Building Construction Specifications
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Davis_Bacon_Wage_Determination_-_General_Decision_Number_-_GA170118_07-14-2017__GA118.pdf | ||
| Location_and_Map.pdf | ||
| Statement_of_Work.pdf | ||
| SF1442-14_-_AG-2B46-S-17-0087_Jimmy_Carter_Plant_Materials_Center_-_Georgia.pdf | ||
| AG-2B46-S-17-0087_-_PMC_Building_Repairs_-_Georgia.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Jimmy Carter Plant Materials Center
Building Repairs Specifications
July 2017
Jimmy Carter Plant Materials Center
Building Repairs Specifications
Table of Contents
Structure Removal p. 3
Mobilization and Demobilization p. 5
Contractor Quality control p. 8
Water heater replacement p 10
Electric door openers p. 10
Roof Runoff Structure p. 12
Awning p. 15
Steel door replacement p. 15
Locking hardware p. 20
Ceiling repair p. 22
Exterior lighting p. 24
Parking lot sealcoating and striping p.25
Location Map p. 30
Building Layout Map p. 31
Construction Specification 3—Structure Removal
1. Scope The work shall consist of the removal, salvage, and disposal of structures (including fences) from the designated areas.
2. Marking Method 1—Each structure or structure part to be removed will be marked with stakes, flags, paint, or other suitable method.
Method 2—The area boundaries from which structures must be removed will be marked using stakes, flags, paint, or other suitable method. Structures to remain undisturbed or to be salvaged will be designated by special markings.
3. Removal Method 1—All structures designated for removal in the contract shall be removed to the specified extent and depth.
Method 2—Within the areas so marked, all visible and buried structures identified shall be removed to the specified extent and depth.
4. Salvage Structures or structure parts that are designated to be salvaged shall be carefully removed and neatly placed in the specified or approved storage location. Salvaged structures that are capable of being disassembled shall be dismantled into individual members or sections. Such structures shall be neatly and systematically match marked with paint before disassembly. All connectors and other parts shall be marked to indicate their proper location within the structure and shall be fastened to the appropriate structural member or packed in suitable containers.
Material from fences designated to be salvaged shall be placed outside the work area on the property on which the fence was originally located. Fence wire shall be rolled into uniform rolls of suitable size and neatly piled with other salvaged materials. Posts and rails shall be neatly stacked.
5. Disposal of refuse materials Refuse materials resulting from structure removal shall be disposed of in a manner and at locations specified in section 7 of this specification or in an acceptable manner and at locations approved by the contracting officer. Disposal by burning shall be in accordance with local rules and regulations.
6. Measurement and payment Method 1—For items of work for which specific unit prices are established by the contract, payment for the removal of each structure unit, except fences, is made at the contract unit price. Fences removed or removed and salvaged are measured to the nearest linear foot. Payment for fence removal or removal and salvage is made at the contract unit prices for each type and size of fence.
Such payment will constitute full compensation for all labor, equipment, tools, applicable permits and associated fees for burning and disposal of refuse, and all other items necessary and incidental to the completion of the work.
Method 2—For items of work for which specific lump sum prices are established by the contract, payment for structure removal is made at the contract lump sum price.
Such payment will constitute full compensation for all labor, equipment, tools, applicable permits and associated fees for burning and disposal of refuse, and all other items necessary and incidental to the completion of the work.
All Methods—The following provisions apply to all methods of measurement and payment. Compensation for any item of work described in the contract, but not listed as a contract line item number in the bid schedule, is included in the payment for the item of work to which it is made subsidiary. Such items and items to which they are made subsidiary are identified in section 7 of this specification.
7. Items of work and construction details
A. Contract line item #1. Structure removal shall consist of removal and disposal of the items listed below. All work associated with these items is included under
CLIN 1.
B. Measurement and payment shall be made on lump sum (LS) basis. Payment shall constitute full compensation for all work associated with Contract line item 1.
C. Removal shall follow method 1 listed in section 3 of this specification. All items will be identified.
D. Disposal of all materials will be off-site, at approved landfill or metal recycling facility. No structures are scheduled for salvage.
E. Existing gutters installed on 2 tractor storage buildings and herbarium shall be removed and properly disposed. Approximately 185 linear feet of gutter, along with associated downspout, is to be removed. Exact locations and dimensions will be made available during site visit.
F. Existing water heaters in main office and herbarium building shall be disconnected from distribution plumbing within the building and electrical supply service before removal. 2 water heaters to be removed. Care shall be taken to prevent damage to plumbing and electrical service within the buildings. Water heaters shall be removed and properly disposed.
G. 5 existing steel walk thru doors shall be removed and properly disposed. Doors are located in shop, seed house (2), brown building, and drying building.
H. 9 existing outside floodlights shall be removed and properly disposed. 2 on shop building, 3 on herbarium, and 4 on seed house. Removal of these outside lights should be coordinated with installation of new lights at these locations to prevent unprotected electrical wiring.
I. Existing awning over rear double –door entrance to herbarium building shall be removed and disposed. Care should be taken to prevent damage to building walls and doors.
Timing of removal shall be coordinated to occur before new awning installation.
J. Existing locking hardware at 6 locations shall be removed and properly disposed.
Locations are herbarium building, pesticide house, greenhouse. Timing of removal shall be coordinated to occur before locking hardware installation section of this contract.
