USDA_Byron_Building_1_Final_Environmental_Report.pdf

PDF 9 MB Posted

Attached to
Remediation of Flooring
Solicitation number
AG-4329-S-16-0001
Issued by

About this file

Environmental report.

View the file

Other files

File Type Posted
Responses_to_questions.pdf PDF
AG-4329-S-16-0001.pdf PDF
Flooring_DIAGRAM.pdf PDF
RFQ_Remidation_Byron_SOW.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REPLACE HVAC SYSTEM

BUILDING 1

FOR

USDA-ARS, SOUTHEASTERN FRUIT

AND TREE NUT RESEARCH STATION

BYRON, GEORGIA

Environmental Report Final Submittal June 24, 2015

USDA Contract Number: AG-3K15-C-11-0011 USDA Order Number: AG-32SC-D-14-0178

TM Project Number: 14023

SURVEY

FOR ASBESTOS & LEAD-IN PAINT

USDA BYRON HVAC REPLACEMENT

US HORTICULTURAL RESEARCH LABORATORY

BYRON, GEORGIA

Prepared for:

TOLAND & MIZELL ARCHITECTS, INC.

590 MEANS STREET NW, SUITE 200

ATLANTA, GEORGIA 30318

Report Date:

August 28, 2014

Prepared by:

DURBIN ENVIRONMENTAL CONSULTANTS, INC.

3461 LAWRENCEVILLE-SUWANEE ROAD, SUITE A

SUWANEE, GEORGIA 30024

(678) 482-9917

USDA Byron, Building 1 HVAC Replacement DEC Project No. 1408.002

TABLE OF CONTENTS

PAGE

1. INTRODUCTION 3

2. DISCUSSION AND RESULTS 3

a. Asbestos

b. Lead

c. PCBs/Fluorescent Lights

3. METHODOLOGY 5

Asbestos sampling protocol

Lead-In-Paint (LBP) sampling protocol

4. OBSERVATIONS/CONCLUSIONS 7

5. RECOMMENDATIONS 8

6. REFERENCES 9

APPENDIX

A. Asbestos Bulk Sampling Summary followed by the Laboratory Report and

Representative Photographs of Suspect Asbestos Containing Materials

B. Paint Chip Sampling Summary followed by the Laboratory Report and Representative

Photographs of Paint Chip Samples

1. INTRODUCTION

Durbin Environmental Consultants, Inc. (DEC) was retained by Toland & Mizell Architects, Inc., to conduct a hazardous material assessment for suspect asbestos containing materials and lead-in-paint (LBP) at the USDA Horticultural Research Laboratory, Building 1 in Byron, Georgia. Michael F. Durbin, CIH and Sellers C. Carmack of Durbin Environmental Consultants, Inc., conducted the hazardous material assessment on August 19, 2014. Mr. Durbin and Mr.

Carmack are currently accredited as asbestos inspectors through an Environmental Protection

Agency (EPA) approved training provider.

Bulk sample analysis for suspect asbestos containing materials was performed by Analytical

Environmental Services, Inc., 3785 Presidential Parkway, Suite 111, Atlanta, Georgia 30340.

Analytical Environmental Services Inc. is accredited for asbestos fiber analysis through participation in the National Institute of Standards and Technology (NIST) National Voluntary

Laboratory Accreditation Program (NVLAP) and is assigned NVLAP Lab Code 102082-0.

Analytical Environmental Services Inc. utilized the analytical method: EPA/600/R-93/116:

"Method for the Determination of Asbestos in Bulk Building Materials” (polarized light microscopy in conjunction with dispersion staining).

2. DISCUSSION AND RESULTS

a. USDA Byron Building 1 - Asbestos

The asbestos survey was conducted in accordance with the sampling protocol established in the

Environmental Protection Agency’s Asbestos Hazard Emergency Response Act (AHERA 40

CFR, Part 763) for the materials included in this specific survey. The following provides general information and summarizes the potential impact of asbestos containing material during any scheduled renovation project.

