Attachment_for_question_8.PDF
PDF 5 MB Posted
- Attached to
- REVERSE OSMOSIS SYSTEM Federal contract opportunity
- Solicitation number
- AG-0521-S-15-0002
About this file
Question 8 attachment
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_for_question_9.pdf | ||
| Questions_answered.docx | DOCX document | |
| Attachment_for_question_4.pdf | ||
| water_quality_analysis.pdf | ||
| AG-0521-S-15-0002.pdf | ||
| REVERSE_OSMOSIS_SPECIFICATION.docx | DOCX document | |
| Evaluation_Factors.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UP
C D E F G H JA
B
W
PW
V
PW PW PW PW
W
P W
P W
P W
P W
P W
P W
P W
V V
VVV
V V
V
V V
V V V
VV
V
PW
2" UP TO S-4
UP TO 4" FCO
2" UP TO FD-2
UP TO 4" FCO
UP TO FCO
2" UP TO FD-2
2" PW UP TO FD-4
2" PW UP TO FD-4
UP TO FCO
2" V UP (TYP 4)
V UP (TYP 2)
2" UP TO FD-4 (TYP 3)
UP TO FCO (TYP 3)
UP TO FCO
2" UP TO
FD-3 (TYP 3)
2" V UP (TYP 3)
2" V UP
(TYP 4)
2" PW UP
2" V UP
2" UP TO FD-2
UP TO 4" FCO
2" UP TO FD-2
2" PW UP
2" V UP
PW PW PW PW
2" PW UP TO FD-2
2" PW UP TO FD-2
2" PW UP
2" V UP
UP TO 3" FCO
V UP
UP TO 4" FCO
3" DOMESTIC WATER, SEE CIVIL DRAWINGS
6" FIRE DEPT WATER CONNECTION, SEE
CIVIL AND FIRE PROTECTION DRAWINGS
6" FIRE PROTECTION WATER, SEE
CIVIL AND FIRE PROTECTION
DRAWINGS3"
4"
UP TO 4"
FCO
4"
4" P
W
3" UP TO FS-1
4"
P-200
V
2"
2"
2"
2"
2"
2"
2"
2"
2"
2"
2"
UP TO S-1
2" 2"
UP TO S-2
2" 2"2"
UP TO FD-2
4"
UP TO FD-1
3"
2"
2"
2"
2"
V
2"
3" 4"
3"
UP TO MS-1
2" 2"
4"
UP TO S-2
2"
4"
2" UP TO FD-4
UP TO 3" FCO
3"
3"
2" V UP
2" 2"
4"4"
4"
2" PW UP
SEE CIVIL DRAWINGS
FOR CONTINUATION
2"
2" PW UP
P W
FINSHED FLOOR EL. = 2581.64
I.E. = 2578.64
I.E. = 2576.64
I.E. = 2575.38 5
SEE CIVIL DRAWINGS
FOR CONTINUATION
CCWS/R UP, SEE
ENLARGED PLAN
2/MP-201
3"
3"
C C
W S
C C
W R
2"
UP TO FD-1 3
2"
C D
PW
V
4" UP TO
FCO
2" W UP TO FD-1
W/ TRAP PRIMER
W UP TO SH-1
W UP TO WC-1
W UP TO CW-1
UP TO FD-1 W/
TRAP PRIMER
UP TO ESE-1
UP TO
FCO
UP TO S-6
UP TO L-1
2" UP TO FD-1 W/
TRAP PRIMER
UP TO S-3
4"
4"
2"
2"
2"
4"
4"
2" 2" VENT UP
2" UP TO S-5
2"
4"
2"
2"
UP TO L-12"
2" PW UP
2"
2" V UP
4"
2" V UP
2"
UP TO S-1
2"
2"
2"
2"P W
P W
P W
P W
PW
4"
W W
W W
W
W
W
W
W
PW
W
UP TO WC-1
4"
2"
2" VENT UP
S
R
E
F O
R P
SS
E
OI AN L
G E
R
S T
A T
IS ET
F O
WA
N
N G
E
N
ED
E I
N T O
G
E R
I H
39561
M A R K
E . GA
R
D N E R
STAMP
REVISION NO. DATE
KEY PLAN - (NTS)
SHEET NUMBER
DRAWING TITLE
SCALE
DATE
PROJECT NUMBER
ISSUANCE
TRUE
NORTH
PLAN
NORTH
As indicated
P-200
11/24/2014
100% CONSTRUCTION DOCUMENTS
WASHINGTON
GRAINS PLANT
GROWTH FACILITY
WASHINGTON STATE UNIVERSITY
Pullman, WA
FOUNDATION WASTE AND
VENT PLAN
1/8" = 1'-0"1
FOUNDATION WASTE AND VENT
1/4" = 1'-0"2
ENLARGED RESTROOM AREA
FOUNDATION WASTE AND VENT PLAN
KEY NOTES
RELOCATE EXISTING FLOOR DRAIN TO OUTSIDE OF NEW SEED STORAGE
CHAMBER. CUT AND PATCH EXISTING FLOOR SLAB AS REQUIRED.