Timing shall prevent having doors that can not be locked overnight.
K. Area of water damaged drywall or gypsum board ceiling in womens restroom of main office building shall be removed and properly disposed. Area to be removed will be no larger than 8 feet by 6 feet. Care shall be given in removal to allow installation of replacement without additional repairs.
Construction Specification 8—Mobilization and Demobilization
The work consists of the mobilization and demobilization of the contractor's forces and equipment necessary for performing the work required under the contract. It does not include mobilization and demobilization for specific items of work for which payment is provided elsewhere in the contract. Mobilization will not be considered as work in fulfilling the contract requirements for commencement of work.
2. Equipment and material Mobilization shall include all activities and associated costs for transportation of contractor's personnel, equipment, and operating supplies to the site; establishment of offices, buildings, and other necessary general facilities for the contractor's operations at the site; premiums paid for performance and payment bonds including coinsurance and reinsurance agreements as applicable; and other items specified in section 4 of this specification.
Demobilization shall include all activities and costs for transportation of personnel, equipment, and supplies not required or included in the contract from the site; including the disassembly, removal, and site cleanup of offices, buildings, and other facilities assembled on the site specifically for this contract.
This work includes mobilization and demobilization required by the contract at the time of award. If additional mobilization and demobilization activities and costs are required during the performance of the contract as a result of changed, deleted, or added items of work for which the contractor is entitled to an adjustment in contract price, compensation for such costs will be included in the price adjustment for the item or items of work changed or added.
3. Payment Payment will be made as the work proceeds, after presentation of paid invoices or documentation of direct costs by the contractor showing specific mobilization and demobilization costs and supporting evidence of the charges of suppliers, subcontractors, and others. When the total of such payments is less than the lump sum contract price, the balance remaining will be included in the final contract payment. Payment of the lump sum contract price for mobilization and demobilization will constitute full compensation for completion of the work.
Payment will not be made under this item for the purchase costs of materials having a residual value, the purchase costs of materials to be incorporated in the project, or the purchase costs of operating supplies.
1. Items of work and construction details
A. Contract Line Item #2, Mobilization and Demobilization.
1) This item shall consist of the mobilization and demobilization required by the contractor to perform the work under this contract.
Payment as described will constitute full compensation for completion of the work.
2) Contractor shallprovide:
a) Construction Site Plan: Prior to the start of work, submit a site plan showing the locations and dimensions of temporary facilities (including layouts and details, equipment and material storage area (onsite and offsite), and access and haul routes, avenues of ingress/egress to the work area. Indicate if the use of a supplemental or other staging area is desired. Show locations, construction entrances, trash dumpsters, and worker parking areas.
b) Bulletin Board: Immediately upon beginning of work, provide a weatherproof covered
(glass, acrylic glass, or plastic) bulletin board not less than 36 by 48 inches in size for displaying the Equal Employment Opportunity poster, a copy of the wage decision contained in the contract, Wage Rate Information poster (if applicable), and other information approved by the Contracting Officer. Locate the bulletin board at the project site in a conspicuous place easily accessible to all employees, as approved by the Contracting Officer. Erect signs within 15 days after receipt of the notice to proceed. Correct the data required by the safety sign daily, with light colored metallicor non-metallicnumerals.
c) Employee Parking: Contractor employees will park privately owned vehicles in gravel lot by the building identified as old office on attached drawings unless otherwise approved by the Contract Officer. This area will be within reasonable walking distance of the construction site. Contractor employee parking must not interfere with existing and established parking requirements of the government installation.
d) Restoration of Storage and Temporary Office Areas: Upon completion of the project remove the bulletin board, signs, barricades, haul roads, and any other temporary products from the site. Restore to the original or better condition, areas used by the Contractor for the storage of equipment or material, or other use. Gravel used to traverse grassed areas must be removed and the area restored to its original condition, including top soil and seeding as necessary.
3) Measurement and payment will be on a lump sum (LS) basis. Payment shall constitute full compensation for all work associated with Bid Item 2.
Construction Specification 94—Contractor Quality Control
The work consists of developing, implementing, and maintaining a qualitycontrol system to ensure that the specified quality is achieved for all materials and work performed.
2. Equipment and materials
Equipment and material used for qualitycontrol shall be of the quality and condition required to meet the test specifications cited in the contract. Testing equipment shall be properlyadjusted and calibrated at the start of operations and the calibration maintained at the frequencyspecified. Records of equipment calibration tests shall be available to the engineer at all times. Equipment shall be operated and maintainedbyqualified operators as prescribed in the manufacturer's operating instructions, the references specified, and as specified in section 10 of this specification. All equipment and materials used in performing qualitycontrol testing shall be as prescribed bythe test standards referenced in the contract or in section 10.
All equipment and materials shall be handled and operated in a safe and proper manner and shall comply with all applicable regulations pertaining to their use, operation, handling, storage, and transportation.
3. Quality control system
Method 1—The contractor shall develop, implement, and maintain a system of qualitycontrol to provide the specified material testing and verification of material qualitybefore use. The system activities shall include procedures to verify adequacy of completed work, initiate corrective action to be taken, and document the final results. The identification of the qualitycontrol personnel and their duties and authorities shall be submitted to the contracting officer in writing within 15 calendar days after notice of award.
