CamptonDayUse_PreBidQuestions.docx
DOCX document 16 KB Posted
- Attached to
- Campton Day Use #69 & #69A Storm Repair
- Solicitation number
- AG-24H8-S-13-0064
About this file
Campton Day Use PreBid Questions and Responses
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CamptonDayUse_PreBidQuestions_081913.docx | DOCX document | |
| CamptonDayUSe_Pre-BidSignInSheet.pdf | ||
| Section_J_Attachment_3_WD_NH130029_010413__NH29.pdf | ||
| Section_J_Attachment_1_Specifications_61_pages.pdf | ||
| Section_J_Attachment_2_Plans_10_pages.pdf | ||
| Past_Performance_Questionnaire.docx | DOCX document | |
| AG-24H8-S-13-0064.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Campton Day Use Pre-Bid Questions. 08/12/2013
1. Question – Can the wearing course of asphalt pavement be placed a day after the binder course of asphalt pavement has been installed?
Answer – Yes provided that weather conditions are acceptable.
2. Question – What happens to the organic material that is located on the road?
Answer – It is to be spread on site near the project area.
3. Question – Is erosion control needed where the culverts are being removed?
Answer – Yes, care shall be taken to protect the drainage from erosion.
4. Question – Can the project be completed this fall?
Answer – Yes, if weather conditions are acceptable.