Bulk samples were collected from the following suspect asbestos containing materials during this survey:

1. BATT Insulation (HM #1)

2. Built Up Roof with Stones (HM #2)

3. Black Covebase and Associated Mastic/Glue/Adhesive (HM #3)

4. Grey Covebase and Associated Mastic/Glue/Adhesive (HM #4)

5. 2’ X 4’ White Ceiling Tile with Fissures and Sparse Pinholes (HM #5)

6. 2’ X 4’ White Ceiling Tile with Small Gouges and Pinholes (HM #6)

7. 2’ X 4’ White Ceiling Tile with Fissures and Dense Pinholes (HM #7)

8. 2’ x 2’ White Ceiling Tile (HM #8)

9. 2’ X 2’ White Ceiling Tile with Fissures (HM #9)

10. Duct Insulation – Foil Wrapped with Brown Mastic (HM #10)

11. Duct Insulation – Foil Wrapped with Tan Mastic (HM #11)

12. Duct Insulation – Canvas Wrapped (HM #12)

13. Drywall and Joint Compound (HM #13)

14. 9” X 9” Floor Tile – White with Grey Streaks and Associated Mastic/Glue/Adhesives (HM

#14)

15. Grey Roof Flashing on Equipment (HM #15)

16. Pipe Insulation – Canvas Wrapped with Foamglass/Fiberglass (HM #16)

17. Pipe Insulation – Paper Wrapped with Fiberglass (HM #17)

18. Roof Penetration Sealant - White (HM #18)

19. Roof Shingles on Exhaust Equipment (HM #19)

20. Laboratory Fume Hoods – Transite-type (Assumed Positive)

21. Perimeter Wall Panels – Transite-type (Assumed Positive)

The following collected bulk sample materials contained asbestos by Polarized Light

Microscopy (PLM) (reference Appendix A for the Asbestos Bulk Sampling Summary followed by the Laboratory Report and Representative Photographs of Suspect Asbestos Containing

Materials).

1. 9” X 9” Floor Tile – White with Grey Streaks and Associated Mastic/Glue/Adhesives (HM

2. Grey Roof Flashing on Equipment (HM #15)

3. Pipe Insulation – Canvas Wrapped with Foamglass/Fiberglass (HM #16)

4. Laboratory Fume Hoods – Transite-type (Assumed Positive)

5. Perimeter Wall Panels – Transite-type (Assumed Positive)

b. USDA Byron Building 1 - Lead

Paint chip samples were collected from the following representative surfaces:

1. Blue Paint on Metal Door Frame, Room 236 Mechanical Room (Sample # B-PC-01)

2. Brown Paint over Blue Paint on Metal Door, Room 236 Mechanical Room (Sample # B-PC-

02)

3. Beige Paint on CMU Walls, Room 236 Mechanical Room (Sample # B-PC-03)

4. Blue Paint on Metal Door Frame, Auditorium (Sample # B-PC-04)

5. Beige Paint on Concrete Columns, Auditorium (Sample # B-PC-05)

All of the painted surfaces sampled in USDA Byron Building 1 in areas that will be impacted by the scheduled renovation project had detectable levels of lead via Flame Atomic Absorption

Spectrophotometry.

The Occupational Safety and Health Administration (OSHA) Construction Industry Standard for

Lead (29 CFR 1926.62) does not reference the HUD definition for LBP. If detectable levels of lead are identified in any painted surface, paint disturbance will fall under the OSHA Lead

Standard. OSHA 29 CFR 1926.62 requires employers to perform exposure monitoring for employees whose tasks disturb or potentially disturb lead. The data contained in this survey report should be provided to the Contractor, prior to the Contractor submitting bids for maintenance, renovation or demolition work. The Contractor shall assume that all painted surfaces may contain detectable levels of lead for purposes of this project and demonstrate through personal air sampling that airborne lead levels will not exceed 30 micrograms (ug) lead per cubic meter (m ) of air determined as an 8-hour time-weighted average (TWA), for each representative task and trade that disturbs painted surfaces.

