Trout_Pond_Bathhouse_Specs_final.pdf
PDF 624 KB Posted
- Attached to
- Site Improvements, Trout Pond Recreation Area Federal contract opportunity
- Solicitation number
- AG-3395-S-15-0014
About this file
Trout Pond Bath House Replacement Specifications
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Trout_Pond_SHT3_Water_Tank.pdf | ||
| Trout_Pond_SHT_1-Site_Plan.pdf | ||
| Amendment_2.pdf | ||
| Amendment_1.pdf | ||
| Trout_Pond_Water_System_Pics1.docx | DOCX document | |
| AlarmHornLightCS_AV1-LED_0713.pdf | ||
| Trour_Pond_3_Panel_Info_Board.pdf | ||
| Sign_in_Sheets.pdf | ||
| SF1442_Revised.pdf | ||
| BathhousePlans.pdf | ||
| Submittal_Copy.pdf | ||
| TroutPondWaterSystemSpecsFinal_(2).pdf | ||
| OF-17 _bid_sticker.pdf | ||
| TroutPondFinalContractDrawings12-14-ALL_SHEETS.pdf | ||
| SF_24 _Bid_Bond.pdf | ||
| AG3395S150014.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIFICATIONS
TROUT POND RECREATION AREA
RENOVATION
BATH HOUSE REPLACEMENT
GEORGE WASHINGTON AND JEFFERSON NATIONAL FORESTS
LEE RANGER DISTRICT
April 2015
TABLE OF CONTENTS
SECTION 01 1000 – SUMMARY
01 1113 - WORK COVERED BY CONTRACT DOCUMENTS
01 1400 - WORK RESTRICTIONS
SECTION 01 3000 - ADMINISTRATIVE REQUIREMENTS
01 3300 - SUBMITTAL PROCEDURES
SECTION 01 4000 - QUALITY REQUIREMENTS
01 4500 - QUALITY CONTROL
SECTION 10 5000 - TEMPORARY FACILITIES
01 5200 - CONSTRUCTION FACILITIES
01 5500 - VEHICULAR ACCESS AND PARKING
SECTION 01 6000 - PRODUCT REQUIREMENTS
01 6100 - COMMON PRODUCT REQUIREMENTS
01 6200 - PRODUCT OPTIONS
SECTION 01 7000 - EXECUTION AND CLOSEOUT REQUIREMENTS
01 7100 - EXAMINATION AND PREPARATION
01 7400 - CLEANING AND WASTE MANAGEMENT
01 7700 - CLOSEOUT PROCEDURES
01 7800 - CLOSEOUT SUBMITTALS
SECTION 02 4000 – DEMOLITION AND STRUCTURE MOVING
02 4100 - DEMOLITION
SECTION 03 1000 - FORMING AND ACCESSORIES
03 1100 - CONCRETE FORMING
SECTION 03 2000 - CONCRETE REINFORCEMENT
03 2100 - REINFORCEMENT BARS
SECTION 03 3000 - CAST IN PLACE CONCRETE
03 3100 - STRUCTURAL CONCRETE
SECTION 13 4000 - INTEGRATED CONSTRUCTION
13 4200 - FOUNTAINS
13 4300 - BUILDING MODULES
SECTION 22 0000 - GENERAL
22 0800 - COMMISSIONING OF PLUMBING
SECTION 22 1000 - PIPING
22 1300 - FACILITY SANITARY SEWERAGE
SECTION 26 0000 - GENERAL
26 0500 - COMMON WORK RESULTS FOR ELECTRICAL
SECTION 26 2000 - LOW VOLTAGE ELECTRICAL TRANSMISSION
26 2100 - LOW VOLTAGE ELECTRICAL SERVICE ENTRANCE
SECTION 31 1000 - SITE CLEARING
31 1100 - CLEARING AND GRUBBING
31 1400 - EARTH STRIPPING AND STOCKPILING
SECTION 31 2000 - EARTH MOVING
31 2300 - EXCAVATION AND FILL
SECTION 31 9000 - PLANTINGS
32 9200 - TURF AND GRASSES
SECTION 33 0000 – UTILITIES (GENERAL)
33 0800 - COMMISSIONING OF UTILITIES
SECTION 33 1000 - WATER UTILITIES
33 1200 - WATER UTILITY DISTRIBUTION EQUIPMENT
33 1300 - DISINFECTING OF WATER UTILITY DISTRIBUTION
DIVISION 01
GENERAL REQUIREMENTS
SECTION 01 1000 – SUMMARY
01 1113 - WORK COVERED BY CONTRACT DOCUMENTS
1113.1 Project Description
This project will demolish and replace the existing Trout Pond Recreation Campground bath house building with a new CXT Taos style toilet building.
The contractor shall provide all labor, equipment, and materials to accomplish all work as shown on the drawings and/or specified herein.
The work includes:
1. Demolition and removal of existing toilet/shower building, concrete slab/walks, footers, and portions of below grade utility lines, and associated appurtenances as shown on the drawings.
2. Site Preparation.
A. Includes excavation and/or fill, tree removal, object removal and replacement, and all work needed to prepare the access route from the camp entrance to the site for delivery of the buildings by low-boy trailer (~ 4 inch ground clearance). Site access requirements include vertical clearance of 14’-6” and horizontal clearance of
14’-0”, with additional allowance for turns along the access route clear of obstructions.
B. Includes preparation of the access, ground pad and travel arcs for the crane to unload the building sections from the trailers and place them on the aggregate base. The building location must be accessible and support the movement and parking of the crane and tractor trailer to within two feet and on two adjacent sides (one for crane, one for trailer) of the building pad for unloading the building.
C. Includes excavation and/or fill as needed to obtain required subgrades and achieve correct final building floor finish elevation as shown on the drawings.
D. Includes construction of an aggregate pad as indicated on the drawings.
E. Includes construction of two outdoor shower stations as indicated on the drawings.
F. Includes installation and connection of new water, sewer, and electric cutover lines from 12” above the top of the pad at the building site to the existing utilities, valves, appurtenances, and electric service equipment as shown on the drawings.