Method 2—The contractor shall develop, implement, and maintain a system adequate to achieve the specified qualityof all work performed,material incorporated, and equipmentfurnished before use. The system established shall be documented in a written plan developed by the contractor and approved by the contracting officer. The system activities shall include the material testing and inspection needed to verifythe adequacyof completed work and procedures to be followed when corrective action is required.
Dailyrecords to substantiate the conduct of the system shall be maintained bythe contractor. The quality control plan shall cover all aspects of qualitycontrol and shall address, as a minimum, all specified testing and inspection requirements. The plan provided shall be consistent with the planned performance in the contractor's approvedconstruction schedule. The plan shall identifythe contractor's onsite qualitycontrol manager and provide an organizational listing of all qualitycontrol personnel and their specific duties. The written plan shall be submitted to the contracting officer within 15 calendar days after notice of award. The contractor shall not proceed with anyconstruction activity that requires inspection until the written plan is approvedbythe contractingofficer.
All methods—The qualitycontrol system shall include, but not be limited to, a rigorous examination of constructionmaterial, processes, and operation, including testing ofmaterial and examination of manufacturer's certifications as required, to verifythat work meets contract requirements and is performed in acompetent manner.
4. Quality control personnel
Method 1—Qualitycontrol activities shall be accomplished bycompetent personnel.A competent person is: One who is experienced and capable of identifying, evaluating, and documenting that materials and processes being used will result in work that complies with the contract; and, who has authorityto take prompt action to remove, replace, or correct such work or products not in compliance. Off-site testing laboratories shall be certified or inspected bya nationallyrecognized entity. The Contractor shall submit to the Contracting Officer, for approval, laboratorycertification or inspection information. The Contractor shall submit to the ContractingOfficer, for approval, the names, qualifications, authorities, certifications, and availabilityof the competent personnel who will perform the qualitycontrol activities.
Method 2—Qualitycontrol activities shall be accomplished bycompetent personnel who are separate and apart from line supervision and who report directly to management. A competent person is one who is experienced and capable of identifying, evaluating, and documenting that material and processes being used will result in work that complies with the contract, and who has authorization to take prompt action to remove, replace, or correct such work or products not in compliance. Offsite testing laboratories shall be certified or inspected by a nationallyrecognized entity. The Contractor shall submit to the Contracting Officer, for approval, laboratorycertification or inspection information. The contractor shall submit to the contracting officer, for approval,the names, qualifications, authorities,certifications, and availabilityof the competent personnel who will perform the qualitycontrol activities.
5. Post-award conference
The contractor shall meet with the contracting officer before any work begins and discuss the contractor's qualitycontrol system. The contracting officer and the contractor shall develop a mutual understanding regarding the qualitycontrol system, including procedures for correcting qualitycontrol issues.
6. Records
The contractor's quality control records shall document both acceptable and deficient features of the work and corrective actions taken. All records shall be on forms approved by the contracting officer, be legible, and be dated and signed by the competent person creating the record.
Unless otherwise specified in section 10 of this specification, records shall include:
a. Documentation of shop drawings including date submitted to and date approved by the contracting officer,results of examinations, anyneed for changes or modifications,manufacturer's recommendations and certifications, if any, and signature of the authorized examiner.
b. Documentation of material delivered including quantity, storage location, and results of quality controlexaminationsand tests.
c. Type, number, date, time, and name of individual performing qualitycontrol activities.
d. The material or item inspected and tested, the location and extent of such material or item, and a description of conditions observed and test results obtained during the qualitycontrol activity.
e. The determination that the material or item met the contract provisions and documentation that the engineer wasnotified.
f. For deficient work, the nature of the defects, specifications not met, corrective action taken, and results of qualitycontrol activities on the corrected material or item.
7. Reporting results
The results of contractor qualitycontrol inspections and tests shall be communicated to the engineer immediatelyupon completion of the inspection or test. Unless otherwise specified in section 10, the original plus one copy of all records, inspections, tests performed, andmaterial testing reports shall be submitted to the engineer within one working day of completion. The original plus one copy of documentation of material delivered shall be submitted to the engineer before the material is used.
8. Access
The contracting officer and the engineer shall be given free access to all testing equipment, facilities, sites, and related records for the duration of the contract.
9. Payment
Method 1—For items of work for which lump sum prices are established in the contract, payment is made as the work proceeds, after presentation bythe contractor of invoices showing related costs and evidence of charges bysuppliers, subcontractors, and others for furnishing supplies and work performed. If the total of such payments is less than the lump sum contract price for this item, the remaining balance is included in the final contract payment. Payment of the lump sum contract price constitutes full compensationfor completion of the work.
Payment is not made under this item for the purchase cost of material and equipment having a residual value.
Method 2—For items of work for which lump sum prices are established in the contract, payment is prorated and paid in equal amounts on each monthly estimate. The number of months used for prorating shall be the number estimated to complete the work. The final month's prorate amount is made with the final payment. Payment as described above constitutes full compensation for completion of the work.
Payment is not made under this item for the purchase cost of material and equipment having a residual value.
All methods—Compensation for any item of work described in the contract, but not listed in the bid schedule, is included in the payment for the item of work to which it is made subsidiary. Such items and the items to which they are made subsidiary are identified in section 10.
