AG-32SD-C-17-0007_RFQ_ATTACHMENT_3_-5.pdf
PDF 23 KB Posted
- Attached to
- REQUIRE CONTINUITY OF CRITICAL SERVICES: SECURITY SYSTEMS UPGRADE Federal contract opportunity
- Solicitation number
- AG-32SD-C-17-0007
About this file
ATTACHMENTS 3 - 5
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AG-32SD-C-17-0007_RFQ_-_SECTIONS_A-M__A00003_02092017.pdf | ||
| SITE_VISIT_SIGN_IN_SHEET_RFQ_AG32SDC170007_02082017_COMPLETED.pdf | ||
| AG-32SD-C-17-0007_RFQ_-_SECTIONS_A-M__A00002_02072017.pdf | ||
| AG-32SD-C-17-0007_RFQ_-_SECTIONS_A-M.pdf | ||
| AG-32SD-C-17-0007_RFQ_ATTACHMENT_2,__1_of_3.pdf | ||
| AG-32SD-C-17-0007_RFQ_ATTACHMENT_1_-__WD_CA170009_01272017_CA9.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project No.: AG-32SD-C-17-0007 Date:
Project Title:
Project Location:
QUOTER/CONTRACTOR: Company Name and Address:
Item Description Labor Cost Material Cost Total Cost
Division 1 - General Requirements Division 2 - Existing Conditions Division 3 - Concrete Division 4 - Masonry Division 5 - Metals Division 6 - Wood and Plastic Division 7 - Thermal and Moisture Protection Division 8 - Doors and Windows Division 9 - Finishes Division 10 - Specialties Division 11 - Equipment Division 12 - Furnishings Division 13 - Special Construction Division 14 - Conveying Equipment Division 21 - Fire Suppression Division 22 - Plumbing
Division 26 - Electrical Division 27 - Communications Division 28 - Electronic Safety and Security Division 31 - Earthwork Division 32 - Exterior Improvements Division 33 - Utilities Division 34 - Transportation Subtotal Overhead (xx %) Profit (xx %) Bond (xx %)
Division 23 - Heat, Ventilating, and Air Conditioning
USDA, ARS, WHNRC, DAVIS , CA
SECURITY SYSTEMS UPGRADE
ATTACHMENT 3; COST BREAKDOWN - Submit with a completed SECTION B
AG-32SD-C-17-0007
USDA ARS, WESTERN HUMAN NUTRITION RESEARCH CENTER (WHNRC), DAVIS, CA
ATTACHMENT 4 – CALCULATION OF SELF-PERFORMED WORK
SUBMITTED IN RESPONSE TO RFQ # AG-32SD-C-17-0007
Self Performance for General Construction Contracts = 15% Self Performance for Specialty Trade Contracts = 25%
Use this form to identify and calculate cost of the work to be self-performed. (Includes mobilization and utilization of owned or rented plant and equipment to be operated by the prime contractor’s own employees; only those materials which will be both purchased and installed by the prime’s own forces; labor associated with those aforementioned materials or equipment; only those supplies to directly support work performed by the contractor’s own employees; and the contractor’s own job overhead costs.)
A.1 - Clearly describe the trades and the work to be self-performed by your company:
A.2 - Clearly describe the trades and the work which will be subcontracted for this project:
Show Calculation of Self-Performed work
B.1 Total Offer Price: $__________________
B.2 Subtract G&A, home office overhead, prime $(__________________) Contractor’s markups for profit, bond, state use tax, etc.
B.3“Total amount of work to be performed under $___________________ the Contract”
B.4 “Work to be self-performed”: = $ ________________________________________
(Includes mobilization and utilization of owned or rented plant and equipment to be operated by the prime contractor’s own employees; only those materials which will be both purchased and installed by the prime’s own forces; labor associated with those aforementioned materials or equipment; only those supplies to directly support work performed by the contractor’s own employees; and the contractor’s own job overhead costs.)
B. 5. Self-performed Work = Line B.4 / B.3 X 100% = __________________________%
AG-32SD-C-17-0007
USDA ARS, WESTERN HUMAN NUTRITION RESEARCH CENTER (WHNRC), DAVIS, CA
ATTACHMENT 5 – PAST PERFORMANCE QUESTIONNAIRE
Please submit three (3) past performance references along with your quote for general construction.
Provide the following information requested in this format for each of the projects/contracts being described. Projects may be on going and cannot have been completed no later than Three (3) years prior to the solicitation issue date. Provide frank, concise comments regarding YOUR PERFORMANCE on the contracts you identify. Use as much space as required.
A. Quoter/Contractor (Your) Name (Company/Division):
B. Project/Contract Title:
C. Contract Specifics:
1. Description of Effort as _________________Prime or
________________________________Subcontractor
2. Contract Number _____________________________
3. Original Contract $ Value ______________________
Current/Final Contract $ Value __________________
4. If amounts in 3 above are different, provide a brief description of the reason:
5. Completion Date:
1. Original Date______________________________
2. Current Schedule___________________________
3. Estimate/Final Completion Date_______________
4. Primary cause for Contract___________________
6. Modifications________________________________
D. Provide detailed description of the work performed under the contract and describe why you believe the work is very relevant, relevant or semi-relevant to this solicited project. (Use as much space as necessary)
In addition, address the following
1. Describe the specific elements of the work performed by your firm.
2. Indicate what elements of work were performed by your major subcontractors and indicate if those same subcontractors will be used on this project.
3. Address any technical areas about this project you consider uniquely relevant to this solicitation.