3. Delivery and Placement Coordination. Contractor shall provide one prefabricated concrete toilet/shower Taos building.
Contractor shall coordinate delivery and setup with building Supplier (CXT Precast Products, Inc.). Delivery coordination includes all work as necessary in concert with the building Supplier to deliver and place the building on site, including but not limited to the following:
A. Coordination includes verification with Supplier that the site preparation is adequate for building delivery and placement by the Supplier prior to delivery.
B. Contractor shall verify that the Supplier’s trucks and crane can access positions adjacent to the building aggregate base with adequate firmness, grade and clearance within the crane’s rated weight capacity and reach to place the building. Contractor shall make any required additional adjustments for access, clearance and support as needed once trucks and crane arrive on site.
C. Contractor shall coordinate with Supplier if transfer of buildings from highway legal trailers to short trailers is required, use of alternate cabs or use of a larger than normal crane or multiple cranes is advantageous compared to the required level of site preparation to bring highway trailers into the campground and include any such arrangements and costs within the scope of site preparation and delivery coordination.
4. Setup. Setup includes connection and hookup of water, sewer, and electric utilities from 12” above the top of the pad to the building and any incidental work as necessary to place the building into commission for its intended purpose.
5. Construct new concrete sidewalks as indicated on the drawings.
6. Provide and install outdoor shower stations, including all utility cutovers and drainage systems, as indicated on the drawings.
7. Installation and hook-up of new gravity sewer lines as shown on the drawings.
8. Connect building to any additional outlying utility lines as shown on drawings.
9. Final site clean-up and landscape restoration including restoring/adding topsoil, seeding, fertilizing and mulching of all areas disturbed by construction, and incidental related work including but not limited to replacement of signs, gates or landscaping materials temporarily removed for access or construction. .
1113.2 Schedule Requirements
The work under this contract requires special attention to the scheduling and conduct of the work in connection with seasonal public camping.
Notice to Proceed will be issued after July 6, 2015. Work shall stop for Labor Day weekend, September 4-7, 2015. Recreation Area will close to the public on September 15, 2015.
1113.3 Project Location
The work shall be located at the Lee Ranger District, Trout Pond Recreational Campground, Lost River, VA, approximately as indicated.
01 1400 - WORK RESTRICTIONS
01 1416 COORDINATION WITH OCCUPANTS
1416.1 Occupancy of Premises
The project site is located within a gated recreation area, which will be open to the public.
1416.2 General Coordination
Contractor shall identify any activity that interrupts roads, parking lots, utilities, or otherwise negatively affects occupants, users or the public and coordinate the interruption of these services with the Contracting Officer to minimize the impact.
Maintain the project work on the schedule provided to the Contracting Officer. Immediately communicate and coordinate with the
Contracting Officer schedule changes based on unforeseeable material, equipment or personnel problems once known to prevent or minimize unscheduled disruption of Forest Service personnel or public use of facilities.
1419.1 Government Facilities
Power – 120 VAC power is available on site at the disconnect panel. The Contractor will be required to perform connections and proved all necessary outlet boxes and extension cords.
Water – Potable water is available on site, with the possible exception of concurrent water system upgrade.
Toilet Facilities – Toilet facilities are available within the campground, with the possible exception of the concurrent water system upgrade, which would require the use of porta-johns.
1419.2 Contractor Responsibility to Protect Property and the Public
Barriers shall be erected around all open excavations. Flaggers shall be used at any time public vehicular traffic is at risk of collision with building or equipment movements. Particular care shall be exercised on narrow roads near the recreation site where sight lines are restricted by curves, hills and vegetation.
SECTION 01 3000 - ADMINISTRATIVE REQUIREMENTS
01 3300 - SUBMITTAL PROCEDURES
3301 PROCEDURES
3301.1 Government Approving Authority
The only approving authority for submittals requiring government approval is the Contracting Officer or the designated Contracting
Officer Representative (COR) as delegated in writing by the Contracting Officer.
3301.2 Number of Copies of Submittals
a. Documents for Review: Submit three copies, two will be retained by the COR and one will be returned to the Contractor after review with a review marking indicating the submittal is rejected, approved with comments or approved. Submittals may also be in electronic format.
b. Samples: Submit two samples for each item specified unless otherwise indicated in the individual specification section;
one of which will be retained by COR unless indicated otherwise.
c. Send all submittals to project COR.
3323 SHOP DRAWINGS, PRODUCT DATA AND SAMPLES
3323.2 Shop Drawings
Provide for approval shop drawings of all shop or field fabricated components and assemblies and construction details of all built in place items prior to ordering materials, fabrication, assembly or construction including, but not limited to the following items:
a. None
3323.3 Manufacturer’s Product Data Sheets and Product Samples
Provide for approval Manufacturer’s Product Data Sheets for all major materials used including, but not limited to the following items:
a. CXT building
b. Shower fixtures and fittings
c. Piping, fittings, and valves
d. Electrical enclosures, breakers or switches
Provide for approval Product Samples of the following items:
Materials requiring approval of product data sheets or samples shall not be ordered in quantity until the required submittals are returned marked “approved”, “accepted”, “approved as noted” or “approved except as noted, re-submittal not required” by the
Contracting Officer.
SECTION 01 4000 - QUALITY REQUIREMENTS
01 4500 - QUALITY CONTROL
4516 FIELD QUALITY CONTROL PROCEDURES
4516.1 Dimensions, Layout and Fit
Any site drawings or dimensions provided by the government are for general reference only and are not guaranteed accurate for existing (as-built) conditions, estimating or construction.
Provide final as-built mark-ups of contract drawings if any deviations are required. Obtain COR approval before making any deviations from contract drawings. These drawings shall be maintained in a current condition and shall be available for review. All variations from contract drawings shall be indicated in red on the drawings. Upon completion of the contract work, as-built drawings shall be submitted to the COR.
