IMP_Amednment___000001_dated_06.08.2015.pdf
PDF 19 MB Posted
- Attached to
- USDA INTEGRATED PEST MANAGEMENT (IPM) PLAN
- Solicitation number
- AG-3142-S-15-0024
About this file
AMENDMENT 000001 DATED JUNE 08 2015.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
AG-3142-S-15-0024
x x
4 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
DASO-OPPM-POD-AMB-DC
Washington DC 20024 300 7th Street, S.W., Suite 377 Acquisition Management Branch-DC
USDA, DM/OPPM/POD
05/27/2015000001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
05/27/2015
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
SOLICITATION FOR PEST CONTROL SERVICES AT USDA'S SOUTH BUILDING AND JAMIE L. WHITTEN
BUILDING, WASHINGTON DC, 20250 AND GEORGE WASHINGTON CARVER CENTER, BELTSVILLE, MARYLAND
20705.
THE PURPOSE OF THIS AMENDMENT IS TO INCORPORATE THE FOLLOWING DOCUMENTS:
1. SF-30 DATED JUNE 08, 2015.
2. PAST PERFORMANCE QUESTIONNAIRE
3. SOUTH BUILDING PRE-BID WALKTHROUGH SIGN-IN SHEET DATED TUESDAY, JUNE 2, 2015.
4. GEORGE WASHINGTON CARVER CENTER WALKTHROUGH PRE-BID SIGN-IN SHEET DATED THURSDAY, JUNE
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
TODD LENNOX
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
AG-3142-S-15-0024/000001
4, 2015.
5. SOUTH BUILDING FLOOR PLANS.
6. JAMIE L. WHITTEN BUILDING FLOOR PLANS.
7. GEORGE WASHINGTON CARVER CENTER FLOOR PLANS.
- END OF AMEDNMENT -
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Solicitation # AG-3142-S-15-0024 USDA’s INTEGRATED PEST MANAGEMENT (IPM) PLAN RFP
Amendment # 000001
THIS AMENDMENT INCORPORATES THE FOLLOWING DOCUMENTS TO THE ABOVE REFERENCED
SOLICITATION PACKAGE:
1. SF-30 DATED JUNE 08, 2015.
2. PAST PERFORMANCE QUESTIONNAIRE
3. SOUTH BUILDING PRE-BID WALKTHROUGH SIGN-IN SHEET DATED TUESDAY, JUNE 2,
2015.
4. GEORGE WASHINGTON CARVER CENTER WALKTHROUGH PRE-BID SIGN-IN SHEET DATED
THURSDAY, JUNE 4, 2015.
5. SOUTH BUILDING FLOOR PLANS.
6. JAMIE L. WHITTEN BUILDING FLOOR PLANS.
7. GEORGE WASHINGTON CARVER CENTER FLOOR PLANS.
END OF MODIFICATION
PAST PERFORMANCE QUESTIONNAIRE
Please complete this Questionnaire and e-mail or fax to Contract Specialist, e-mail gerardo.rivera@dm.usda.gov or FAX: 202- 202-720-9226
USDA’s INTEGRATED PEST MANAGEMENT (IPM) PLAN RFP
We,___________________________ ____ , are currently in the process of preparing a proposal for the United States
Department of Agriculture, USDA, Solicitation Number AG-3142-S-15-0024. As part of our proposal, we have listed you as a reference on our performance for this type of service with your firm or agency under the previous/current contract listed below. Your input on our performance is therefore requested and much appreciated.
Please complete this Questionnaire and e-mail or fax to Contract Specialist, e-mail gerardo.rivera@dm.usda.gov or FAX: 202- 202-720-9226.
Questionnaire is due to Mr. Gerardo F. Rivera no later than Thursday, June 25, 2015, noon (ET). Questionnaire must be submitted directly to the Contract Specialist on company letterhead if faxed or emailed from a corporate email account.
