up Roof with
Stones NAD N/A See Lab
Report Building 1, Roof, East End 2
B-BUR-03 Built Up Roof with
Stones NAD N/A See Lab
Report Building 1, Roof, West End
B-CB1-01
Black Covebase and
Associated
Mastic/Glue/Adhesive
NAD N/A See Lab
Report Building 1, Entry Foyer
Room 144
B-CB1-02
Black Covebase and
Associated
Mastic/Glue/Adhesive
NAD N/A See Lab
Report
Building 1, Corridor 136
Outside Room
B-CB1-03
Black Covebase and
Associated
Mastic/Glue/Adhesive
NAD N/A See Lab
Report Building 1, Stair
2 Landing, 2 nd
Floor
Description Asbestos
Present Friable Non-
Asbestos
Material
Present
Sample
Location
HM
B-CB2-01
Grey Covebase and
Associated
Mastic/Glue/Adhesive
NAD N/A
See Lab
Report
Building 1, Auditorium
B-CB2-02
Grey Covebase and
Associated
Mastic/Glue/Adhesive
NAD N/A
See Lab
Report
Building 1, Auditorium
B-CB2-03
Grey Covebase and
Associated
Mastic/Glue/Adhesive
NAD N/A
See Lab
Report
B-CT1-01
2’ X 4’ White Ceiling
Tile with Fissures and
Sparse Pinholes
NAD N/A
See Lab
Report
Entry Room 142
B-CT1-02
Tile with Fissures and
Sparse Pinholes
NAD N/A
See Lab
Report
Building 1, Room 126
B-CT1-03
2’ X 4’ White Ceiling
Tile with Fissures and
Sparse Pinholes
NAD N/A
See Lab
Report
Building 1, Corridor
Outside
Mechanical
Room 236
B-CT2-01
Tile with Small
Gouges and Pinholes
NAD N/A
See Lab
Report
Room 124
B-CT2-02
Tile with Small
Gouges and Pinholes
NAD N/A
See Lab
Report
Building 1, Corridor
Outside Room
B-CT2-03
2’ X 4’ White Ceiling
Tile with Small
Gouges and Pinholes
NAD N/A
See Lab
Report
Room 124
B-CT3-01
Tile with Fissures and
Dense Pinholes
NAD N/A
See Lab
Report
Building 1, Corridor
Outside Room
Description Asbestos
Present Friable Non-
Asbestos
Material
Present
Sample
Location
HM
B-CT3-02
2’ X 4’ White Ceiling
Tile with Fissures and
Dense Pinholes
NAD N/A
See Lab
Report
Building 1, 1 st
Floor Corridor
Outside
Women’s
Restroom
B-CT3-03
2’ X 4’ White Ceiling
Tile with Fissures and
Dense Pinholes
NAD N/A
See Lab
Report
Building 1, 2 nd
Floor Corridor
By Mechanical
Room Louvers
B-CT4-01 2’ X 2’ White Ceiling
Tile
NAD N/A
See Lab
Report
Floor Men’s
Restroom
B-CT4-02 2’ X 2’ White Ceiling
Tile
NAD N/A
See Lab
Report
B-CT4-03 2’ X 2’ White Ceiling
Tile
NAD N/A
See Lab
Report
B-CT5-01 2’ X 2’ White Ceiling
Tile with Fissures
NAD N/A
See Lab
Report
Lobby Room
B-CT5-02 2’ X 2’ White Ceiling
Tile with Fissures
NAD N/A
See Lab
Report
B-CT5-03 2’ X 2’ White Ceiling
Tile with Fissures
NAD N/A
See Lab
Report
B-DI1-01
Duct Insulation – Foil
Wrapped with Brown
Mastic
NAD N/A
See Lab
Report
Room 137
B-DI1-02
Wrapped with Brown
Mastic
NAD N/A
See Lab
Report
Floor, Telephone
Room –
Connected to
Room 137
Description Asbestos
Present Friable Non-
Asbestos
Material
Present
Sample
Location
HM
B-DI1-03
Duct Insulation – Foil
Wrapped with Brown
Mastic
NAD N/A
See Lab
Report
Floor, Telephone
Room –
Connected to