4516.2 Manufacturer’s Instructions
Install materials and equipment in accordance with manufacturer’s instructions and recommendations.
4516.3 Codes and Standards
All work and materials shall be in full accordance with the latest requirements of the International Building Code, Uniform Building
Code, Uniform Mechanical Code, National Electrical Code, National Plumbing Code, National Fire Protection Association and other applicable state and local codes and regulations.
4516.4 Adjusting and Testing
All equipment furnished under this contract shall be tested and adjusted as necessary for proper operation on site by the contractor or a manufacturer’s representative. All equipment shall be demonstrated to the government for proper operation on site by the contractor prior to final acceptance.
SECTION 10 5000 - TEMPORARY FACILITIES
01 5200 - CONSTRUCTION FACILITIES
5213 FIELD OFFICES AND SHEDS
5213.1 Contractor Storage Trailer Parking
Contractor shall be allowed a designated area to park and store equipment. The contractor shall be allowed to store materials at the project site in Contractor provided equipment (temporary trailer) only. Coordinate the location of the storage area with the COR.
The Contractor is required to provide weather protected and secure storage for all materials and supplies. The Contractor shall be solely responsible for the loss of or damage to materials stored at the job site. Store and protect products in accordance with manufacturers' instructions.
Materials shall not be stored in government buildings.
01 5500 - VEHICULAR ACCESS AND PARKING
5519 TEMPORARY PARKING
5519.1 Contractor Parking
Contractor shall be allowed a designated area to park vehicles and store equipment. Coordinate the location of the parking area with the COR.
Contractor shall not temporarily park vehicles or equipment in such a manner as to impede or restrict access roads or driveways.
Contractor shall not temporarily park vehicles or equipment in parking lots designated for USFS employees except as designated by the COR.
SECTION 01 6000 - PRODUCT REQUIREMENTS
01 6100 - COMMON PRODUCT REQUIREMENTS
Do not use products containing the following materials:
a. Asbestos
b. Urea Formaldehyde
c. Polychlorinated Biphenyls (PCBs)
d. Chlorinated Fluorocarbons (CFCs)
e. RCRA 8 Heavy Metals exceeding EPA concentration limits for hazardous waste:
Arsenic 5.0 ppm (mg/L)
Barium 100.0 ppm (mg/L)
Cadmium 1.0 ppm (mg/L)
Chromium 5.0 ppm (mg/L)
Lead 5.0 ppm (mg/L)
Mercury 0.2 ppm (mg/L)
Selenium 1.0 ppm (mg/L)
Silver 5.0 ppm (mg/L)
Do not use wood products having any of the following characteristics:
a. Old growth timber
b. Particle or chip board
01 6200 - PRODUCT OPTIONS
For products specified by reference standards or description only use any product meeting those standards or description. Products in this category include, but are not limited to:
a. Water system piping – HDPE Class 200
b. Sewer, Waste and Drain piping – PVC Schedule 40
c. Valve Boxes – ASTM A48-33 Cast Gray Iron or ASTMA536-80 Cast Ductile Iron
d. General Wiring – minimum 12 AWG size, copper wire only, SE or THWN as appropriate
e. Conduit –Intermediate Metallic Conduit (IMC) or Rigid Non-Metallic Conduit (RNMC or RPVC) Schedule 80 only shall be used exterior to the building. EMT, ENT or Schedule 40 PVC shall not be used.
For products specified by naming one or more manufacturers with a provision for substitutions submit a request and product data for substitution for any manufacturer not named. The COR may request a sample of a substitute material for the limited purpose of assessing conformance with information given and the design concept expressed in the contract documents. All substitutions are subject to COR approval before incorporation into the project. Substitutions made without COR approval will prevent final project acceptance. Products in this category include, but are not limited to:
a. Shower Units shall be Most Dependable Fountain Co. Model 565 SMSS ADA Shower. The shower unit shall be made of
Stainless steel (not painted carbon steel) and include the optional Stainless Steel Surface carrier.
b. Shut-off valves and curb stops shall be Ford Valve Company, with a 90 degree turn motion and shall be mounted in a valve box. Couplings and saddles shall be Ford Valve Company.
c. Septic tank manhole lids and frames shall be ferrous castings by Neenah Foundry Company
d. Surge Arrestor shall be Square D QO2175SB (for QO panel), HOM2175SB (for Homeline load centers) or SDSA1175 (all other panels) as applicable.
For products specified by naming one or more manufacturers without including a provision for substitutions use a product of one of the manufacturers named and meeting specifications, no options or substitutions allowed. Products in this category include, but are not limited to:
SECTION 01 7000 - EXECUTION AND CLOSEOUT REQUIREMENTS
01 7100 - EXAMINATION AND PREPARATION
7123 FIELD ENGINEERING
7123.1 Field Investigation and Utility Staking
Perform a careful field investigation of the site prior to commencing work. Drawings provided by the government are for general information only. Drawings may reflect design intentions rather than as built conditions or may not indicate site alterations or details relevant to the current project. Contractor shall independently verify all locations and dimensions indicated.
All utility line locations shown on drawings are approximate. Contractor shall be responsible for determining the actual locations of all underground utility lines. The Contractor shall stake all utility line locations. Staking shall be by wire flagging, chalk line, or wood staking.
01 7400 - CLEANING AND WASTE MANAGEMENT
7413 PROGRESS CLEANING
Maintain site in a clean and orderly condition. The Contractor shall clean-up the work area at the end of each day’s activities to keep work site free of accumulated or distributed waste materials, debris, and trash/rubbish.
7419 WASTE MANAGEMENT AND DISPOSAL
7419.1 Waste Management
Project waste includes all demolition and construction materials not used in the final work product, packaging wastes and Contractor administrative/personnel generated wastes.
Collect and remove waste materials, debris, and trash/rubbish from site as needed, or as directed by the project Inspector and/or COR, and dispose off-site in a legal manner; do not burn or bury.