10. Items of work and construction details
A. Item shall include all actions taken to ensure quality of material specifications, provide direction and supervision to employees, quality of installation, and providing requested documentation to the COR or inspector.
B. Separate payment will not be made under this specification.
The following construction specifications are not contained in 210, National Engineering Handbook part 642 specifications.
Water heater replacement
Contract line item #3. Water heater replacement shall consist of installation of water heater as described in this section. All work associated with these items is included under CLIN 3.
Measurement and payment shall be made on lump sum (LS) basis. Payment shall constitute full compensation for all work associated with Contract line item 3.
New water heaters shall be installed in same location as old water heater removed under construction specification 03 – structure removal.
Installation of water heaters shall be completed using industry accepted practices following manufacturers’ recommendations. Care shall be given to follow required clearance dimensions, water line connections, and electrical overload breaker and wire size required by manufacturer. Relief drain and condensate drain lines shall be installed to existing floor drain. All electrical work shall be completed by a licensed electrician following ANSI/NFPA 70 latest edition.
Water heater replacement for main office building. Water heater provided and installed shall be General Electric Geospring hybrid electric water heater model GEH50DFEJSR or equivalent.
Substitution of equivalent materials requires preapproval by owner.
1. Energy star rated UL listed 50 gallon heat pump/hybrid water heater
2. Electronic controls to allow temperature set in 100 to 140 degree Farenheit.
3. First hour delivery rated greater than 60 gallons.
4. 10 year manufacturers’ warranty.
Water heater replacement for herbarium building. Water heater provided and installed shall be Rheem RTEX 4 tankless electric water heater for on-demand point of use applications or equivalent.
Substitution of equivalent materials requires preapproval by owner.
1. Rated at not less than 3 Kw
2. Copper clad immersion heating elements
3. Certified UL 499 and CSA 22.2
4. 5 year warranty
Electric door openers
Contract line item #4. Electric door openers shall consist of installation of door openers as described in this section. All work associated with these items is included under CLIN 4.
Measurement and payment shall be made on lump sum (LS) basis. Payment shall constitute full compensation for all work associated with Contract line item 4.
Electric door openers shall be provided and installed to 3 existing steel panel bay doors in building identified as seed house. Installation shall include all materials and labor needed to properly mount opener for proper operation and include electrical wiring as needed to provide
110 volt single phase power to opener. Installation of openers shall be completed using manufacturers’ recommendations. Limit switch should be adjusted to all door to fully open to top of door opening and close fully seated to floor. All electrical work shall c o m p l y w i t h N E C a n d be completed by a licensed electrician. Test for proper operation and adjust until satisfactory results are obtained.
Demonstrate operation to owner's personnel.
Material specification for the door openers shall be commercial duty Liftmaster model T 501L5 ½ HP industrial trolley operator or equivalent, meeting the following specifications and include standard monitored photo eye. One NEMA approved three button control station shall be provided and installed for each door. Substitution of equivalent materials requires preapproval by owner.
1. ½ horsepower continuous duty rated electric motor trolley type door opener. Door openers shall include powerhead, track assemblies, carriage, mounting frames and brackets, controls, and wiring needed to complete a fully functioning door opener.
2. Operate on 110 volt electric current
3. Wiring completed to national electric code rated for amperage load of motor
4. Include monitored photo eye safety
5. Include NEMA 3 button operator control located within 10 feet of door approximately 5 feet above floor level.
6. Include emergency release to allow manual operation
NATURAL RESOURCES CONSERVATION SERVICE
CONSERVATION PRACTICE STANDARD
ROOF RUNOFF STRUCTURE
(No.)
CODE558
DEFINITION
Structures that collect, control, and transport precipitationfrom roofs.
PURPOSE
To improve water quality, reduce soil erosion, increase infiltration, protect structures, and/or increasewater quantity.
CONDITIONS WHEREPRACTICEAPPLIES
Where roof runoff from precipitation needs to be:
• diverted awayfrom structures or contaminatedareas;
• collected, controlled, and transported to a stable outlet; or
• collected and used for other purposes such as irrigation or animal watering facility.
CRITERIA
General Criteria Applicable to All Purposes
Laws and Regulations. Plan work to comply with all Federal, state and local laws, rules and regulations. Impact to cultural resources, wetlands and Federal and state protected species shall be evaluated and avoided or minimized to the extent practicable during planning, design and implementation of this conservation practice in accordance with established National and Georgia policy.
Design Capacity. The minimum design capacity for roof runoff structures shall be a 10-year storm frequency, 5-minute rainfall precipitation event, except where excluding roof runoff from manure management facilities. In that case, a 25-year frequency, 5-minute precipitation event shall be used to design roof runoff structures (Refer to AgriculturalWaste Management Field Handbook, NEH Part 651 Chapter 10 Appendix 10B). When gutters are used, the capacityof the downspout(s) must equal or exceed the gutter flow rate.
Outlets. Runoff may empty into surface or underground outlets, or onto the ground surface.
Surface and underground outlets shall be sized to ensure adequate design capacity and shall provide for clean-out as appropriate. When runoff from roofs empties onto the ground surface, a stable outlet shall be provided. When runoff is conveyed through a gutter and downspout system, an elbow and energy dissipation device shall be placed at the end of the downspout to provide a stable outlet and direct water away from the building.
