SF30.pdf

PDF 94 KB Posted

Attached to
Gallentine Acid Mine Discharge project
Solicitation number
AG2D37S080153
Issued by

About this file

Amend 0001 to add clauses and revise bid schedule

View the file

Other files

File Type Posted
abstract.xls XLS spreadsheet
Designpack.pdf PDF
30Kplustermsandclauses2.rtf RTF text file
PA4_dvb.txt TXT text file
SF_1442-HBGtemplate.pdf PDF
Contractortidbits.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODlFlCAlTON NO.

6. ISSUED BY

3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

CODE 7. ADMINISTERED BY (If other than Item 6) CODE I

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

12. ACCOUNTING AND APPROPRIATION DATA (If required)

9A. AMENDMENT OF SOLICITATION NO.

9B. DATED (SEE ITEM 11)

1 OA. MODIFICATION OF CONTRACT/ORDER NO.

1 OB. DATED (SEE ITEM 11)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR- 43.103(b)

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D.

A.

OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 1OA, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

(X)

52.248-3 -- Value Engineering – Construction (Sep 2006)

(a) General. The Contractor is encouraged to develop, prepare, and submit value engineering change proposals (VECP’s) voluntarily. The Contractor shall share in any instant contract savings realized from accepted VECP’s, in accordance with paragraph (f) below.

(b) Definitions. “Collateral costs,” as used in this clause, means agency costs of operation, maintenance, logistic support, or Government-furnished property.

“Collateral savings,” as used in this clause, means those measurable net reductions resulting from a VECP in the agency’s overall projected collateral costs, exclusive of acquisition savings, whether or not the acquisition cost changes.

“Contractor’s development and implementation costs,” as used in this clause, means those costs the Contractor incurs on a VECP specifically in developing, testing, preparing, and submitting the VECP, as well as those costs the Contractor incurs to make the contractual changes required by Government acceptance of a VECP.

“Government costs,” as used in this clause, means those agency costs that result directly from developing and implementing the VECP, such as any net increases in the cost of testing, operations, maintenance, and logistic support. The term does not include the normal administrative costs of processing the VECP.

“Instant contract savings,” as used in this clause, means the estimated reduction in Contractor cost of performance resulting from acceptance of the VECP, minus allowable Contractor’s development and implementation costs, including subcontractors’ development and implementation costs (see paragraph (h) below).

“Value engineering change proposal (VECP)” means a proposal that --

(1) Requires a change to this, the instant contract, to implement; and

(2) Results in reducing the contract price or estimated cost without impairing essential functions or characteristics; provided, that it does not involve a change --

(i) In deliverable end item quantities only; or

(ii) To the contract type only.

(c) VECP preparation. As a minimum, the Contractor shall include in each VECP the information described in subparagraphs (c)(1) through (7) below. If the proposed change is affected by contractually required configuration management or similar procedures, the instructions in those procedures relating to format, identification, and priority assignment shall govern VECP preparation. The VECP shall include the following:

(1) A description of the difference between the existing contract requirement and that proposed, the comparative advantages and disadvantages of each, a justification when an item’s function or characteristics are being altered, and the effect of the change on the end item’s performance.

(2) A list and analysis of the contract requirements that must be changed if the VECP is accepted, including any suggested specification revisions.

(3) A separate, detailed cost estimate for

(i) the affected portions of the existing contract requirement and

(ii) the VECP.

The cost reduction associated with the VECP shall take into account the Contractor’s allowable development and implementation costs, including any amount attributable to subcontracts under paragraph (h) below.

(4) A description and estimate of costs the Government may incur in implementing the VECP, such as test and evaluation and operating and support costs.

(5) A prediction of any effects the proposed change would have on collateral costs to the agency.

(6) A statement of the time by which a contract modification accepting the VECP must be issued in order to achieve the maximum cost reduction, noting any effect on the contract completion time or delivery schedule.

(7) Identification of any previous submissions of the VECP, including the dates submitted, the agencies and contract numbers involved, and previous Government actions, if known.

(d) Submission. The Contractor shall submit VECP’s to the Resident Engineer at the worksite, with a copy to the Contracting Officer.

(e) Government action.

(1) The Contracting Officer will notify the Contractor of the status of the VECP within 45 calendar days after the contracting office receives it. If additional time is required, the Contracting Officer will notify the Contractor within the 45-day period and provide the reason for the delay and the expected date of the decision. The Government will process VECP’s expeditiously; however, it will not be liable for any delay in acting upon a VECP.

(2) If the VECP is not accepted, the Contracting Officer will notify the Contractor in writing, explaining the reasons for rejection. The Contractor may withdraw any VECP, in whole or in part, at any time before it is accepted by the Government. The Contracting Officer may require that the Contractor provide written notification before undertaking significant expenditures for VECP effort.

(3) Any VECP may be accepted, in whole or in part, by the Contracting Officer’s award of a modification to this contract citing this clause. The Contracting Officer may accept the VECP, even though an agreement on price reduction has not been reached, by issuing the Contractor a notice to proceed with the change. Until a notice to proceed is issued or a contract modification applies a VECP to this contract, the Contractor shall perform in accordance with the existing contract. The decision to accept or reject all or part of any VECP is a unilateral decision made solely at the discretion of the Contracting Officer.

(f) Sharing --

(1) Rates. The Government’s share of savings is determined by subtracting Government costs from instant contract savings and multiplying the result by --

(i) 45 percent for fixed-price contracts; or

(ii) 75 percent for cost-reimbursement contracts.

(2) Payment. Payment of any share due the Contractor for use of a VECP on this contract shall be authorized by a modification to this contract to --

(i) Accept the VECP;

(ii) Reduce the contract price or estimated cost by the amount of instant contract savings; and

(iii) Provide the Contractor’s share of savings by adding the amount calculated to the contract price or fee.

