Amend_0001_A.pdf
PDF 368 KB Posted
- Attached to
- Gibraltar Trail Construction
- Solicitation number
- AG-05G1-S-13-0005
About this file
Modification 0001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Gibraltar_Drawings_0005Amend.pdf | ||
| Amend_0005.pdf | ||
| WA1_06212013.pdf | ||
| rfq_0005_amend_0005_Gibraltar.pdf | ||
| Amend_0004.pdf | ||
| Amend_0003.pdf | ||
| Amend_0002.pdf | ||
| Gibraltar_Drawings_Amendment.pdf | ||
| WA1_04192013.pdf | ||
| BioPreferred_Product_Categories_Jan_2013.pdf | ||
| Gibraltar_Drawings.pdf | ||
| WA1_04122013.pdf | ||
| Trail_Specs.pdf | ||
| rfq_0005_Gibraltar.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment 0001, AG-05G1-S-13-0005 Gibraltar Trail Construction, Republic Lake Ranger Districts, Page 1
1. CONTRACT ID CODE PAGE OF PAGES
AMENDMENT OF SOLICITATION / MODIFICATION OF CONTRACT
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable) 0001 4/28/2013 633407
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
USDA Forest Service
Colville National Forest 765 South Main
Colville, WA 99114
Contracting Officer
765 South Main
Colville, WA 99114
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) ( ) 9A. AMENDMENT OF SOLICITATION NO.
AG-05G1-S-13-0005
Gibraltar Trail Construction, D4
X 9B. DATED (SEE ITEM 11)
4/15/2013
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers X is extended, is not ex-tended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
( ) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN
THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, X is required to sign this document and return 1 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible)
This solicitation is hereby amended to reflect a new completion date of October 31, 2014, a revised schedule of items to include an item for clearing and grubbing, a revised Trail Construction Log (Drawing 3) and a revised DOL Wage Determination. Clause 452.236-75 Maximum Workweek – Construction Schedule is hereby deleted. The quote due date remains May 13 2013 at 3:00 p.m..
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print) Cathy VanAlyne
Contract Specialist
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY 4/8/2013
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)
PREVIOUS EDITION UNUSABLE Prescribed by GSA
FAR (48 CFR) 53.243
Amendment 0001, AG-05G1-S-13-0005 Gibraltar Trail Construction, Republic Lake Ranger Districts, Page 2
PART I - THE SCHEDULE
SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS
SCHEDULE OF ITEMS
Amendment 0001
Gibraltar Trail Construction
Republic Ranger District
Ferry County, Washington
The quoter must quote on all items. Award will be on an all or none basis to quoter whose quote represents the best value to the Government, price and other factors considered (reference Section M). If quoter does not intend to charge for an item, an “O” or “No Cost” should be shown.
PAY ITEM
NO.
DESCRIPTION METHOD
OF
MEASURE
PAY
UNIT
EST.
QUANTITY
UNIT PRICE TOTAL
PRICE
BASE ITEMS
912B
911B
925B
926B
914B
951B
Excavation and
Embankment
Clearing and
Grubbing
Drainage Ditch
Armored Water
Crossing
Switchback
Mobilization
DQ
AQ
LSQ
Mile
Miel
LF
Each
Each
All
4.268
4.268
Total Quote for
Base Items
Amendment 0001, AG-05G1-S-13-0005 Gibraltar Trail Construction, Republic Lake Ranger Districts, Page 3
PAY
ITEM
NO.
DESCRIPTION METHOD OF
MEASURE
PAY
UNIT
EST.
QUANTITY
UNIT PRICE TOTAL
PRICE
OPTION ITEM*
912O
911O
Excavation and
Embankment
Clearing and
Grubbing
Grand Total
Quote for All
Items
00.942
00.942
*Reference FAR 52.217-7, Option for Increase Quantity. The Government may award total or only a portion of the option items based on available funding.
Designated Method of Measurement:
DQ – Designated Quantities. See Section 906.04(a)
AQ – Actual Quantities. See Section 906.04(c)
LSQ - Lump Sum Quantities. See Section 906.04(e)
Price Range
The Government’s estimate is between $25,000 and $100,000.
Payment Security
If the project is quoted with a total price greater than $30,000, payment security is required in the form of a
Payment Bond at 100% of the total project price. Reference Section I.
Notes: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed – Price
Construction Contracts shall not be in addition to the contract price. Include bond payments under 951
Mobilization.
Amendment 0001, AG-05G1-S-13-0005 Gibraltar Trail Construction, Republic Lake Ranger Districts, Page 4
FAR 52.217-7 Option for Increased Quantity – Separately Priced Line Item (MAR 1989)
The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor within October 31, 2014. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.
Central Contractor Registration (CCR) and Online Representatives and Certification Applications
(ORCA).
No award will be made to a Contractor not registered in the Central Contractor Registration (CCR) and the
Online Representations and Certification Application (ORCA) databases. Reference https://www.acquisition.gov.
Amendment 0001, AG-05G1-S-13-0005 Gibraltar Trail Construction, Republic Lake Ranger Districts, Page 5
Pen and Ink Changes:
Description of Work or Scope of Contract is hereby replaced with the following:
Description of Work or Scope of Contract
This project consists of the construction of a total of approximately 5.21 miles of trail with 4.268 miles advertised as base items and 0.942 miles advertised as option items. Construction of trail features include, but are not limited to armored water crossings and drainage ditches. Native materials found along or adjacent to the trail are available for use for all trail construction. If there is not material available onsite for the construction of the armored water crossings, material will be available at Nine Mile Pit as shown on site map. The goal of the project is to have a free-draining, self-maintaining trail.
All work shall be completed by October 31, 2014. All work shall be in conformance with the trail rehabilitation log, the drawings, and the USDA Forest Service – Region 6 U.S. Customary Specification for
Construction and Maintenance of Trails, Pacific Northwest Region - July 2005. The Contractor shall provide all tools, equipment, material, supplies labor, supervision, workman’s compensation, unemployment insurance, facilities, transportation and incidentals to perform all work necessary to accomplish the trail construction project.
The completion date of 60 calendar days from the notice to proceed is revised to October 31, 2014. Therefore, the following clause is revised:
FAR 52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984)
The Contractor shall be required to (a) commence work under this contract within ten calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than October 31, 2014. The time stated for completion shall include final cleanup of the premises.
Clause AGAR 452.236-75 Maximum Workweek – Construction Schedule (NOV 1996) located in Section F is hereby deleted.
Section J: The Trail Construction Log in the project drawings (drawing 3) is hereby replaced with the attached drawings.
Section J: The DOL Wage Determination No. WA 130001 dated April 12, 2013 is updated with DOL Wage
Determination No. WA 130001 dated April 19, 2013 (see attached determination).
File details come from the government source that posted it. Updated .