Spacing of downspouts shall be determined by the shape and size of the roof area served. The flow rates for downspouts shall be calculated by using the orifice discharge equation with a coefficient of discharge (c) not greater than 0.65.
Surface or ground outlets such as rock pads, rock filled trenches with subsurface drains, concrete and other erosion-resistant pads, or preformed channels maybe used, particularly where snow and ice are a significant load component on roofs.
Supports. In regions where snow and ice will accumulate on roofs, guards and sufficient supports to withstand the anticipated design load shall be included. Gutter supports shall have sufficient strength to withstand anticipated water, snow, and ice loads. They shall have a maximum spacing of 120 cm (48 in) for galvanized steel and 81 cm (32 in) for aluminum or plastic. Wood gutters shall be mounted on fascia boards using furring blocks that are a maximum of 61 cm (24 in) apart. Downspouts shall be securely fastened at the top and bottom with intermediate supports that are a maximum of 3 m (10 ft) apart.
Materials. Roof runoff structures shall be made of durable materials with a minimum design life of ten years. Roof gutters and downspouts may be made of aluminum, galvanized steel, wood, or plastic. Aluminum gutters and downspouts shall have a minimum nominal thickness of
0.027 inches and 0.020 inches, respectively.
Galvanized steel gutters and downspouts shall be a minimum 28 gauge. Wood shall be clear and free of knots. Wood may be redwood, cedar, cypress, or other species that have the desired longevity. Plastics shall contain ultraviolet stabilizers. Dissimilar metals shall not be in contact with each other.
Rock-filled trenches and pads shall consist of poorlygraded rock (all rock fragments approximately the same size) and be free of appreciable amounts of sand and/or soil particles. Crushed limestone shall not be used for backfill material unless it has been washed.
Subsurface drains or outlets shall meet the material requirements of the applicable NRCS conservation practice standard.
Concrete appurtenances used shall meet the requirements of NRCS NEH Part 642, Chapter 2, Construction Specification 32 Structure Concrete.
Protection. Roof runoff structures shall be protected from damage by livestock and equipment.
Additional Criteria to Increase Infiltration Runoff shall be routed onto pervious landscaped areas (e.g., lawns, mass planting areas, infiltration trenches, and natural areas) to increase infiltration of runoff. These areas shall be capable of infiltrating the runoff in such a way that replenishes soil moisture without adversely affecting the desired plant species.
Additional Criteria to Protect Structures Runoff shall be directed awayfrom structure foundations to avoid wetness and hydraulic loading on the foundation. On expansive soils or bedrock, downspout extensions shall be used to discharge runoff a minimum of five (5) feet from the structure. The discharge area for runoff must slope awayfrom the protected structure.
Additional Criteria to Increase Water Quantity
Storage structures for non-potable purposes such as irrigation water shall be designed in accordance withNRCS conservation practice standards,asappropriate.
Potable water storage structures shall be constructed of materials and in a manner that will not increase the contamination of the stored water. Roof runoff collected and stored for potable uses must be treated prior to consumption and shall be tested periodicallyto assure that adequate quality is maintained for humanconsumption.
CONSIDERATIONS
Avoid discharging outlets near wells and sinkholes or into structures that discharge directlyinto surface waters.
Where appropriate, snow and ice guards may be installed on roofs to protect gutters and reduce the hazard to humans and animals below.
Gutters may be installed below the projection of the roof line to further reduce gutter damage from snow and ice. Strainers or “Gutter Guards” should be installed to reduce the potential for the gutter being clogged byleaves and the like.
Some designs mayprovide secondarybenefits, e.g. rock pads mayalso reduce rodent problems around livestock and poultry barns.
PLANS ANDSPECIFICATIONS
Describe the requirements for applying the practice to achieve its intended purpose in the plans and specifications. As a minimum the plans and specifications shall include:
• Location of all gutters, downspouts, and outlets.
• Spacing and size of all gutters, downspouts and outlets.
• Slope of gutters.
• Type, quality, and quantity of all materials used.
• Other practices essential to the proper functioning of the roof runoff structure, such as underground outlets.
• Location of utilities and notification requirements.
OPERATION ANDMAINTENANCE
An operation and maintenance plan shall be developed that is consistent with the purposes of the practice, its intended life, safety requirements, and the criteria for the design.
The plan shall contain, but not be limited to, the followingprovisions:
• Keep roof runoff structures clean and free of obstructions that reduce flow.
• Make regular inspections and perform repair maintenance as needed to ensure proper functioning of the roof runoff structures.
• Inspect roof runoff structures after each storm event.
• Inspect area below runoff discharge areas for erosion and repair, if needed.
REFERENCES
USDA-NRCS. 1999. National Engineering Handbook, Part 651, AgriculturalWaste ManagementFieldHandbook.
Roof Runoff Structure Items of work and construction details:
A. Contract line item #5. Roof Runoff Structure shall consist of installation of gutters as described in this section. All work associated with these items is included under CLIN 5. Measurement and payment shall be made on lump sum (LS) basis. Payment of roof runoff structure and awning shall constitute full compensation for all work associated with Contract line item 5.
