Amendment 02
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Q&A's-Expand_Shade_Canopy_Structure-Bushland.pdf | ||
| AG-32SD-RFQ-17-MD11_Amendment_01.pdf | ||
| Attachment_III_-_Bond_Forms.pdf | ||
| Attachment_IA_-_Maps,_Photos,_Sketches,_Specifications_&_Product_Literature.pdf | ||
| Attachment_II_-_Wage_Determination-Potter_Co..pdf | ||
| AG-32SD-RFQ-17-MD11.pdf | ||
| Attachment_I_-_Statement_of_Work,_Expand_Shade_Canopy.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or
(c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
BY
(Signature of Contracting Officer)
16C. DATE SIGNED
PREVIOUS EDITION UNUSABLE STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
This form was electronically produced by USDA/ARS/OCIO/ADB.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date,etc.)
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
04/04/2017
03/09/2017
1 6
Amendment No. 02
USDA, ARS, WBSC
1001 HOLLEMAN DRIVE EAST
COLLEGE STATION, TS 77840
Phone: (979) 260-9480 Email: Michael.Douglas@ars.usda.gov
SAME AS BLOCK 6
ALL PROSPECTIVE BIDDERS AG-32SD-RFQ-17-MD11
This solicitation is amended to incorporate the Pre-Bid/Site Visit meeting Agenda and minutes (See Attached). No other changes are made.
The bid due date IS extended. Bids are due April 14, 2017 by 3:00 p.m.
No other changes are made to the terms and conditions of this solicitation.
BIDDERS MUST ACKNOWLEDGE THIS AMENDMENT BY SIGNING THIS SF-30 AND RETURNING IT WITH YOUR BID.
Michael Douglas, CONTRACT SPECIALIST
INSTRUCTIONS
Instructions for items other than those that are self-explanatory, are as follows:
Item 1 (Contract ID Code) . Insert the contract type identification code that appears in the title block of the contract being modified.
Item 3 (Effective date).
For a solicitation amendment, change order, or administrative change, the effective date shall be the issue date of the amendment, change order, or administrative change.
For a supplemental agreement, the effective date shall be the date agreed to by the contracting parties.
For a modification issued as an initial or confirming notice of termination for the convenience of the Government, the effective date and the modification number of the confirming notice shall be the same as the effective date and modification number of the initial notice.
For a modification converting a termination for default to a termination for the convenience of the Government, the effective date shall be the same as the effective date of the termination for default.
For a modification confirming the contracting officer's determination of the amount due in settlement of a contract termination, the effec-tive date shall be the same as the effective date of the initial decision.
Item 6 (Issued By). Insert the name and address of the issuing office. If applicable, insert the appropriate issuing office code in the code block.
Item 8 (Name and Address of Contractor). For modifications to a contract or order, enter the contractor's name, address, and code as shown in the original contract or order, unless changed by this or a previous modification.
Item 12 (Accounting and Appropriation Data).
When appropriate, indicate the impact of the modification on each affected accounting classification by inserting one of the following entries:
(1) Accounting classification
Net increase $
(2) Accounting classification Net decrease $
NOTE: If there are changes to multiple accounting classifications that cannot be placed in block 12, insert an asterisk and the words "See continuation sheet".
Item 13. Check the appropriate box to indicate the type of modification. Insert in the corresponding blank the authority under which the modification is issued. Check whether or not contractor must sign this document. (See FAR 43.103.)
Item 14 (Description of Amendment/Modification).
Organize amendments or modifications under the appropriate Uniform Contract Format (UCF) section headings from the applicable solicitation or contract. The UCF table of contents, however, shall not be set forth in this document.
(1)
Indicate the impact of the modification on the overall total contract price by inserting one of the following entries:
(i)
(ii)
(iii)
Total contract price increased by $
Total contract price decreased by $
Total contract price unchanged.
State reason for modification.
When removing, reinstating, or adding funds, identify the contract items and accounting classifications.
When the SF 30 is used to reflect a determi-nation by the contracting officer of the amount due in settlement of a contract terminated for the convenience of the Government, the entry in Item 14 of the modification may be limited to -
(i) A reference to the letter determination; and
A statement of the net amount determined to be due in settlement of the contract.
Include subject matter or short title of solicita-tion/contract where feasible.
Item 16B. The contracting officer's signature is not required on solicitation amendments. The contract-ing officer's signature is normally affixed last on supplemental agreements.
STANDARD FORM 30 BACK (REV. 10-83)
(1)
(a)
(b)
(2)
(3)
(4)
(5)
(c)
(d)
(e)
(f)
Item 9, (Amendment of Solicitation No.--Dated), and 10, (Modification of Contract/Order No.-- Dated). Check the appropriate box and in the corresponding blanks insert the number and date of the original solicitation, contract, or order.
(g)
(2)
(3)
(4)
(5)
(6)
(i)
(ii)
(h)
Pre-Bid/Site Visit Agenda AG-32SD-RFQ-17-MD11
SITE VISIT/PRE-BID CONFERENCE
RFQ No. AG-32SD-RFQ-17-MD11 Date: March 29, 2017 9:00 a.m., Central Time Bushland, TX
AGENDA
Introductions - All
Bid Requirements - Review of Bidding Procedure
Questions and Answers on Contract
Receive Questions for Answers to be distributed as an Amendment to the Solicitation
Visit Project Site
This meeting is the site visit for Request for Quotation (RFQ) No. AG-32SD-RFQ-17-MD11 to Expand Shade Canopy Structure at Feed Lot Area. All work to be performed at the USDA, ARS, PA, Conservation & Production Research laboratory (CPRL), 2300 Experiment Station Rd., Bushland, TX 79012. No oral remarks or explanations made here today will alter or otherwise qualify the written provisions of the RFQ as it now exists. The minutes will be issued as soon as possible, covering the elements known now and those which may be discovered today. Only a written amendment will officially change or clarify the written provisions of the solicitation package. There has been one amendment issued to date. It is not anticipated that an extension to the bid due date will be issued.