Project waste shall not be mingled with the campgrounds normal waste stream, but shall be stored separately and removed from the site by the Contractor. Hazardous wastes shall be segregated from non-hazardous wastes, stored in accordance with federal, state and local laws and promptly removed from the site for disposal by the Contractor. The Contractor’s senior on-site representative shall be particularly vigilant to ensure that adhesives, stains, solvents paints or other hazardous wastes and associated contaminated cleaning cloth/paper products are not disposed of in the government office trash receptacles, sinks or toilet facilities.
7423 FINAL CLEANING
7743.1 Site Clean-Up
Perform a final site clean-up:
a. Clean the building interior prior to final inspection.
b. Remove all remaining construction debris, paints, solvents, tools and trash from the work site.
c. Walk the grounds near the work site to ensure all nails, screws, blades or other items are not left in the grass (mowing hazard) or in vehicle access and parking areas (tire puncture hazard).
01 7700 - CLOSEOUT PROCEDURES
7713 PRELIMINARY CLOSEOUT REVIEWS
7713.2 Substantial Completion Pre-Inspection
Notify COR when work is considered substantially complete. At that time the COR will arrange an inspection of the project and generate an Inspection Report (FSM 6320) listing any remaining work or workmanship deficiency items requiring correction for project completion and acceptance.
7716 FINAL CLOSEOUT REVIEW
7716.1 Final Inspection
Once the project work is 100% complete, the incomplete and workmanship deficiency items from any Substantial Completion Pre-
Inspection performed are corrected and the Site Clean-up is completed, contact the COR to arrange a final inspection.
7719 CLOSEOUT REQUIREMENTS
7719.1 Certificate of Final Inspection
The COR will issue a Certificate of Final Inspection (FS 6300-15) once all items from the final inspection are resolved.
01 7800 - CLOSEOUT SUBMITTALS
7823 OPERATION AND MAINTENANCE DATA
Provide three copies of one or more binders with all manufacturer operation and maintenance instructions assembled as an O&M manual. Include all manufacturer product data for purchased components and manufactured assemblies. Include any manufacturer recommended spare parts lists or exploded view drawings indicating replacement part numbers.
One copy shall be retained at the site, one copy shall be retained at the district office and one copy shall be retained at the supervisor’s office.
7839 CLOSEOUT DOCUMENTS
Submit the following documentation at project closeout:
a. Project record documents
b. Material descriptions and maintenance requirements for the materials installed
c. Warranties
d. Contractor Release Certificate
DIVISION 02
EXISTING CONDITIONS
SECTION 02 4000 – DEMOLITION AND STRUCTURE MOVING
02 4100 - DEMOLITION
4116 STRUCTURE DEMOLITION
4116.13 Building Demolition
PART 1 – GENERAL
A. The work required under this section shall include removal of all existing building materials, concrete slabs/walks, footers, below grade utility lines, below grade septic tanks/manholes, fence screens, and any other miscellaneous materials pertaining to the existing building from government property. Material shall be taken to the local landfill and not burned or buried on site. Fence posts and rails shall be sorted as serviceable or not and the serviceable posts and rails may be reused in making the new post and rail fencing.
B. All wood fencing, signs, designated electric panel boxes, and wall mounted telephones that may be damaged or disturbed during construction shall be removed until completion of the project and reinstalled as directed by the COR.
C. Forest Service MAY remove some urinals, toilets, sinks, valves, heaters, and other miscellaneous items from buildings before demolition.
DIVISION 03
CONCRETE
SECTION 03 1000 - FORMING AND ACCESSORIES
03 1100 - CONCRETE FORMING
1113 - STRUCTURAL CONCRETE CAST IN PLACE FORMING
PART 1 - GENERAL
A. The work required under this section consists of furnishing and installing all formwork, expansion joints, and related accessories for concrete work as shown on the drawings and/or specified herein.
PART 2 - PRODUCTS
A. Forms shall be wood, plywood, hardboard, or metal and shall be approved by COR.
B. Form oil shall be non-staining type.
C. Expansion joint filler shall be pre-molded or pre-shaped type made of asphalt fiber.
PART 3 - EXECUTION
A. Forms shall be built tight, in proper alignment, and adequate to resist the stresses of concrete placement without deformation.
B. Forms shall be constructed to produce the required concrete surface.
C. Contractor shall form the top concrete floor/apron as a minimum.
SECTION 03 2000 - CONCRETE REINFORCEMENT
03 2100 - REINFORCEMENT BARS
2111 - PLAIN STEEL REINFORCEMENT BARS
A. The work required under this section consists of furnishing and installing all concrete reinforcement as shown on the drawings and/or as specified herein.
B. All work shall be in accordance with the latest editions of ACI 301, ASTM A615, and ASTM A185.
A. Reinforcing steel shall be intermediate grade 40, unless otherwise shown.
B. Reinforcing wire shall be gauge and spacing indicated.
A. Reinforcement bars and W.W.F. shall confirm to the sizes and spacings as shown.
B. Field bending and cutting will be permitted if performed in accordance with above listed code.
C. Reinforcement shall be free from dirt, oil, paint, grease, mill scale, and loose or thick rust when concrete is placed.
D. Welded wire fabric shall be hooked and/or supported during the placement of concrete slabs to insure proper embedment as detailed.
E. Anchorage and accessories shall be accurately placed as shown and held rigidly in position during placing of concrete.
F. Depth of cover, radius of bend, and deformations shall be in accordance with ACI-381-20 (2" cover, 6" diameter).
SECTION 03 3000 - CAST IN PLACE CONCRETE
03 3100 - STRUCTURAL CONCRETE
3113 HEAVYWEIGHT STRUCTURAL CONCRETE
A. The work required under this section consists of furnishing and installing all cast-in-place concrete, including curing and finishing of concrete as shown on the drawings and/or as specified herein.
B. All work shall be in accordance with the latest editions of ACI 301, ACI 305 and ACI 306.
A. Aggregate shall conform to the requirements of ASTM C-33, and shall be graded from fine to coarse within designated limits. Coarse aggregate size #467.