Refer to Appendix B for the Paint Chip Sample Summary followed by Laboratory Data and

Representative Photographs of Paint Chip Samples.

c. USDA Byron Building 1 - PCBs/Fluorescent Lights

The construction date of USDA Byron Building 1 was not known on the day of the inspection.

All ballasts installed or manufactured prior to 1978, should be assumed to contain PCBs unless specifically labeled as having no PCBs.

Additionally, the fluorescent lights and high intensity discharge bulbs (HID) should be assumed to contain mercury.

All known or assumed PCB ballasts should be handled in accordance with 40 CFR Part 761

Polychlorinated Biphenyls (PCBs) Manufacturing, Processing, Distribution in Commerce, and

Use Prohibitions.

All mercury vapor light fixtures should be handled in accordance with 40 CFR Part 273

Standards for Universal Waste Management.

3. METHODOLOGY

Asbestos Sampling Protocol

The inspector sampled all suspect ACM in accessible areas. In order for a group of homogeneous materials to be considered as non asbestos containing, all samples from that specific homogeneous material must be analyzed and determined to be non asbestos containing or less than or equal to 1% asbestos.

Representative, randomly selected samples were collected from each homogeneous area of suspect asbestos-containing material. For purposes of this report, the homogeneous area is physically defined as all material with the same visual appearance, texture and hardness.

Material types followed by NOT APPLICABLE were not identified during this asbestos survey.

The minimum number of samples collected for each homogeneous area (or material) is as follows:

1. Friable Spray-applied or Trowel-applied Material (NOT APPLICABLE)

a. Less than or equal to 1000 square feet (S.F.) = 3 samples

b. Greater than 1000 S.F. and less than or equal to 5000 S.F. = 5 samples.

c. Greater than 5000 S. F. = 7 samples

2. Pipe and Duct Insulation

Three samples per homogeneous area of insulation were taken unless it was a confirmation sample.

3. Elbows, Valves, Fittings and Connection Mud

Three representative samples were taken from each representative type of insulated elbow, valve, fitting and connecting mud unless it was a confirmation sample.

4. Boiler, Tanks and Furnaces (NOT APPLICABLE)

A minimum of 3 samples per unit was collected.

5. Patchwork

Patchwork is defined as a patch or repair to existing material based on the following quantities:

a. Surfacing material patches are limited to a maximum of 6 S. F.

b. Pipe and duct insulation patches are limited to a maximum of 6 L. F. or 6

S. F.

c. Boiler, tanks and furnace patches are limited to 6 S.F. maximum.

If the patchwork exceeded the limits prescribed above, the sampling protocol resorted back to the homogeneous area descriptions in items 1-4. If a material qualifies as patchwork, a single sample was collected per patch.

6. Ceiling or Acoustical Tile

a. Minimum of 3 Samples

7. Miscellaneous Friable Material (INCLUDED DRYWALL & JOINT

COMPOUND)

a. 3 Samples

8. Non-friable Material

Non-friable materials for purposes of this survey would include material such as floor tiles and mastic/adhesive, linoleum floor covering, interior/exterior caulks, flooring felt (if still under floor tile), roofing materials, miscellaneous cementitious material such as wall or ceiling panels, caulking or sealant, or window glazing.

a. Minimum of 3 samples

Lead-Based Paint (LBP) Sampling Protocol

Paint chips containing lead concentrations at or above 0.5 percent by weight are considered positive for lead based on EPA and Department of Housing and Urban Development (HUD) guidelines for Target Housing and Child Occupied Facilities.

The inspector collected paint chip samples from representative surfaces and components likely to be impacted by any renovation project and compared them against the HUD definition for Lead-

Based Paint (LBP) of 0.5 % by weight. Individual sample results are presented in tabular form in Appendix B.