A. New gutters installed on main office building shall be K style, not less than 5 inch aluminum seamless material, field formed from pre-finished coil stock material with a minimum nominal thickness of 0.027 inches. New gutters installed on lawn mower storage building and herbarium shall be commercial or box style, not less than 5 inch aluminum seamless material with a minimum nominal thickness of 0.027 inches.
Approximately 170 linear feet of new gutters, along with associated downspouts, shall be installed. Gutters shall be installed with positive slope toward downspouts. Color shall be selected for each building to match exterior color on building and approved by inspector before installation.
B. Downspouts shall be 3 inch by 4 inch aluminum matched to the gutter material.
Downspouts shall have at least one upper and one lower attachment and include an elbow and extension to release water at least 18 inches from building wall. Splash blocks shall be placed under the downspout release point. All hardware shall be galvanized for corrosion resistance.
C. The main office building will have 3 separate sections of gutter installed. Each section shall have 1 downspout. The herbarium gutter shall have 4 downspouts installed spaced along its length. The lawn mower shed shall have 1 downspout installed per side of building.
D. Finish shall be factory applied and rated for not less than 10 years.
E. The operation and maintenance plan is the responsibility of the owner.
F. Installation shall be completed using industry accepted practices following manufacturers’ recommendations.
Awning
Contract line item #5. Awning shall consist of installation of awning as described in this section.
All work associated with these items is included under CLIN 5. Measurement and payment shall be made on lump sum (LS) basis. Payment roof runoff structure and awning shall constitute full compensation for all work associated with Contract line item 5.
Aluminum door canopy awning shall be provided and installed above rear double door entry to herbarium building. Canopy size should be 8 feet wide (along building wall) with 42 to 48 inch projection away from building wall. Aluminum covering should be not less than 0.019 gauge and include supporting aluminum framework that support awning by attaching to building wall.
Canopy covering should be factory finished white in color. Attaching hardware shall be galvanized or stainless steel to resist corrosion. Installation should be completed following manufacturers’ recommendations.
Steel door replacement
Contract line item #6. Steel door replacement shall consist of installation of doors as described in this section. All work associated with these items is included under CLIN 6. Measurement and payment shall be made on lump sum (LS) basis. Payment for steel door replacement and locking hardware shall constitute full compensation for all work associated with Contract line item 6.
5 steel exterior walk thru doors will be provided and installed including jams, frames, attaching brackets and hardware. Exact location of each door will be identified during the site visit. 1 door is to be replaced in shop building, 2 doors replaced in seed house building, 1 door replaced in brown building, and 1 door in drying building.
Approximate size of these doors is 36 inches by 80 inches. Contractor is responsible for verifying accuracy of all dimensions.
Frames shall be installed plumb, level, rigid, and in true alignment as recommended in ANSI/SDI A 250.11, recommended erection instructions for steel frame doors. All frames other than slip on types shall be fastened to the adjacent structure so as to retain their position and stability. Doors shall be installed and fastened to maintain alignment with frames to achieve maximum operational effectiveness and appearance. Doors shall be adjusted to swing open fully, close securely and align lockset and strike
Plate for proper closing.
2.1 All steels used to manufacture doors, frames, anchors, and accessories shall meet at least one or more of the following requirements:
A. Cold rolled steel shall conform to ASTM designations A1008, Standard Specification for Steel Sheet, Cold-Rolled, Carbon, Structural, High-Strength Low-Alloy and High-Strength Low-Alloy with Improved Formability and A568, Standard Specification for Steel, Sheet, Carbon, Structural, and High-Strength, Low-Alloy, Hot-Rolled and Cold-Rolled, General Requirements for.
B. Hot rolled, pickled and oiled steel shall comply with ASTM designations A1011, Standard Specification for Steel, Sheet and Strip, Hot-Rolled, Carbon, Structural, High-Strength Low- Alloy and High-Strength Low-Alloy with Improved Formability and A568, Standard Specification for Steel, Sheet, Carbon, Structural, and High-Strength, Low-Alloy, Hot-Rolled and Cold-Rolled, General Requirements for.
C. Hot dipped zinc coated steel shall be of the alloyed type and comply with ASTM designa- tions A924, Standard Specification for General Requirements for Steel Sheet, Metallic- Coated by the Hot-Dip Process and A653, Standard Specification for Steel Sheet, Zinc- Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process.
2.2 Frames
A. Exterior frames
1. 0.053 inch or 16 gauge minimum steel thickness for frames
B. Provide frames, other than slip-on drywall type with a minimum of three anchors per jamb suitable for the adjoining wall construction. Provide anchors of not less than 0.042″ (1.0 mm) in thickness or 0.167″ (4.2 mm) diameter wire. Frames OVER 7′6″ (2286 mm) shall be provided with an additional anchor per jamb.
C. Base anchors shall be provided, other than slip-on drywall type, with minimum thickness of 0.042″
(1.0mm). For existing masonry wall conditions that do not allow for the use of a floor anchor, an additional jamb anchor shall be provided.
D. All frames shall be fully prepared for all mortise template hardware and reinforced only for surface mounted hardware. Drilling and/or tapping shall be completed by others.
E. Minimum hardware reinforcing gages shall comply with Table 4 of ANSI/SDI A250.8, Specifications for Standard Steel Doors and Frames (SDI-100).