B. Portland Cement shall comply with ASTM C150, Type 1. Supplier shall provide mill certification of compliance with specification.
C. Water shall be clean, fresh, and free from injurious amounts of minerals or foreign substances.
D. Additives, air entrainment agents shall comply with ASTM C-260.
E. Concrete sealer shall be Professional Water Sealant or equal as manufactured by Sein
Chemicals, Inc., F. Concrete Mix Design
1. All concrete shall have a minimum "compressive strength" of 3000 psi at 28 days.
2. Concrete shall be air-entrained and shall contain not less than 3% and not more than 6% entrained air determined by test procedure ASTM C-231. Chace Air
Indicator (AASHTO T199) is not acceptable as a substitute for the above test.
3. The design of the concrete mixture shall be the responsibility of the contractor.
A. "Ready-Mixed Concrete" may be employed if the time interval between mixing at the plant and discharge into the form does not exceed 1-1/2 hours.
B. All concrete shall be placed within 1-1/2 hours from the time of mixing.
1. No concrete shall be placed after it has started its initial set.
2. No concrete with a temperature above 90 degrees shall be placed.
C. Concrete shall be placed in such a manner as to avoid segregation of the mixture.
1. Concrete shall be spread in horizontal layers when practicable.
2. No concrete shall be freely dropped more than 5 feet.
3. Depositing a large quantity of concrete and flowing or working it along the forms will not be permitted.
D. Mechanical vibrators shall be used for consolidation of concrete.
1. Concrete shall be consolidated within 15 minutes after placement.
2. If consolidation of concrete with mechanical vibrators is impractical, hand tamping, rodding, and spading will be permitted.
3. A minimum of two vibrators, in working order, shall be on the job during concrete placement.
E. Concrete shall be placed and protected as specified for temperature conditions.
F. Concrete plant standards and tuck mixer and agitator standards shall be as recommended by the National Ready Mix
Association.
G. Finishing
1. All finishes shall be made without use of cement or other dusting materials.
2. Concrete shall be struck to proper grade and finished as shown on drawings.
3. At all exposed formed surfaces, remove all ties, fill all form tie holes and imperfections, i.e., "honeycombing," with dry cement mortar, remove all lines, and then "sack" or finish to match adjacent surfaces.
4. Apply waterproofing sealant in strict accordance with the manufacturer's recommendations.
H. Concrete shall be protected against rapid drying and kept moist for seven days by covering with curing paper with edges sealed, burlap, canvas, or be sprinkling. Waterproofing sealant may be used as curing compound when recommended by the manufacturer.
DIVISION 13
SPECIAL CONSTRUCTION
SECTION 13 4000 - INTEGRATED CONSTRUCTION
13 4200 - FOUNTAINS
4213 EXTERIOR FOUNTAINS (SHOWER STATIONS)
A. The work required under this section consists of installing MDF Model 565 SMSS Shower Stations as shown on the drawings and/or as specified herein.
B. All plumbing connections shall be made by licensed plumbers in accordance with the manufacturer’s instructions.
PART 2 – PRODUCTS
A. Shower Units shall be Most Dependable Fountain Co. Model 565 SMSS ADA Shower. The shower unit shall be
Stainless steel (not painted carbon steel) and include the optional Stainless Steel Surface carrier.
PART 3 – EXECUTION
A. Excavation for bedding and leveling course material beneath the shower stations shall be as shown on the drawings.
B. Compact natural ground at bottom of excavation with a minimum of three passes of approved wacker-type mechanical tamper.
C. Compact bedding and leveling course material beneath the shower stations with a minimum of two passes of approved wacker-type mechanical tamper.
D. Compacted bedding and leveling course material beneath the shower stations shall be six inches thick. Shower station pad and basin shall be 5 five inches thick air entrained 3000 psi concrete with welded wire mesh embedded and a stiff broom finish. Basin shall slope ¼ inch per foot toward a five inch drain basin.
E. Shower station locations shall be as indicated on the drawings and staked by the COR. One shower station shall drain to a daylight drain and one shower station shall drain to the building sewage system as indicated on the drawings. Water supply piping shall be 1 inch HDPE Class 200 with fittings to mate to the shower units ½" MIP connection.
F. Install shower station on the Stainless steel surface carrier per manufacturer's instructions.
13 4300 - BUILDING MODULES
13 4313 BATHROOM UNIT MODULES
A. Contractor to furnish and install a precast concrete transportable building. Building to be delivered to job site and installed by the Contractor in accordance with manufacturer’s recommendations. Precast building is to be a Taos Model as manufactured by CXT Inc. Building to be provided by manufacturer with all necessary openings as specified by contractor in conformance with manufacturer’s structural requirements.
B. The work required under this section consists of providing the prefabricated concrete flush toilet building as shown on the drawings and/or as specified herein.
C. Contractor shall coordinate with the building manufacturer for the delivery, placement, and installation of the building.
D. All plumbing and electrical connections shall be made by licensed plumbers and electricians in accordance with building manufacturer’s instructions.
E. Provide Material Data Safety Sheets of all chemicals (including paints, caulks and adhesives) used. Post one copy on site for each chemical stored on site.
PART 2 – PRODUCTS
A. Bedding and leveling course material beneath the building and concrete walks shall be graded 21A crushed or screened aggregate.
A. Excavation for bedding and leveling course material beneath the building and concrete walks shall be as shown on the drawings.
B. Compact natural ground at bottom of excavation with a minimum of three passes of approved wacker-type mechanical tamper.
C. Compact bedding and leveling course material beneath the building and concrete walks with a minimum of two passes of approved wacker-type mechanical tamper.
D. Compacted bedding and leveling course material beneath the building and concrete walks shall be a minimum of six inches thick. Building floor is five inches thick. Concrete walks shall be five inches thick.