The Occupational Safety and Health Administration (OSHA) Construction Industry Standard for

Lead (29 CFR 1926.62) does not reference the HUD definition for LBP. If detectable levels of lead are identified in any painted surface, paint disturbance will fall under the OSHA Lead

Standard. OSHA 29 CFR 1926.62 requires employers to perform exposure monitoring for employees whose tasks disturb or potentially disturb lead. The data contained in this survey report should be provided to the Contractor, prior to the Contractor submitting bids for maintenance, renovation or demolition work. The Contractor shall assume that all painted surfaces may contain detectable levels of lead for purposes of this project and demonstrate through personal air sampling that airborne lead levels will not exceed 30 micrograms (ug) lead per cubic meter (m ) of air determined as an 8-hour time-weighted average (TWA), for each representative task and trade that disturbs painted surfaces.

4. OBSERVATIONS/CONCLUSIONS

USDA Byron Building 1 - Asbestos

The following collected bulk sample materials contained asbestos by Polarized Light

Microscopy (PLM) (reference Appendix A for the Asbestos Bulk Sampling Summary followed by the Laboratory Report and Representative Photographs of Suspect Asbestos Containing

Materials).

1. 9” X 9” Floor Tile – White with Grey Streaks and Associated Mastic/Glue/Adhesives (HM

2. Grey Roof Flashing on Equipment (HM #15)

3. Pipe Insulation – Canvas Wrapped with Foamglass/Fiberglass (HM #16)

4. Laboratory Fume Hoods – Transite-type (Assumed Positive)

5. Perimeter Wall Panels – Transite-type (Assumed Positive)

USDA Byron Building 1 - Lead

All of the painted surfaces sampled in USDA Byron Building 1 in areas that will be impacted by the scheduled renovation project had detectable levels of lead via Flame Atomic Absorption

Spectrophotometry.

Disturbance to any painted item/surface/component shall be done in compliance with the OSHA

Construction Industry Standard for Lead (29 CFR 1926.62). The Occupational Safety and

Health Administration (OSHA) Construction Industry Standard for Lead (29 CFR 1926.62) does not reference the HUD definition for LBP. If detectable levels of lead are identified in any painted surface, paint disturbance will fall under the OSHA Lead Standard. OSHA 29 CFR

1926.62 requires employers to perform exposure monitoring for employees whose tasks disturb or potentially disturb lead. The data contained in this survey report should be provided to the

Contractor, prior to the Contractor submitting bids for maintenance, renovation or demolition work. The Contractor shall assume that all painted surfaces may contain detectable levels of lead for purposes of this project and demonstrate through personal air sampling that airborne lead levels will not exceed 30 micrograms (ug) lead per cubic meter (m ) of air determined as an 8-hour time-weighted average (TWA), for each representative task and trade that disturbs painted surfaces.

USDA Byron Building 1 – PCBs/Fluorescent Lights

The construction date of USDA Byron Building 1 was not known on the day of the survey. All ballasts installed or manufactured prior to 1978, should be assumed to contain PCBs unless specifically labeled as having no PCBs.

Additionally, the fluorescent lights and high intensity discharge bulbs (HID) should be assumed to contain mercury.

All known or assumed PCB ballasts should be handled in accordance with 40 CFR Part 761

Polychlorinated Biphenyls (PCBs) Manufacturing, Processing, Distribution in Commerce, and

Use Prohibitions.

All mercury vapor light fixtures should be handled in accordance with 40 CFR Part 273

Standards for Universal Waste Management.

5. RECOMMENDATIONS

A. The asbestos containing material survey report should be maintained at the job site during performance of the construction activities. At least ten (10) working days advanced written

NESHAPS Notification to Georgia Department of Natural Resources, Environmental

Protection Division, Air Protection Branch/Air Quality Control Section, Attention: Asbestos and Lead Program, 4244 International Parkway, Suite 104, Phone: (404) 363-7026/Fax:

(404) 363-7100 and EPD Asbestos Fees Lockbox, Post Office Box 101173, Atlanta, Georgia

30392 is required for renovation work on this project.