If you will not be available on for verification of this past performance evaluation on or about the last July 2015, please indicate another POC for the contacting officer to contact.
Alternate POC name: ________________________________________
Alternate POC phone number: _________________________________
Alternate POC e-mail address: _________________________________
Thank you.
NAME OF OFFEROR: _______________________________
I. CURRENT OR HISTORICAL CONTRACT INFORMATION
CONTRACT REFERENCED:
1. Contract or Identifying Number: ______________________________________________________
2. Contract / Task order Amount: _______________________________________________________
3. Performance Period: _______________________________________________________________
4. Brief project description: ____________________________________________________________
5. Name of Person Completing Questionnaire: ____________________________________________
Agency/Company: ________________________________________________________________
Title: _______________________________ Phone: _____________________________________
E-mail: __________________________________________________________________________ mailto:gerardo.rivera@dm.usda.gov mailto:gerardo.rivera@dm.usda.gov
II. EVALUATION.
Please rate the Contractor utilizing the guide below. Explanatory narratives for as many responses as possible would be appreciated. These narratives need not be lengthy, just detailed. Attach additional pages if more space is needed.
Evaluation Definitions –
The following definitions should be used in the assessment of Contractor performance.
EXCEPTIONAL
Performance EXCEEDS MOST contractual requirements. The performance of areas being assessed was accomplished with few minor issues or concerns.
VERY GOOD
Performance EXCEEDS SOME contractual requirements. The performance of areas being assessed was accomplished with few minor issues or concerns, for which the Contractor’s corrective actions were highly effective.
SATISFACTORY
Performance MEETS contractual requirements. The performance of the areas being assessed contains minor issues or concerns, for which corrective actions taken by the Contractor were effective.
MARGINAL
Performance MEETS SOME contractual requirements. The performance of the areas being assessed includes significant problems, issues, or concerns for which corrective actions taken by the Contractor were only somewhat effective.
UNSATISFACTORY
Performance DOES NOT MEET contractual requirement. The performance of the areas being assessed includes serious problems, issues, or concerns for which the Contractor’s corrective actions were ineffective.
NOT APPLICABLE (N/A)
Performance information not recent or relevant as defined in the
Solicitation. Unable to provide assessment.
III. PAST PERFORMANCE EVALUATION
Question 1. PERFORMANCE
What is your assessment of the Contractor’s ability to meet your requirements?
Exceptional
Very
Good Satisfactory Marginal Unsatisfactory N/A
Performance
Comments, if any.
Question 2. TIMELINESS
To what extent were contract performance requirements met? Consider also such things as; contract performance period requirements; provided submittals in a timely manner; timely completion of tasks; timely submission of close out documents, etc. Was timely and satisfactory response to warranty issues after task completion provided?
Exceptional
Very
Good Satisfactory Marginal Unsatisfactory N/A
Timeliness
Question 3. QUALITY OF WORK
Evaluate performance in complying with contract requirements, quality achieved and overall technical expertise demonstrated.
Exceptional Very Good Satisfactory Marginal Unsatisfactory N/A
Quality of
Work
Question 4. COORDINATION
How well were subcontractors, subconsultants, suppliers, and/or the labor force managed and coordinated? Or, if firm was a subcontractor, how well did they respond to coordination efforts and work with other subs? Were there any problems and, if so, how were they handled?
Exceptional Very Good Satisfactory Marginal Unsatisfactory N/A
Coordination
Question 5. CUSTOMER SATISFACTION:
To what extent were the end users satisfied with: Quality? Cost? Schedule?
Exceptional Q____ C_____S____
Very Good Q____ C_____S____
Satisfactory Q____ C_____S____
Marginal Q____ C_____S____
Unsatisfactory Q____ C_____S____
Question 6:
If given the opportunity, would you work with this firm again?
Yes ___________ No ____________ Not Sure ____________
OTHER REMARKS:
Use the space below to provide other information related to the contractor's performance. This may include selection of subcontractors/subconsultants, flexibility in dealing with contract challenges, payment issues, their overall concern for the client's interest (if applicable), project awards received, etc.