E. Building walls, floors, and roof shall be cleaned by brushing with soap and water.
PART 4 - QUALITY ASSURANCE
A. ACI-318-02, “Building Code Requirements for Reinforced Concrete”.
B. ANSI/ASCE-7-02 “Building Code Requirement for Minimum Design Loads in Buildings and Other Structures”.
C. International Building Code (2012 Edition).
D. Concrete Reinforcing Institute, “Manual of Standard Practice”.
E. Building fabricator must have a minimum of 5 years’ experience manufacturing and setting transportable Precast concrete buildings.
F. No alternate building designs to the pre-engineered CXT building will be allowed unless pre-approved by the owner 10 days prior to the bid date.
PART 5 - SUBMITTALS
A. Submit for approval: Stamped, engineered drawings showing all details and including accessories, sealed by a professional engineer, licensed to practice in the state where the project is located.
B. Submit building manufacturer’s installation and maintenance instructions.
C. Submit manufacturer’s information sheets, specifications and maintenance data for all accessories.
D. Submit color samples for CORs selection of colors.
PART 6 – PRODUCTS
MATERIALS
A. Concrete: Per manufacturer specifications
B. Reinforcing Steel: Per manufacturer specifications
C. Caulking: Joints between walls and roof shall be caulked on the exterior and interior surface. Interior joints shall be called with a paintable silicone based caulk. Exterior joints shall be caulked with a tripolylmer sealant caulk which compliments the exterior color.
ACCESSORIES
A. Doors and Frames: Shall comply with Steel Door Institute “Recommended Specifications for Standard Steel Doors and
Frames” (SDI-100), and as herein specified. Doors and frames shall be bonderized and painted one coat of rust inhibitive primer and one finish coat of enamel paint; color to be selected by owner.
B. Door Hardware:
1. Hinges: Stanley FBB191 (32D) (ANSI A5112) 4 ½” x 4 ½” (Satin Stainless Steel finish), 3 per door, or equal.
2. Lock Set: Deadlocks: Yale 8714, function F18 – deadbolt by key outside, blank inside. US32D finish, to accept
Forest Service supplied #2153 mortise cylinder.
3. Threshold: Pemko 170A (mill finish aluminum), or equal.
4. Door bottom sweep/seal: Pemko #420ASL or equal.
5. Provide 2” aluminum drip cap above door.
6. Door Opener: Pull Handle / Push Plate
C. Provide CXT accessible signage for Men and Women
D. CXT Toilet Paper Holders: 2 roll stainless steel
E. Provide CXT paper towel dispensers for each bathroom
F. Provide CXT wastebaskets for each bathroom
FINISHES
A. Interior of Building: Smooth finish on all interior surfaces with epoxy coating. Owner to select color.
B. Exterior of Building: Walls - Vertical barnwood textured finish (Nuss Brown). Roof – cedar shake textured finish (Color to be selected by owner). Exterior walls and roof will be coated with an acrylic water repellent stain, followed by a clear acrylic anti-graffiti sealer.
PART 7 – EXECUTION
SITE PREPARATION
A. Stake building location for approval before beginning construction.
B. Precast concrete building shall bear fully on a crushed stone base, dimensions and depth as specified by manufacturer.
C. The soil under the stone base shall be compacted and have minimum bearing of 1,500 pounds per square foot. Stone base shall be ¾” maximum, fully compacted and screeded to level within ¼” in both directions.
D. Provide positive drainage for the pad as required.
SITE ACCESS
A. Verify with precast building supplier that the site preparation is adequate for building delivery and placement by the
Supplier prior to delivery.
B. Verify that the Suppliers trucks and crane can access positions adjacent the building pad. Verify that there is adequate firmness and clearance within the crane’s rated weight capacity and reach to place the building. Contractor shall make any required additional adjustments for access, clearance and support as needed once trucks and crane arrive on site.
C. Contractor must provide level unobstructed area large enough for crane and tractor-trailer to park adjacent to pad.
Coordinate with Supplier if transfer of the building from highway legal trailers to short trailers, use of alternate cabs or use of a larger than normal crane or multiple cranes is advantageous compared to the required level of site preparation to bring highway trailers into the building site. Include any such arrangements and costs within the scope of this Building item.
DIVISION 22
PLUMBING
SECTION 22 0000 - GENERAL
22 0800 - COMMISSIONING OF PLUMBING
0810 COMMISSIONING OF SANITARY SEWERAGE
0810.22 Leakage Testing of Sanitary Waste and Vent Piping
A. The work required under this section consists of leakage testing as shown on the drawings and/or specified herein.
A. Gravity Sewer and DWV Pipe
1. A water test shall be applied to the system in sections. Each opening shall be tightly plugged except the highest opening of the section under test. In testing each successive section, at least the upper ten feet of the preceding section shall be retested so that all but the uppermost 10 feet of the system shall have been submitted to a test of not less than a 10 foot head of water.
2. The water level shall remain constant for no less than 30 minutes.
SECTION 22 1000 - PIPING
22 1300 - FACILITY SANITARY SEWERAGE
1316 SANITARY WASTE AND VENT PIPING
A. The work required under this section consists of furnishing and installing Waste, drain and vent piping to building and other amenities as shown on the drawings and/or specified herein.
A. Waste, drain and vent pipe shall be PVC Schedule 40.
A. Pipe Laying in Trench
1. Before the pipe is laid in the trench, the earth forming the bed shall be freed of stones, roots, etc. The pipe shall then be evenly bedded in the earth to leave a uniform support for the entire length of the pipe, except at couplings under which a recess shall be excavated to a sufficient depth to relieve it of any load and to allow ample space for making the joint. In case the bed trimmed on the bottom of the trench and tamped, and a new bed shall be trimmed for the pipe. Pipe shall not be raised by ramming earth beneath it.
2. Preparatory to making pipe joins, all surfaces of portions of the pipe and jointing material to be joined shall be clean and dry. Lubricants, primers, adhesives, etc., shall be used as recommended by the pipe and/or joint manufacturer's specifications. The joints shall be made and a watertight joint obtained.