B. Communication of this asbestos survey report results should be presented in accordance with the OSHA 29 CFR 1926.1101 Asbestos Standard to all personnel who may enter or perform work in USDA Byron Building 1.

C. Disturbance of painted surfaces should be performed in accordance with the OSHA Lead

Standard (29 CFR 1926.62). Waste generated by disturbance of painted surfaces should be subjected to Toxicity Characteristic Leaching Procedure (TCLP) testing to determine leachable lead concentrations. If leachable concentrations of lead in construction waste are determined by TCLP testing, those materials should be disposed of in accordance with 40

CFR Part 260 to 271.

D. Remove and dispose of all PCB ballasts in accordance with 40 CFR Part 761 Polychlorinated

Biphenyls (PCBs) Manufacturing, Processing, Distribution in Commerce, and Use

Prohibitions, and other applicable Federal, State and Local Regulations.

E. Remove and dispose of (or recycle) all mercury vapor light fixtures in accordance with 40

CFR Part 273 Standards for Universal Waste Management and other applicable Federal, State and Local Regulations.

6. REFERENCES

1. Guidance for Controlling Asbestos-Containing Materials in Buildings”

(Purple Book). EPA 560/5-85-024. Office of Pesticides and Toxic Substances

Washington, DC 20460.

2. 40 CFR, Part 763, Asbestos Hazard Emergency Response Act

3. 40 CFR, Part 763, Asbestos School Hazard Abatement Reauthorization Act

4. 40 CFR, Part 61, Subpart M Asbestos

5. 29 CFR Part 1926.1101 Asbestos

6. 29 CFR Part 1926.62 Lead

7. HUD Guidelines for the Evaluation and Control of Lead-Based Paint Hazards in Housing

8. 40 CFR Part 260 General Hazardous Waste Management.

9. 40 CFR Part 261 Identification and Listing of Hazardous Waste.

10. 40 CFR Part 262 Standards Applicable to Generators of Hazardous Waste.

11. 40 CFR Part 263 Standards Applicable to Transporters of Hazardous Waste.

12. 40 CFR Part 268 Land Disposal Restrictions.

13. 40 CFR Part 761 Polychlorinated Biphenyls (PCBs) Manufacturing, Processing, Distribution in Commerce, and Use Prohibitions.

14. 40 CFR Part 273 Standards for Universal Waste Management

If you have any questions or comments regarding this report, please do not hesitate to call.

Sincerely, Durbin Environmental Consultants, Inc.

Sellers C. Carmack

Sellers C. Carmack

Vice President

Michael F. Durbin, CIH

Michael F. Durbin, CIH

President

APPENDIX A

Asbestos Bulk Sampling Summary

Followed By the Laboratory Data and Representative Photographs of Suspect Asbestos Containing Materials

