** REVISED PART I - SCHEDULE OF ITEMS **

SECTION B – SERVICES AND PRICES

Lake Chelan Erosion Control – Phase 7, Sites 14, 15, 16 & 17

Chelan Ranger District

Okanogan Wenatchee National Forest

-Chelan County

B- 1 - SCHEDULE OF ITEMS - August 22, 2016 corrections are in RED

ITEM

NO.

DESCRIPTION

PAY

UNIT

EST.

QTY.

PRICE

TOTAL

SITE 14 (T.30 N. R.19E, Sec 20)

25202(b.1) Special Rock Embankment, Erosion Control Treatment T3 Modified, Zones A and B.

Ton

Site 14

Site 15 (T.30 N. R.19E, Sec 20)

15756(b) Erosion Control, Permanent Excelsior Fiber Wattles Zones A, B & C.

Foot

15756(d) Erosion Control, Log (Horizontal Large Woody Debris). One (1) piece in Zone A. One (1) piece in Zone B. One (1) piece in Zone C. One (1) piece in Zone D. Wood is Government Furnished at Prince Creek, Contractor haul.

Each

Treatment T3, Treatment Zone A, B, C and D.

Site 15

Site 16 (T.30 N. R.19E, Sec 20)

15756(c) Erosion Control, Geotextile, Type IV.A 12’ Wide Rolls Required.

25202(c) Special Rock Embankment, Erosion Control Treatment TW Modified, Treatment Zone A. Total length 185’

Site 16

Site 17 (T.30 N. R.19E, Sec 20)

15756(b) Erosion Control, Permanent Excelsior Fiber Wattles Zones A & B.

15756(d) Erosion Control, Log (Horizontal Large Woody Debris). Two (2) pieces in Zone A. Five (5) pieces in Zone B. Wood is Government Furnished at Prince Creek, Contractor haul.

Each

Treatment T3, Treatment Zone A and B.

Site 17

15101 Mobilization Lump Sum 1 $________ $________

PROJECT

B-2 - NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price

Construction Contracts, shall not be in addition to the contract price. Include bond payments under 151.01

Mobilization.

Payment will be made on actual work performed as described in FP-03 109.01 unless otherwise noted.