3. When the pipe has been bedded and the joint made, the recess under the couplings shall be refilled with earth and tamped on each side of the pipe to hold it securely in place. Care shall be taken to not disturb the position of the pipe during this process.
4. Backfill shall be done in 6" layers, loose measurement, and compacted to density of adjacent natural ground.
5. Trenches shall be kept water free and dry during bedding, laying, jointing, and backfilling.
6. At the end of each work day and when left unattended, all open ends of the pipes will be covered to prevent entrance of trash or wildlife.
7. Connections will be made to the existing and/or constructed facilities according to standard plumbing practices. Any connections made between different pipe material shall be made using connectors or adaptors designed for the purpose of connecting the two types of pipe.
B. Installation shall be in accordance with manufacturer's recommendations, drawings, and as specified in other sections.
DIVISION 26
ELECTRICAL
SECTION 26 0000 - GENERAL
26 0500 - COMMON WORK RESULTS FOR ELECTRICAL
0519 LOW VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES
A. Installation shall be complete with all necessary labor and materials included to provide a fully operational electrical system.
B. All work shall be done in accordance with NFPA 70 NEC 2012.
A. Conductors shall be SE or THWN as applicable, copper, wire. The minimum wire size shall be 12 AWG.
1. Conductors shall comply in all respects with current IPCEA Standards, as applicable.
2. Grounding conductors shall be required for all circuits.
A. All work shall be done by or under the direct supervision of a licensed electrician.
B. Installation shall be in accordance with manufacturer's recommendations, drawings, and as specified in other sections herein.
0533 RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS
0533.13 Conduit for Electrical Systems
A. Installation shall be complete with all necessary labor and materials included to provide a fully operational electrical system.
B. All work shall be done in accordance with NFPA 70 NEC 2012.
A. Conduit shall be Intermediate Metallic Conduit (IMC) or Rigid Non-Metallic Conduit (RNMC or RPVC). Only
Schedule 80 RNMC or RPVC shall be used exterior to the building. Schedule 40 may be used in the interior where not subject to physical damage. EMT or ENT shall not be used. Fittings shall be screwed, compression or solvent weld type. No setscrew type fittings are allowed
A. All work shall be done by or under the direct supervision of a licensed electrician.
B. Installation shall be in accordance with manufacturer's recommendations, drawings, and as specified in other section.
SECTION 26 2000 - LOW VOLTAGE ELECTRICAL TRANSMISSION
26 2100 - LOW VOLTAGE ELECTRICAL SERVICE ENTRANCE
2116 LOW VOLTAGE UNDERGROUND ELECTRICAL SERVICE ENTRANCE
A. The work required under this section consists of furnishing and installing all necessary materials for complete underground electrical service to building as shown on the drawings and/or specified herein.
B. Contractor shall have all existing underground electric lines located prior to excavation.
C. Contractor shall provide a new electric service including needed trench excavation, conduit, identification tape, backfill, and any other labor, equipment, and materials necessary in accordance with requirements.
D. Materials furnished for inclusion in the work shall have been designed, built and tested in accordance with applicable NEMA and IEEE Standards, shall be approved and labeled by the Underwriter’s Laboratories, Inc., and shall be new.
A. Conductors shall be SE or THWN copper as applicable and sized in accordance to NFPA 70 NEC 2012.
1. Conductors shall comply in all respects with current IPCEA Standards, as applicable.
2. Grounding conductors shall be required for all circuits.
Conductors shall be encased in conduit. Conduit shall be Intermediate Metallic Conduit (IMC) or Rigid Non-
Metallic Conduit (RNMC or RPVC). Only Schedule 80 RNMC or RPVC shall be used exterior to the building. Schedule 40 may be used in the interior where not subject to physical damage. EMT or ENT shall not be used. Fittings shall be screwed, compression or solvent weld type. No setscrew type fittings are allowed
B. Service Disconnect shall be a 200 Amp Circuit breaker installed in the power distribution panel mounted on the existing service equipment mounting board.
C. Surge Arrestor shall be Square D QO2175SB (for QO panel), HOM2175SB (for Homeline load center) or
SDSA1175 (all other panels) as applicable.
D. Pull boxes shall be furnished and installed as necessary and/or as shown on the drawings.
A. Equipment specified in this section shall be installed in accordance with the manufacturer’s recommendations at the locations shown on the drawings.
B. Installation shall comply with all NFPA 70 NEC 2012 Service Entrance requirements.
C. Contractor shall provide trench excavation, conduit, identification tape, backfill, exterior electric panels as shown on the drawings, and any other labor, equipment, and materials necessary in accordance with ESP requirements.
D. All installed systems shall be tested to ascertain that they are installed properly before power is applied.
E. All noncurrent carrying metal parts of electrical equipment shall be grounded per NFPA 70 NEC 2012.
F. Initial stub up of the electrical service conduit shall be in accordance with CXT building placement requirements and not exceed 12 inches above the building placement pad. Service entrance cabling shall be pulled and connected after building placement and connection of the conduit stub with additional conduit up to the building service entrance panel
G. Install a Secondary Surge Arrestor in the Service Panel. Surge Arrestor shall be Square D QO2175SB (for QO panel), HOM2175SB (for Homeline load center) or SDSA1175 (all other panels) as applicable.
DIVISION 31
EARTHWORK METHODS
SECTION 31 1000 - SITE CLEARING
31 1100 - CLEARING AND GRUBBING
A. The work required under this section consists of clearing and grubbing as shown on the drawings and/or as specified herein.
A. Clearing and grubbing shall consist of clearing the designated area of trees, brush and other vegetation, rubbish and all objectionable material within 10 feet of the building unless flagged, and shall include grubbing stumps larger than 3" in diameter and matted roots. Additional trees needing removal for crane access and building placement shall be done at the direction of the COR.
B. Shrubs and tree slash removed for site preparation may be scattered according to the following requirements. Scatter slash outside the clearing limits without damaging trees. Limb all logs. Pull all tree stumps. Place logs and stumps away from public areas. Place logs and stumps so they will not roll, and are not on top of one another or against other trees. Limb and scatter construction slash to reduce slash concentrations and to present a natural appearance. Do not burn or bury construction slash.