2.3 Doors
A. Doors t h ic k n ess shall be 1 ¾ inches.
B. Face steel sheet shall meet at least one or more of the following requirements: 0.032 inch or 20 gauge.
C. End closure: The top and bottom of the doors shall be closed with [flush] [inverted] chan- nels or closures. The channels or closures shall have a minimum material thickness of 0.042″ (1.0mm).
D. Core: See ANSI/SDI A250.8, Specifications for Standard Steel Doors and Frames (SDI- 100), Section 2.3.2.
E. Door edge design: See ANSI/SDI A250.8, Specifications for Standard Steel Doors and Frames (SDI- 100), Section 2.3.1.3.
F. Minimum hardware reinforcing gages shall comply with Table 4 of ANSI/SDI A250.8, G. Minimum of 3 hinges connecting door to frame.
2.4
2.5
2.6 Finishing
Prime finish: Doors and frames shall be thoroughly cleaned, and chemically treated to insure maximum paint adhesion. All surfaces of the door and frame exposed to view shall receive a fac- tory applied coat of rust inhibiting primer, either air-dried or baked-on. The finish shall meet the requirements for acceptance stated in ANSI/SDI A250.10 Test Procedure and Acceptance Criteria for Prime Painted Steel Surfaces for Steel Doors and Frames.
2.7 Design clearances
A. The clearance between the door and frame head and jambs shall be 1/8″ (3.2 mm) in the case of both single swing and pairs of doors.
B. The clearance at the bottom shall be [3/4″ (19.1 mm)] [5/8″ (15.8 mm)] and allow for proper installation of threshold.
C. The clearance between the face of the door and door stop shall be 1/16″ (1.6 mm) to 1/8″ (3.2 mm).
D. All clearances shall be, unless otherwise specified, subject to a tolerance of ± 1/32″ (0.8 mm).
Threshold Threshold shall be installed in door opening. Threshold should meet ADA requirements.
Constructed of aluminum or other corrosion resistant material.
Part 3: Execution
3.1 Installation
A. Frames shall be installed plumb, level, rigid and in true alignment as recommended in ANSI/SDI
A250.11, Recommended Erection Instructions for Steel Frames. All frames other than slip-on types shall be fastened to the adjacent structure so as to retain their position and stability. Drywall slip-on frames shall be installed in prepared wall openings in accordance with manufacturer’s instructions.
B. Doors shall be installed and fastened to maintain alignment with frames to achieve maxi- mum operational effectiveness and appearance. Doors shall be adjusted to maintain perimeter clearances as specified in Section 2.1.8. Shimming shall be performed by the installer as needed to assure the proper clearances are achieved.
C. Installation of hardware items shall be in accordance with the hardware manufacturer’s recommendations and templates. ANSI/SDI A250.6, Recommended Practice for Hardware Reinforcing on Standard Steel Doors and Frames shall be consulted for other pertinent information.
Door frames and doors shall have factory applied finish to resist corrosion. Finish color should be white.
Attaching hardware such as screws should be galvanized or stainless steel to resist corrosion.
Locking Hardware
Contract line item #6. Locking hardware shall consist of installation of awning as described in this section.
All work associated with these items is included under CLIN 6. Measurement and payment shall be made on lump sum (LS) basis. Payment steel door replacement and locking hardware shall constitute full compensation for all work associated with Contract line item 6.
Locking hardware and door handles shall be provided and installed on 11 doors. Installation should follow industry accepted practices and manufacturers’ recommendations. Doors to have new locking hardware installed are located in herbarium (2), seedhouse (2), brown building (1), pesticide house (2), shop (1), drying building (1), and greenhouse (2). Exact locations will be identified during the site visit.
Installation timing of new locking hardware must be coordinated to occure after installation of doors listed in steel door replacement section. New locks should be installed after removal of old locks to prevent occurrence of doors that cannot be locked overnight.
Material specifications for the handles and locking hardware. Locking hardware and door handles should meet the specifications of the Schlage AL series or equivalent. Finish should be nickel or chrome. Locks should include standard 6 pin cylinders keyed alike for all 11 locksets. 2 keys shall be provided for each lockset.
Schlage AL series specifications
Specifications Handing:
Non-handed.
Door thickness:
13⁄8" to 17⁄8" (35 mm to 48 mm) standard.
2" (51 mm) optional.
Backset:
Strike:
ANSI curved lip strike 47⁄8" x 1 1⁄4" x 11⁄4" lip to center standard. Optional strikes, lip lengths and ANSI wrought strike box available. See page 17.
Cylinder and keys:
6-pin patented Everest 29 S123 keyway standard with two nickel silver keys per lock.
Keying options:
23⁄4" (70 mm) standard. 23⁄8" (60 mm), 33⁄4" (95 mm) Interchangeable core and Primus® high security and 5" (127 mm) optional.
Front:
Steel. 21⁄4" x 11⁄8" square corner, beveled, for 23⁄4" backset standard. Optional 1" square corner, 1" radius corner, and non-UL drive-in / round face. For availability with specific backsets, see page 16.
Lock chassis:
Steel, zinc dichromated for corrosion resistance
Latch bolt:
Brass, chrome plated, 1⁄2" throw, deadlocking on keyed and exterior functions.
Exposed trim:
Wrought brass and bronze. Levers are pressure cast zinc, plated to match finish symbols.
cylinders. Master keying, grand master keying, and construction keying.