Sample

Number Description Asbestos

Present Friable Non-

Asbestos

Material

Present

Sample

Location

HM

B-BATT-01 BATT Insulation NAD N/A See Lab

Report

Building 1, Corridor

Outside Room

B-BATT-02 BATT Insulation NAD N/A See Lab

Report Building 1, Room 215 1

B-BATT-03 BATT Insulation NAD N/A See Lab

Report Building 1, Corridor 209

B-BUR-01 Built Up Roof with

Stones NAD N/A See Lab

Report Building 1, Roof, Center

B-BUR-02 Built Up Roof with

Stones NAD N/A See Lab

Report Building 1, Roof, East End 2

B-BUR-03 Built Up Roof with

Stones NAD N/A See Lab

Report Building 1, Roof, West End

B-CB1-01

Black Covebase and

Associated

Mastic/Glue/Adhesive

NAD N/A See Lab

Report Building 1, Entry Foyer

Room 144

B-CB1-02

Black Covebase and

Associated

Mastic/Glue/Adhesive

NAD N/A See Lab

Report

Building 1, Corridor 136

Outside Room

B-CB1-03

Black Covebase and

Associated

Mastic/Glue/Adhesive

NAD N/A See Lab

Report Building 1, Stair

2 Landing, 2 nd

Floor

Description Asbestos

Present Friable Non-

Asbestos

Material

Present

Sample

Location

HM

B-CB2-01

Grey Covebase and

Associated

Mastic/Glue/Adhesive

NAD N/A

See Lab

Report

Building 1, Auditorium

B-CB2-02

Grey Covebase and

Associated

Mastic/Glue/Adhesive

NAD N/A

See Lab

Report

Building 1, Auditorium

B-CB2-03

Grey Covebase and

Associated

Mastic/Glue/Adhesive

NAD N/A

See Lab

Report

B-CT1-01

2’ X 4’ White Ceiling

Tile with Fissures and

Sparse Pinholes

NAD N/A

See Lab

Report

Entry Room 142

B-CT1-02

Tile with Fissures and

Sparse Pinholes

NAD N/A

See Lab

Report

Building 1, Room 126

B-CT1-03

2’ X 4’ White Ceiling

Tile with Fissures and

Sparse Pinholes

NAD N/A

See Lab

Report

Building 1, Corridor

Outside

Mechanical

Room 236

B-CT2-01

Tile with Small

Gouges and Pinholes

NAD N/A

See Lab

Report

Room 124

B-CT2-02

Tile with Small

Gouges and Pinholes

NAD N/A

See Lab

Report

Building 1, Corridor

Outside Room

B-CT2-03

2’ X 4’ White Ceiling

Tile with Small

Gouges and Pinholes

NAD N/A

See Lab

Report

Room 124

B-CT3-01

Tile with Fissures and

Dense Pinholes

NAD N/A

See Lab

Report

Building 1, Corridor

Outside Room

Description Asbestos

Present Friable Non-

Asbestos

Material

Present

Sample

Location

HM

B-CT3-02

2’ X 4’ White Ceiling

Tile with Fissures and

Dense Pinholes

NAD N/A

See Lab

Report

Building 1, 1 st

Floor Corridor

Outside

Women’s

Restroom

B-CT3-03

2’ X 4’ White Ceiling

Tile with Fissures and

Dense Pinholes

NAD N/A

See Lab

Report

Building 1, 2 nd

Floor Corridor

By Mechanical

Room Louvers

B-CT4-01 2’ X 2’ White Ceiling

Tile

NAD N/A

See Lab

Report

Floor Men’s

Restroom

B-CT4-02 2’ X 2’ White Ceiling

Tile

NAD N/A

See Lab

Report

B-CT4-03 2’ X 2’ White Ceiling

Tile

NAD N/A

