Lodging_Call_FINAL_Trailer.pdf

PDF 120 KB Posted

Attached to
Long Term Lodging BPA
Solicitation number
AG-344V-S-17-0007
Issued by

About this file

Sample Camp Trailer Site Call Submittal

View the file

Other files

File Type Posted
Lodging_Call_TEST_facility.pdf PDF
LPTA_draft_forms.pdf PDF
AG-344V-S-17-0007.pdf PDF
Lodging_Call_Final_TentYurt.pdf PDF
Past_Perf_-_Landscape_Print_form.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SAMPLE FOR EVALUATION PURPOSES ONLY

UNIT

PRICE

1.1.1 ETS-U41387, Grandby, CO 1 EA $ $

1.1.2 ETS-U41389, Susanville, CA 1 EA $ $

003 1.1.3 TEAMS-U16450, King City, CA 1 EA $ $

1.1.4 TEAMS-U16542, Lower

Lake, CA 1 EA $ $

005 1.1.5 TEAMS-U80XW1,

Shaver Lake, CA 1 EA $ $

006 1.1.6 TEAMS-U80XA1,

Mountainaire, NM 1 EA $ $

Contractors proposed solution/location:

Contractors proposed solution/location:

Contractors proposed solution/location:

Contractors proposed solution/location:

Contractors proposed solution/location:

Contractors proposed solution/location:

Total Price

SECTION B-- SERVICES AND PRICES/COSTS SCHEDULE OF ITEMS

FY17 Bulk Trailer Lodging

ITEM NO. SUPPLIES/SERVICES QTY UNIT AMOUNT

RESERVED

PERFORMANCE WORK

STATEMENT FOR

FY17 BULK TRAILER LODGING

1. DESCRIPTION OF SERVICES

1.1 This Performance Work Statement (PWS) is to provide Trailer accommodations (BPA 2.2.2) for forest service field personnel. Facilities shall be located within a 20-mile radius of the following locations.

1.1.1 ETS-U41387, Grandby, CO

1.1.1.1 May 14 through October 14, 2017

1.1.1.2 Trailer Length: 26 ft + Vehicle

1.1.1.3 Water, Electric and Sewer

1.1.2 ETS-U41389, Susanville, CA

1.1.2.1 May 14 through October 14, 2017

1.1.2.2 Trailer Length: 26 ft + Vehicle

1.1.2.3 Water, Electric and Sewer

1.1.3 TEAMS-U16450, King City, CA

1.1.3.1 March through May, 2017

1.1.3.2 Trailer Length: 28 ft + Vehicle

1.1.3.3 Water, Electric and Sewer

1.1.4 TEAMS-U16542, Lower Lake, CA

1.1.4.1 May and June 2017

1.1.4.2 Trailer Length: 26 ft + Vehicle _

1.1.4.3 Water, Electric and Sewer

1.1.5 TEAMS-U80XW1, Shaver Lake, CA

1.1.5.1 June and July 2017

1.1.5.2 Trailer Length: 27 ft + Vehicle

1.1.5.3 Water, Electric and Sewer

1.2 RESPONSIBILITIES

1.2.1 2 weeks prior to the start of the project, a list will be provided to the successful contractor, which indicates each member's name and the number of nights stay. It is the responsibility of the contractor to check each person against that list to determine eligibility prior to check-in.

1.3.1 No less than two (2) weeks prior to the start of the project, Government personnel will contact the contractor and provide their individual Travel Card information to confirm. Payment for the lodging will be between the contractor and the individual cardholder(s). The contractor must notify the designated Contracting Officer Representative (COR) of any personnel that did not occupy as well as the list of individuals using the contracted quarters.

1.3.2 Problems encountered by the contractor should be immediately brought to the attention of the designated COR. Only the Contracting Officer can authorize modifications to this call/order.

1.4 SERVICES OUTSIDE THIS CONTRACT

1.4.1. Any additional arrangements required by the occupant(s) such as telephone calls and room services outside the scope of services identified in this SOW, will be between the individual and the owner.

The individual must pay any taxes applicable to such arrangements. The Government is tax-exempt.

1.4.2. The Government shall not be held financially responsible for damages to contractor facilities.

The responsibility shall rest with the individual occupying the facility and should be resolved to the satisfaction of both parties prior to the individuals' departure.

2. SERVICE DELIVERY SUMMARY (SDS)

Performance Objective Performance Threshold If applicable, facility is compliant with the Hotel and Motel Fire Safety Act of 1990 (public Law 101-391).

(Para. 1.1)

Annual visit to facility ensures compliance with PL 101-391 has been met.

The contractors' property shall present a well-maintained appearance. (BPA Section 2.)

The contractors ' property and rooms shall meet or exceed cleanliness and decor. The contents of each room shall not be at the end of its life cycle, showing worn or shabby appearance.

Guests are satisfied with the accommodations (BPA Section 2.)

The contractors' facilities meet or exceed the stated contract requirements.

3. DATES OF SERVICE

3.1. The dates authorized to stay are referenced in section 1 of this order. Dates are subject to change and will be coordinated in the event a change is required.

4. QUANTITY OF SERVICE

4.1. Space must be guaranteed until Noon, EST 5 days prior to the scheduled use. Any space not utilized will be released back to the contractor for general sales.

1. DESCRIPTION OF SERVICES
1.4 SERVICES OUTSIDE THIS CONTRACT
Test Camping Schedule.pdf
Sheet1

File details come from the government source that posted it. Updated .