31 1400 - EARTH STRIPPING AND STOCKPILING
1413 SOIL STRIPPING AND STOCKPILING
1413.13 Topsoil Stripping and Stockpiling
A. The work required under this section consists of stripping and stockpiling topsoil as shown on the drawings and/or as specified herein.
PART 2 - EXECUTION
A. The upper 4 to 8" of the topsoil from the area shall be stripped from all excavation areas and stockpiled for final grading.
Topsoil shall be stockpiled in an open area and at a location that will not cause tree damage during transport to/from the excavation location and stockpile location.
B. If the parking lot is used for stockpiling topsoil the top soil shall be placed on a tarp instead of dircetly on the pavement to allow complete and clean removal from the asphalt. No metal tracked vehicles shall be used on the asphalt.
C. Stockpiled topsoil shall be covered with an impermeable weighted tarp to prevent run-off.
SECTION 31 2000 - EARTH MOVING
31 2300 - EXCAVATION AND FILL
2333 TRENCHING AND BACKFILLING
A. The work required under this section consists of excavating trenches and backfilling for proposed utility lines as shown on the drawings and/or specified herein.
A. Plastic identification tape shall be 2" minimum width, clearly labeled to specifically identify type of utility, and have the capability of being detected by a metal detector when installed over non-metallic pipe.
B. Selected backfill shall be VDOT #10 and common backfill shall be free of all rock 2” and larger.
A. Trenches shall be excavated through any or all materials regardless of natural substances.
1. A firm full length support shall be formed for all underground pipe.
2. At paved road crossings, asphalt concrete shall be saw cut.
3. Curving of pipe shall be according to the manufacturer's recommendations.
4. If the bottom of any excavation is taken out beyond the limits shown on the drawings, it shall be backfilled and compacted to density of adjacent undisturbed material to the grade of the pipe with VDOT #10.
5. Where excavated material is rock or other unsatisfactory bedding material the trench shall be excavated below the final grade of the pipe invert a distance of 6" at the contractor’s expense. The trench shall then be backfilled and compacted to density of adjacent undisturbed material to the grade of the pipe with VDOT #10.
B. The contractor shall take all precautions to assure that water does not accumulate in trenches while utility lines are being constructed.
C. Backfill operations shall meet the following requirements.
1. Any pipe damaged by backfill operations shall be replaced by new pipe.
2. Identification tape shall be buried 12" below grade and run continuously.
3. Trenches shall be bedded to the proper elevation for installing the pipe with select backfill.
4. After the pipe is installed, selected material shall be placed beside the pipe in layers not exceeding 6" and compacted as shown on drawings.
5. Trenches shall be mounded an amount not to exceed 4"-6” from surrounding undisturbed ground except at road and trail crossings.
6. At gravel and native material road and trail crossings, trenches shall be mounded an amount to allow for settlement from traffic as directed by the COR.
7. At paved road and trail crossings all backfill shall be compacted to 90% maximum density as determined by ASTM
D-698. The top 6” of the trench shall be brought to grade with compacted asphalt concrete (VDOT SM-2A) in layers not exceeding 3” maximum thickness. The asphalt (175 F min.) shall be compacted with mechanical equipment to a uniform density while air temperature is 40 F min.
D. Backfilling shall not be performed on any section of pipeline without prior open trench inspection and approval by the
COR.
2316 EXCAVATION
2316.16 Structural Excavation for Minor Structures
PART 1- GENERAL
A. The work required under this section consists of excavation for structures as shown on the drawings and/or as specified herein.
B. All surplus excavation shall be disposed of on or about the construction site as much as possible. Any excess material shall be removed to a location within 5 miles of the project site as directed by the COR.
PART 3- EXECUTION
A. Strip all vegetation and deposit large material as specified in 1413.13 above. The upper 4 to 8" of the topsoil from the area shall be stockpiled for final grading.
B. Excavation shall produce surfaces to line and grade shown on drawings. All excavated areas shall drain when weather is such that water may collect in holes and ditches.
C. The root structure of all existing trees that are to remain shall not be disturbed. No excavated or fill material shall be piled under the dripline of any trees.
D. When all exterior earthwork is completed, the contractor shall give the entire site a final dressing to assure that all surfaces are in accordance with the elevations indicated on the drawings.
1. Finish grades adjacent to the building and sidewalks shall be sloped a maximum of 4:1 to provide surface drainage away from the building in all directions.
2. Use the topsoil previously stripped from the site for the upper layer of fill for finish grades.
3. Rake and shape the backfill and prepare site for seeding.
2323 FILL
2323.13 Backfill
PART 1- GENERAL
A. The work required under this section consists of backfill, and compaction for structures as shown on the drawings and/or as specified herein.
B. Contractor shall remove all unsuitable material not meeting compaction requirements and backfill with suitable material.
C. Contractor shall supply any additional suitable backfill and/or top soil necessary to bring and fill to grade and shape around the structure. A borrow area will be located within 5 miles of the project site a directed by the COR.
PART 2- PRODUCTS
A. Backfill Material
1. The material for fills shall consist of a mixture of soil, gravel, talus rock, disintegrated granite, semi-gravel, caliche, shale, scoria, clinkers, cinders, or other suitable material.
2. The material shall be free from organic vegetative matter.
3. The maximum size of any particle shall not be greater than 2" in diameter.
4. Oversize material may either be removed or broken down to the specified dimensions by any method which accomplishes reduction to that size.
5. The removal or the breakdown of oversize material to the specified size shall be done at the material source.
6. Contractor shall furnish any additional suitable material to backfill and shape under and around the finished structure and the stockpiled top soil may be reused.
PART 3- EXECUTION
A. Exterior fills shall be constructed to drain.
B. Backfill around structures and supports shall be done in 6" lifts and compacted to 90% of…