See Lab

Report

B-CT5-01 2’ X 2’ White Ceiling

Tile with Fissures

NAD N/A

See Lab

Report

Lobby Room

B-CT5-02 2’ X 2’ White Ceiling

Tile with Fissures

NAD N/A

See Lab

Report

B-CT5-03 2’ X 2’ White Ceiling

Tile with Fissures

NAD N/A

See Lab

Report

B-DI1-01

Duct Insulation – Foil

Wrapped with Brown

Mastic

NAD N/A

See Lab

Report

Room 137

B-DI1-02

Wrapped with Brown

Mastic

NAD N/A

See Lab

Report

Floor, Telephone

Room –

Connected to

Room 137

Description Asbestos

Present Friable Non-

Asbestos

Material

Present

Sample

Location

HM

B-DI1-03

Duct Insulation – Foil

Wrapped with Brown

Mastic

NAD N/A

See Lab

Report

Floor, Telephone

Room –

Connected to

Room 137

B-DI2-01

Duct Insulation – Foil

Wrapped with Tan

Mastic

NAD N/A

See Lab

Report

Building 1, Lobby, Room

B-DI2-02

Wrapped with Tan

Mastic

NAD N/A

See Lab

Report

Building 1, Entry, Room

B-DI2-03

Duct Insulation – Foil

Wrapped with Tan

Mastic

NAD N/A

See Lab

Report

Building 1, Corridor

Outside

B-DI3-01

Duct Insulation –

Canvas Wrapped

NAD N/A

See Lab

Report

Building 1, B-DI3-02

Duct Insulation –

Canvas Wrapped

NAD N/A

See Lab

Report

Building 1, Mechanical

Room 236

B-DI3-03

Duct Insulation –

Canvas Wrapped

NAD N/A

See Lab

Report

Room

B-DWJC-01

Drywall and Joint

Compound

NAD N/A

See Lab

Report

B-DWJC-02

Drywall and Joint

Compound

NAD N/A

See Lab

Report

Building 1, Auditorium

B-DWJC-03

Drywall and Joint

Compound

NAD N/A

See Lab

Report

Description Asbestos

Present Friable Non-

Asbestos

Material

Present

Sample

Location

HM

B-FT1-01

9” X 9” Floor Tile –

White with Grey

Streaks and Associated

Mastic/Glue/Adhesive

2%

Chrysotile

(Floor Tile);

5%

Chrysotile

(Black

Mastic)

No See Lab

Report

Building 1, Entry Foyer

Room 144, Under Carpet

B-FT1-02

9” X 9” Floor Tile –

White with Grey

Streaks and Associated

Mastic/Glue/Adhesive

2%

Chrysotile

(Floor Tile);

5%

Chrysotile

(Black

Mastic)

No See Lab

Report

Building 1, Room 113

B-FT1-03

9” X 9” Floor Tile –

White with Grey

Streaks and Associated

Mastic/Glue/Adhesive

2%

Chrysotile

(Floor Tile);

5%

Chrysotile

(Black

Mastic)

No See Lab

Report

Building 1, Room 256

Offices, Under

Carpet

B-GRF-01

Grey Roof Flashing on

Equipment

10%

Chrysotile No

See Lab

Report

Roof, Center

B-GRF-02

Grey Roof Flashing on

Equipment

10%

Chrysotile No

See Lab

Report

Building 1, Roof, East End

B-GRF-03

Grey Roof Flashing on

Equipment

10%

Chrysotile No

See Lab

Report

Roof, West End

B-PI1-01

Pipe Insulation –

Canvas Wrapped with

Foamglass/Fiberglass

NAD N/A

See Lab

Report

Building 1, Room 126, HW

Line

B-PI1-02

Pipe Insulation –

Canvas Wrapped with

Foamglass/Fiberglass

10%

Chrysotile

(Black

Mastic

Layer)