USDA's INTEGRATED PEST MANAGEMENT (IPM) PLAN RFP
Site Visits at USDA, South Building/Whiten Building
1400 Independence Ave., Washington, DC
Tuesday, June 2, 2015
SOUTH BUILDING CAFETERIA CONFERENCE ROOM
SIGN IN SHEET
NAME COMPANY PHONE NUMBER E-MAIL ADDRESS
(1) 2001 /4, 111.-i).
(2) TWOIMAS 6S ID 2_ 2 te,A-ANA Al-eY La.vrtfre, e Wviti c-1
(3)
C (.2t, C-ielosed sPe-s4- C-(-7 11-1-v"0 cr%-deri.- C.‘,11?C SIC 674") Ite•-•°"'"
(4) A 4-trldre_a, ByLiba_Ker (Tr' le eimLe nig9 I abruio aka. 0-9s. Conv
(5) yo-H--7-17-Zhc, 2 e - k-ti 6 117—, Lc t
(6) (--Xihelro 11.-k4-14- k PA- filos,ae
L 7 1,17
(7) ILIA 1-x Q Pt 2- 20 --(0 3 0 te.>"".,4 (4.)
(8) ( 1/3Fie ,S)-11/114--3
L/S OA— It° S r eATASI , e. , (9)
(10)
Page 1 of t
(4) •--:C.PL %.olerr_ (-- (<- 5-102 g(t.„A4 DPr-- 202-'—'7j2.93
-c 7A4 ( 6 )
(8)
(9)
(10)
Solicitation # AG-3142-S-15-0024 USDA's INTEGRATED PEST MANAGEMENT (IPM) PLAN RFP
Site Visits at USDA, George Washington Carver Center, Beltsville, MD
Thursday, June 4, 2015
SIGN IN SHEET
NAME COMPANY PHONE NUMBER E-MAIL ADDRESS
(1) 4
*P,ZNrit-inc. ,
(2) ltWIT-OCal"ker 'MO (Cev (es 7036q I 6)j bruloa KLir cvm)
( ) f\-\jAkcky\t\O.Cut14
Page lot 2
South Building - Sub-basement Floor Plan
FS
A S pa ce
FS
A
IT
C on tra ct or s
R oo m S
-3
B
Door Blocked
R oo m S
-3
A
South Building - Basement Floor Plan
South Building - 1st Floor Plan
Independence Ave
C Street
South Building - 2nd Floor Plan
South Building - 3rd Floor Plan
South Building - 4th Floor Plan
South Building - 5th Floor Plan
South Building - 6th Floor Plan
Jamie L. Whitten Building - Basement Floor Plan
Jamie L. Whitten Building - First Floor Plan
Jamie L. Whitten Building - Second Floor Plan
04 2009
Jamie L. Whitten Building - Third Floor Plan
Jamie L. Whitten Building - Fourth Floor Plan
Jamie L. Whitten Building - Fifth Floor Plan
| IMP Mod 0001 - SF-30 |
| IMP Mod 0001 - COVER PAGE |
| IMP Mod 0001 - PPQ |
| IMP Mod 0001 - sign in sheets |
| IPM sign in sheet SB |
| Page 1 |
| IPM sign in sheet GWCC |
| Page 1 |
| IMP Mod 0001 - floor plans |
| USDA HQ floor plans smaller file size |
| GWCC floor plans |
| GWCC Site Plan |
| Bldg 1 Lower Level |
| Bldg 1 Fl 1 |
| Bldg 1 Fl 2 |
| Bldg 2 Lower Level |
| Bldg 2 Fl 1 |
| Bldg 2 Fl 2 |
| Bldg 3 Fl 1 |
| Bldg 3 Fl 2 |
| Bldg 4 Fl 1 |
| Bldg 4 Fl 2 |
File details come from the government source that posted it. Updated .