Room 137
B-DI2-01
Duct Insulation – Foil
Wrapped with Tan
Mastic
NAD N/A
See Lab
Report
Building 1, Lobby, Room
B-DI2-02
Wrapped with Tan
Mastic
NAD N/A
See Lab
Report
Building 1, Entry, Room
B-DI2-03
Duct Insulation – Foil
Wrapped with Tan
Mastic
NAD N/A
See Lab
Report
Building 1, Corridor
Outside
B-DI3-01
Duct Insulation –
Canvas Wrapped
NAD N/A
See Lab
Report
Building 1, B-DI3-02
Duct Insulation –
Canvas Wrapped
NAD N/A
See Lab
Report
Building 1, Mechanical
Room 236
B-DI3-03
Duct Insulation –
Canvas Wrapped
NAD N/A
See Lab
Report
Room
B-DWJC-01
Drywall and Joint
Compound
NAD N/A
See Lab
Report
B-DWJC-02
Drywall and Joint
Compound
NAD N/A
See Lab
Report
Building 1, Auditorium
B-DWJC-03
Drywall and Joint
Compound
NAD N/A
See Lab
Report
Description Asbestos
Present Friable Non-
Asbestos
Material
Present
Sample
Location
HM
B-FT1-01
9” X 9” Floor Tile –
White with Grey
Streaks and Associated
Mastic/Glue/Adhesive
2%
Chrysotile
(Floor Tile);
5%
Chrysotile
(Black
Mastic)
No See Lab
Report
Building 1, Entry Foyer
Room 144, Under Carpet
B-FT1-02
9” X 9” Floor Tile –
White with Grey
Streaks and Associated
Mastic/Glue/Adhesive
2%
Chrysotile
(Floor Tile);
5%
Chrysotile
(Black
Mastic)
No See Lab
Report
Building 1, Room 113
B-FT1-03
9” X 9” Floor Tile –
White with Grey
Streaks and Associated
Mastic/Glue/Adhesive
2%
Chrysotile
(Floor Tile);
5%
Chrysotile
(Black
Mastic)
No See Lab
Report
Building 1, Room 256
Offices, Under
Carpet
B-GRF-01
Grey Roof Flashing on
Equipment
10%
Chrysotile No
See Lab
Report
Roof, Center
B-GRF-02
Grey Roof Flashing on
Equipment
10%
Chrysotile No
See Lab
Report
Building 1, Roof, East End
B-GRF-03
Grey Roof Flashing on
Equipment
10%
Chrysotile No
See Lab
Report
Roof, West End
B-PI1-01
Pipe Insulation –
Canvas Wrapped with
Foamglass/Fiberglass
NAD N/A
See Lab
Report
Building 1, Room 126, HW
Line
B-PI1-02
Pipe Insulation –
Canvas Wrapped with
Foamglass/Fiberglass
10%
Chrysotile
(Black
Mastic
Layer)
No See Lab
Report
Building 1, Mechanical
Room 236
B-PI1-03
Pipe Insulation –
Canvas Wrapped with
Foamglass/Fiberglass
NAD N/A
See Lab
Report
Room 127
Description Asbestos
Present Friable Non-
Asbestos
Material
Present
Sample
Location
HM
B-PI2-01
Pipe Insulation – Paper
Wrapped with
Fiberglass
NAD N/A
See Lab
Report
Building 1, Corridor
Outside Room
B-PI2-02
Pipe Insulation – Paper
Wrapped with
Fiberglass
NAD N/A
See Lab
Report
Building 1, Mechanical
Room 236
B-PI2-03
Pipe Insulation – Paper
Wrapped with
Fiberglass
NAD N/A
See Lab
Report
Room
B-RWS-01
Roof Penetration
Sealant - White
NAD N/A
See Lab
Report
B-RWS-02
Roof Penetration
Sealant - White
NAD N/A
See Lab
Report
Building 1, Roof, East End
B-RWS-03
Roof Penetration
Sealant - White
NAD N/A
See Lab
Report
B-S-01 Roof Shingles – On
Exhaust Equipment
NAD N/A
See Lab
Report
B-S-02 Roof Shingles – On
Exhaust Equipment