No See Lab

Report

Building 1, Mechanical

Room 236

B-PI1-03

Pipe Insulation –

Canvas Wrapped with

Foamglass/Fiberglass

NAD N/A

See Lab

Report

Room 127

Description Asbestos

Present Friable Non-

Asbestos

Material

Present

Sample

Location

HM

B-PI2-01

Pipe Insulation – Paper

Wrapped with

Fiberglass

NAD N/A

See Lab

Report

Building 1, Corridor

Outside Room

B-PI2-02

Pipe Insulation – Paper

Wrapped with

Fiberglass

NAD N/A

See Lab

Report

Building 1, Mechanical

Room 236

B-PI2-03

Pipe Insulation – Paper

Wrapped with

Fiberglass

NAD N/A

See Lab

Report

Room

B-RWS-01

Roof Penetration

Sealant - White

NAD N/A

See Lab

Report

B-RWS-02

Roof Penetration

Sealant - White

NAD N/A

See Lab

Report

Building 1, Roof, East End

B-RWS-03

Roof Penetration

Sealant - White

NAD N/A

See Lab

Report

B-S-01 Roof Shingles – On

Exhaust Equipment

NAD N/A

See Lab

Report

B-S-02 Roof Shingles – On

Exhaust Equipment

NAD N/A

See Lab

Report

Building 1, Roof, East End

B-S-03 Roof Shingles – On

Exhaust Equipment

NAD N/A

See Lab

Report

NAD – No Asbestos Detected; N/A – Not Applicable

Representative Photographs of Suspect Asbestos Containing

Materials

1. BATT Insulation (HM #1)

2. Built Up Roof with Stones (HM #2)

3. Black Covebase and Associated Mastic/Glue/Adhesive (HM #3)

4. Grey Covebase and Associated Mastic/Glue/Adhesive (HM #4)

5. 2’ X 4’ White Ceiling Tile with Fissures and Sparse Pinholes (HM #5)

6. 2’ X 4’ White Ceiling Tile with Small Gouges and Pinholes (HM #6)

7. 2’ X 4’ White Ceiling Tile with Fissures and Dense Pinholes (HM #7)

8. 2’ x 2’ White Ceiling Tile (HM #8)

9. 2’ X 2’ White Ceiling Tile with Fissures (HM #9)

10. Duct Insulation – Foil Wrapped with Brown Mastic (HM #10)

11. Duct Insulation – Foil Wrapped with Tan Mastic (HM #11)

12. Duct Insulation – Canvas Wrapped (HM #12)

13. Drywall and Joint Compound (HM #13)

14. 9” X 9” Floor Tile – White with Grey Streaks and Associated Mastic/Glue/Adhesives (HM

15. Grey Roof Flashing on Equipment (HM #15)

16. Pipe Insulation – Canvas Wrapped with Foamglass/Fiberglass (HM #16)

17. Pipe Insulation – Paper Wrapped with Fiberglass (HM #17)

18. Roof Penetration Sealant - White (HM #18)

19. Roof Shingles on Exhaust Equipment (HM #19)

Photograph Not Available

20. Laboratory Fume Hoods – Transite-type (Assumed Positive)

21. Perimeter Wall Panels – Transite-type (Assumed Positive)

APPENDIX B

Paint Chip Sample Summary Table Followed by Laboratory Data and Representative Photographs of Paint Chip Samples

Collection

Date

Sample

Number

Description Location Analytical

Method

Percent Lead by Weight

(wt%)

08/19/2014 B-PC-01 Blue Paint

Metal Door

Frame, Room

236 Mechanical

Room

AAS 0.281

08/19/2014 B-PC-02

Brown Paint over Blue Paint

Metal Door, Room 236

Mechanical

Room

AAS 0.255

08/19/2014 B-PC-03 Beige Paint

CMU Wall, Room 236

Mechanical

Room

AAS 0.0333

08/19/2014 B-PC-04 Blue Paint

Metal Door

Frame, Auditorium

AAS 0.202

08/19/2014 B-PC-05 Beige Paint

Concrete

Column, AAS 0.0514

BRL: Not Detected at the Reporting Limit

Representative Photographs of Paint Chip Samples

1. Blue Paint on Metal Door Frame, Room 236 Mechanical Room (Sample # B-PC-01)

2. Brown Paint over Blue Paint on Metal Door, Room 236 Mechanical Room (Sample # B-

PC-02)

3. Beige Paint on CMU Walls, Room 236 Mechanical Room (Sample # B-PC-03)

4. Blue Paint on Metal Door Frame, Auditorium (Sample # B-PC-04)

5. Beige Paint on Concrete Columns, Auditorium (Sample # B-PC-05)

590 Means Street NW, Suite 200 � Atlanta, GA 30318 � (404) 343-3500

ADP96D4.tmp
REPLACE HVAC SYSTEM BUILDING 1
FOR
USDA-ARS, SOUTHEASTERN FRUIT
AND TREE NUT RESEARCH STATION
BYRON, GEORGIA
Environmental Report
Final Submittal
June 24, 2015
USDA Contract Number: AG-3K15-C-11-0011