(g) Collateral savings. If a VECP is accepted, the Contracting Officer will increase the instant contract amount by 20 percent of any projected collateral savings determined to be realized in a typical year of use after subtracting any Government costs not previously offset. However, the Contractor’s share of collateral savings will not exceed the contract’s firm-fixed-price or estimated cost, at the time the VECP is accepted, or $100,000, whichever is greater. The Contracting Officer is the sole determiner of the amount of collateral savings.

(h) Subcontracts. The Contractor shall include an appropriate value engineering clause in any subcontract of $55,000 or more and may include one in subcontracts of lesser value.

In computing any adjustment in this contract’s price under paragraph (f) above, the Contractor’s allowable development and implementation costs shall include any subcontractor’s allowable development and implementation costs clearly resulting from a VECP accepted by the Government under this contract, but shall exclude any value engineering incentive payments to a subcontractor. The Contractor may choose any arrangement for subcontractor value engineering incentive payments; provided, that these payments shall not reduce the Government’s share of the savings resulting from the

VECP.

(i) Data. The Contractor may restrict the Government’s right to use any part of a VECP or the supporting data by marking the following legend on the affected parts:

These data, furnished under the Value Engineering -- Construction clause of contract ___________, shall not be disclosed outside the Government or duplicated, used, or disclosed, in whole or in part, for any purpose other than to evaluate a value engineering change proposal submitted under the clause. This restriction does not limit the Government’s right to use information contained in these data if it has been obtained or is otherwise available from the Contractor or from another source without limitations.

If a VECP is accepted, the Contractor hereby grants the Government unlimited rights in the VECP and supporting data, except that, with respect to data qualifying and submitted as limited rights technical data, the Government shall have the rights specified in the contract modification implementing the VECP and shall appropriately mark the data. (The terms “unlimited rights” and “limited rights” are defined in Part 27 of the Federal Acquisition Regulation.)

(End of Clause)

AG 2D37 S 08 0153 Amend 0001 3/24/2008

Section B – Bid Schedule

INDIAN CREEK WATERSHED - GALLENTINE SITE

FAYETTE COUNTY, PENNSYLVANIA

ITEM SPEC. UNIT

NO. WORK or MATERIAL NO. QUANTITY UNIT PRICE AMOUNT

1 Mobilization and Demobilization 8 1 Job XXXXX $ __________

2 Clearing and Grubbing 2 1 Job XXXXX $ __________

3 Structure Removal 3 1 Job XXXXX $ __________

4 Pollution Control, 5 1 Job XXXXX $ __________

5 Permanent Seeding 6 1 Job XXXXX $ __________

6 Construction Surveys 7 1 Job XXXXX $ __________

7 Removal of Water 11 1 Job XXXXX $ __________

8 Excavation, Unclassified 21 1 Job XXXXX $ __________

9 Earthfill 23 1 Job XXXXX $ __________

10 Rockfill (Basin Rock Baffles 1&2) 25 530 CY $_____ $ __________

11 Rockfill (Vertical Flow Pond #1) 25 5136 Ton $_____ $ __________

12 Rockfill (Vertical Flow Pond #2) 25 2540 Ton $_____ $ __________

13 Rock-Lined Waterway #1 27 85 LF $_____ $ __________

14 Rock-Lined Waterways #2, 3 27 40 LF $_____ $ __________

15 6" (Perforated/Solid) PVC Pipe 45 1122 LF $_____ $ __________

16 8" (Perforated) PVC Pipe 45 1200 LF $_____ $ __________

17 12" (Solid) PVC Pipe 45 1120 LF $_____ $ __________

18 12" (Perforated) PVC Pipe 45 180 LF $_____ $ __________

19 12" Gate Valves 45 *9 Each $_____ $ __________

20 4' x 4' Anti-Seep Collars 45 *12 Each $_____ $ __________

21 Field Office 96 1 Job XXXXX $ __________

22 Compost 400 560 CY $_____ $ __________

23 5' Water Level Control Structure 401 1 Each $_____ $ __________

24 7' Water Level Control Structure 401 1 Each $_____ $ __________

AG 2D37 S 08 0153 Amend 0001 3/24/2008

25 12' Water Level Control Structure 401 1 Each $_____ $ __________

TOTAL ALL ITEMS $ __________

Prepared By: ______________________________________ Date: _________________

Approved By: ______________________________________ Date: _________________

Work shall be started within 14 calendar days after issuance of the Notice to Proceed.

* Quantity change

VECP.pdf
52.248-3 -- Value Engineering – Construction (Sep 2006)
bid sked Amend 0001.pdf
Section B – Bid Schedule
contract id:
pg: 1
pg2: 7
amendment: 0001
effect date: 3/24/2008
pur no:
project no: Gallentine
issued by': Contracting Officer

USDA-NRCS

One Credit Union Place, Suite 340 Harrisburg, PA 17110-2993

code: 122D37
code2:
issued by'2:
contractor:
code3:
facility code:
blank: Yes
blank2: Off
amend no: AG 2D37 S 08 0153
9b: 12/21/2007
10a:
10b:
11: Off
11a: Yes
copies:
above: Yes
acct data:
13: Off
13b: Off
13d: Off
authority:
authority2:
authority3:
contr: Yes
contr2: Off
num copies:
descrip: The purpose of this amendment is to incorporate FAR clauses 52.211-18 Variation in Estimated Quantity (April 1984), 52.248-3 Value Engineering - Construction (Sep 2006), and to change quantities as per the attached revised bid schedule.
15a:
16a: Tim Sittig
15b:
15c:
16c: 3/24/2008
16b: /s/ Tim Sittig
13a: Off
clrFrm:

File details come from the government source that posted it. Updated .