NAD N/A
See Lab
Report
Building 1, Roof, East End
B-S-03 Roof Shingles – On
Exhaust Equipment
NAD N/A
See Lab
Report
NAD – No Asbestos Detected; N/A – Not Applicable
Representative Photographs of Suspect Asbestos Containing
Materials
1. BATT Insulation (HM #1)
2. Built Up Roof with Stones (HM #2)
3. Black Covebase and Associated Mastic/Glue/Adhesive (HM #3)
4. Grey Covebase and Associated Mastic/Glue/Adhesive (HM #4)
5. 2’ X 4’ White Ceiling Tile with Fissures and Sparse Pinholes (HM #5)
6. 2’ X 4’ White Ceiling Tile with Small Gouges and Pinholes (HM #6)
7. 2’ X 4’ White Ceiling Tile with Fissures and Dense Pinholes (HM #7)
8. 2’ x 2’ White Ceiling Tile (HM #8)
9. 2’ X 2’ White Ceiling Tile with Fissures (HM #9)
10. Duct Insulation – Foil Wrapped with Brown Mastic (HM #10)
11. Duct Insulation – Foil Wrapped with Tan Mastic (HM #11)
12. Duct Insulation – Canvas Wrapped (HM #12)
13. Drywall and Joint Compound (HM #13)
14. 9” X 9” Floor Tile – White with Grey Streaks and Associated Mastic/Glue/Adhesives (HM
15. Grey Roof Flashing on Equipment (HM #15)
16. Pipe Insulation – Canvas Wrapped with Foamglass/Fiberglass (HM #16)
17. Pipe Insulation – Paper Wrapped with Fiberglass (HM #17)
18. Roof Penetration Sealant - White (HM #18)
19. Roof Shingles on Exhaust Equipment (HM #19)
Photograph Not Available
20. Laboratory Fume Hoods – Transite-type (Assumed Positive)
21. Perimeter Wall Panels – Transite-type (Assumed Positive)
APPENDIX B
Paint Chip Sample Summary Table Followed by Laboratory Data and Representative Photographs of Paint Chip Samples
Collection
Date
Sample
Number
Description Location Analytical
Method
Percent Lead by Weight
(wt%)
08/19/2014 B-PC-01 Blue Paint
Metal Door
Frame, Room
236 Mechanical
Room
AAS 0.281
08/19/2014 B-PC-02
Brown Paint over Blue Paint
Metal Door, Room 236
Mechanical
Room
AAS 0.255
08/19/2014 B-PC-03 Beige Paint
CMU Wall, Room 236
Mechanical
Room
AAS 0.0333
08/19/2014 B-PC-04 Blue Paint
Metal Door
Frame, Auditorium
AAS 0.202
08/19/2014 B-PC-05 Beige Paint
Concrete
Column, AAS 0.0514
BRL: Not Detected at the Reporting Limit
Representative Photographs of Paint Chip Samples
1. Blue Paint on Metal Door Frame, Room 236 Mechanical Room (Sample # B-PC-01)
2. Brown Paint over Blue Paint on Metal Door, Room 236 Mechanical Room (Sample # B-
PC-02)
3. Beige Paint on CMU Walls, Room 236 Mechanical Room (Sample # B-PC-03)
4. Blue Paint on Metal Door Frame, Auditorium (Sample # B-PC-04)
5. Beige Paint on Concrete Columns, Auditorium (Sample # B-PC-05)
590 Means Street NW, Suite 200 � Atlanta, GA 30318 � (404) 343-3500
| ADP96D4.tmp |
| REPLACE HVAC SYSTEM BUILDING 1 |
| FOR |
| USDA-ARS, SOUTHEASTERN FRUIT |
| AND TREE NUT RESEARCH STATION |
| BYRON, GEORGIA |
| Environmental Report |
| Final Submittal |
| June 24, 2015 |
| USDA Contract Number: AG-3K15-C-11-0011 |