Warranty:
Three-year limited.
Certifications
ANSI:
Meets or exceeds A156.2 Series 4000, Grade 2 strength and operational requirements.
Meets A117.1 Accessibility Code.
Federal:
Meets FF-H-106C.
California State Reference Code:
(Formerly Title 19, California State Fire Marshal Standard) All levers with a return to door of 1⁄2" (64 mm) or less comply.
UL / cUL:
All locks listed for A label single doors, 4' x 8'.
Letter F and UL symbol on latch front indicate listing. UL437 Listed locking cylinder optional:
specify Primus 20-500 Series cylinder.
ADA compliant:
Schlage Lock Company offers a wide selection of locks designed to meet the Americans With Disabilities Act.
Ceiling Repair
Contract line item #7. Ceiling repair shall consist of installation of gypsum board and finishing and painting as described in this section. All work associated with these items is included under CLIN 7. Measurement and payment shall be made on lump sum (LS) basis. Payment shall constitute full compensation for all work associated with Contract line item 7.
Drywall or gypsum board ceiling in women’s restroom located in main office building shall have water damaged area removed under Structure removal specification 03, replaced and re-finished. Exact location of ceiling repair will be identified during the site visit. A r e a t o b e r e p a i r e d i n c l u d e s H V A C v e n t a n d l i g h t i n g f i x t u r e . Timing of this work must be coordinated with owner by giving a 2 day notice to the COR or inspector for scheduling an out of service period. Work shall be scheduled for completion in a manner that minimizes the out of service period.
Gypsum board or drywall panel size should be selected to match thickness of existing ceiling and minimize panel to panel joints needed. The complete area removed under construction specification 03 – structure removal shall have new drywall installed.
Joints should be aligned on framing support whenever possible. Attachment to framing should use drywall type screws, not less than 1 5/8 inch long, spaced not more than 12 inches apart set just below panel surface. A layer of drywall joint compound should be applied to all screw heads and all joints before pressing a reinforcing tape into wet compound. Smooth joint. Allow joint compound to dry between each coat. Apply second and third coats of joint compound in progressively wider layers as needed to complete a smooth finish. Use final sanding as needed to complete smoothing of joints. Clean repair area and remove all dust.
Painting repaired ceiling.
Entire ceiling of womens restroom should be painted according to the following specification. The material specification is for Sherwin Williams paint products or equivalent. Substitution of equivalent materials requires preapproval by owner.
1.1 PROJECT CONDITIONS
A. Maintain environmental conditions (temperature, humidity, and ventilation) within limits recommended by manufacturer for optimum results. Do not install products under environmental conditions outside manufacturer's recommended limits.
1.2 PAINT MATERIALS - GENERAL
A. Paints and Coatings:
1. Unless otherwise indicated, provide factory-mixed coatings. When required, mix coatings to correct consistency in accordance with manufacturer's instructions before application. Do not reduce, thin, or dilute coatings or add materials to coatings unless such procedure is specifically described in manufacturer's product instructions. 22
2. For opaque finishes, tint each coat including primer coat and intermediate coats, one-half shade lighter than succeeding coat, with final finish coat as base color. Or follow manufactures product instructions for optimal color conformance.
B. Primers: Where the manufacturer offers options on primers for a particular substrate, use primer categorized as "best" by the manufacturer.
C. Coating Application Accessories: Provide all primers, sealers, cleaning agents, cleaning cloths, sanding materials, and clean-up materials required, per manufacturer's specifications.
D. Color: Refer to Finish Schedule for paint colors, and as selected.
E. LEED Requirements: Products in compliance with requirements of IEQ Credit
4.2 USGBC LEED-09 NC/CI/CS.
1.3 INTERIOR PAINT SYSTEMS (LEED-V4 NC/CI/CS COMPLIANT)
A. DRYWALL - (Walls, Ceilings, Gypsum Board and similar items)
1. Latex Systems:
a. Flat Finish:
1) 1st Coat: S-W ProMar 200 Zero VOC Interior Latex
Primer, B28W2600 (4 mils wet, 1.5 mils dry).
2) 2nd Coat: S-W ProMar 200 Zero VOC Latex Flat, B30-2600
Series.
3) 3rd Coat: S-W ProMar 200 Zero VOC Latex Flat, B30-2600
Series (4 mils wet, 1.6 mils dry per coat).
PART 2 EXECUTION
2.1 EXAMINATION
A. Do not begin installation until substrates have been properly prepared
B. Previously Painted Surfaces: Verify that existing painted surfaces do not contain lead based paints, notify Architect immediately if lead based paints are encountered.
2.2 SURFACE PREPARATION
A. General: Surfaces shall be dry and in sound condition. Remove oil, dust, dirt, loose rust, peeling paint or other contamination to ensure good adhesion.
B. Drywall - Interior: Must be clean and dry. All nail heads must be set and spackled.
Joints must be taped and covered with a joint compound. Spackled nail heads and tape joints must be sanded smooth and all dust removed prior to painting.
2.3 INSTALLATION
A. Apply all coatings and materials with the manufacturer's specifications in mind. Mix and thin coatings according to manufacturer's recommendations.
B. Do not apply to wet or damp surfaces. Wait at least 30 days before applying to new concrete or masonry.