1. Introductions:
Representatives from the Location, Stillwater, OK.
• Lloyd Banghart, Maintenance Worker/LSM
• Jim Mills, Administrative Officer
• Anna David, Secretary
Representative from the WBSC, Acquisition Branch, College Station, TX:
• Michael Douglas, Contracting Officer
2. Proposal Requirements:
Quoter is reminded of several important items in preparing bids.
1) You must sign the SF-18 form and sign SF-30 all amendments to the solicitation. There is one amendment to date.
2) You must complete Blocks 11, 12 & 13 and sign and date Blocks 14, and 15 of the SF-18, "Request for
Quotation" form and insert DUNS on page 2.
3) An offer guarantee is not required unless the quoted price is $150,000 or more.
4) In the event the successful quote exceeds $35,000, Payment and Performance Bonds (in the amount of 100%) are required on this contract within ten (10) days after award. Forms are included in the solicitation as Attachment III.
5) The Davis Bacon Act applies to the contract. They are included as Attachment II to the solicitation.
6) No exemption is granted for state or local taxes. You should include this expense as part of your quoted price.
7) Your quote is to be emailed to USDA, ARS, WBSC, Michael Douglas, Contract Specialist, 1001 Holleman Drive East, College Station, Texas 77840. Your quote is due no later than 3:00 p.m. (Central Time) on April 11, 2017.
8) Quotes must be returned via email with the following information provided for identification: Solicitation
Number, Solicitation Opening Date, and Solicitation Opening Time in the Subject Line.
9) There are no liquidated damages on this contract.
10) There will be no retainage withheld unless there has been no performance.
Contractor MUST be registered in the System for Award Management (SAM) prior to the submission of proposal/quote.
You can register online at www.sam.gov.
3. Utilities:
A reasonable amount of water and electricity, will be provided to the contractor by the Government at no cost.
The contractor will be expected to maintain their own work site trailer and/or telephone. Use of restroom facilities by contractor's employees, parking areas, storage areas, etc. will need to be discussed today with representatives from the location.
4. Technical Overview of the Project:
The representatives from the location will provide an overview of the technical aspects of the project.
Mr. Lloyd Banghart will now show all prospective bidders around the proposed jobsite and briefly explain the Governments objective.
http://www.sam.gov/
Site Visit/Pre-Bid Conference RFQ No. AG-32SD-RFQ-17-MD11 Date: March 29, 2017 9:10am, CT Bushland, TX
Minutes
Part I:
• Conference call with Michael Douglas to go over agenda
• James Porter in office with Michael Douglas during conference call
Part II:
Questions:
• Q1 – Do you want the contractor to present a stamped engineer drawing?
(Attachment IA, Ref. 1.6.2, Section 05400, Pg. 2) Any Shop Fabrication or Record Drawings should be stamped.
Do you want the engineer to redo the specifications? No.
Specifications state cold form metal framing only. But we can look at and possibly accept a different method of framing. You should propose as an alternate quote for this item.
Will there be a rendering on the addition of the shade structure? Is not Required, but we would welcome a Rendering if this doesn’t demand too many resources. As-Built drawings.
• Q2 – What are the specifications on the sheet trim?
• A2 – Specifications are in Attachment IA, Section 074113.
• Q3 – Specifications state that the new 5inch guttering needs to be seamless, 50 foot pieces, will the contractors be held to those specifications?
• A3 – Yes. The style was chosen because of the size of the gutters.
• Q4 – Will the piers be drilled into the ground?
• A4 – Yes, specifications state that the steel will be going into the ground.
• Q5 – Will cement cylinders be needed?
• A5 – Yes.
• Q6 – What kind of finish is needed on the steel, if any?
• A6 - Specifications state painting or galvanized, and that it needs to match the existing color.
Michael Douglas stated where to get all the necessary documents from the solicitation. www.fbo.gov http://www.fbo.gov/
| Site Visit Agenda-AG-32SD-RFQ-17-MD11 (Expand Shade Canopy).pdf |
| 1. Introductions: |
| 2. Proposal Requirements: |
| 1) You must sign the SF-18 form and sign SF-30 all amendments to the solicitation. There is one amendment to date. |
| 2) You must complete Blocks 11, 12 & 13 and sign and date Blocks 14, and 15 of the SF-18, "Request for Quotation" form and insert DUNS on page 2. |
| 3) An offer guarantee is not required unless the quoted price is $150,000 or more. |
| 4) In the event the successful quote exceeds $35,000, Payment and Performance Bonds (in the amount of 100%) are required on this contract within ten (10) days after award. Forms are included in the solicitation as Attachment III. |
| 5) The Davis Bacon Act applies to the contract. They are included as Attachment II to the solicitation. |
| 6) No exemption is granted for state or local taxes. You should include this expense as part of your quoted price. |
| 7) Your quote is to be emailed to USDA, ARS, WBSC, Michael Douglas, Contract Specialist, 1001 Holleman Drive East, College Station, Texas 77840. Your quote is due no later than 3:00 p.m. (Central Time) on April 11, 2017. |
| 8) Quotes must be returned via email with the following information provided for identification: Solicitation Number, Solicitation Opening Date, and Solicitation Opening Time in the Subject Line. |
| 9) There are no liquidated damages on this contract. |
| 10) There will be no retainage withheld unless there has been no performance. |
| 3. Utilities: |
| 4. Technical Overview of the Project: |