PROVIDE RUNNING TRAP LOCATED OUTSIDE OF THE FOOTPRINT OF THE
GROWTH CHAMBERS. COORDINATE LOCATION OF TRAP WITH RESPECT TO
EQUIPMENT/CABINETRY IN THE ROOM WHERE THE TRAP IS LOCATED. SEE
DETAIL 11/P-501.
PROVIDE TRAP PRIMER CONNECTION.
DN
C D E F G H JA
B
FD-3
FD-4
FD-4
FD-4
FD-2
FD-4
FD-4
FD-2
FD-2
FD-2FD-2FD-2
FD-2
FD-3
FD-3
FD-4
FCO
FCO
FCO
FCO
FCO
FCO
FCO
FCO
4" VTR
V
PW PW
P W
P W
P W
P W
PW
P W
P W
P W
P W
PW
PW
P W
P W
V
V
V V V V V V
P W
FCO
V
V V V V
V
V
V
VV
V
2' PW UP TO FD-6
2" PW UP TO FD-5
2" PW DN
2" V DN
FCO
PW UP TO FD
2" PW DN
2" V DN
2" PW UP TO FD-5
2" PW UP
TO FD-5
V UP (TYP 2)
2" V DN (TYP 4)
2" V UP
(TYP 3)
2" PW UP TO FD-5
2" PW UP TO FD-5
2" PW DN
2" V DN
2" PW UP TO FD-5
2" PW UP TO FD-5
2" PW UP TO FD-5
2" V DN
(TYP 2)
2" V DN (TYP 3)
V DN (TYP 4)
V UP
(TYP 2)
2" V DN
2" V UP
(TYP 3)
2" PW UP TO FD-5
FCO
P W
S-1
S-2
MS-1
S-2
FS-1
ESE-1
S-4
P-201
(E) FD
FD-1
2" V UP (TYP 3)
4"
2"
4"
3"
2"
2"
P W
2"
2"
2" V UP
2"
CO
2"
CO
2"
2"
3"
2"
2"
FCO
2"
2"
2"
2"
2"
2"
2" PW UP TO FD-5
2"
2"
2 1/2"
CO CO CO CO
2"
2"
2"
2" 2"
2"
2" 2"
2 1/2"
2" 2"
2"
2"
2"
2"
2"
2"
2" PW DN
PW
2" V UP
2" UP TO
FD-6
2"
2" PW UP
TO FD-5
FD-3
2" PW UP
TO FD-5
2" PW UP
TO FD-5
2"
FD-1
HAPLOID LAB
A11B
CHEMICAL
A5
RECEIVING
A16
MECHANICAL
A19
HALLWAY
A10E
UNISEX WC
A7
UNISEX WC
A11A
WORK ROOM
A22
GROWTH
CHAMBERS
A17
POT WASH
A11
PREP
A11
STAIRWELL
A100S
SOILS
A10A
THRESHING
ROOM
A10HERBICIDE ROOM
A4
STORAGE
A20
SEED STORAGE
A1
JANITOR
A12
HALLWAY
A10W
LOCKERS
A3
C D
FD-1
FD-1
FCO
V V
V
V DN
2" PW UP TO FD-5
FD-1
L-1
S-5
S-1
SH-1
L-1 S-3
CW-1
1 1/2" 2" 2"
2"
2 1/2"
4"
2"
2"
2" PW DN
1 1/2"
2"
2"
S-6
4"
WC-1
2"
HAPLOID LAB
A11B
CHEMICAL
A5
UNISEX WC
A7
UNISEX WC
A11A
S
R
E
F O
R P
SS
E
OI AN L
G E
R
S T
A T
IS ET
F O
WA
N
N G
E
N
ED
E I
N T O
G
E R
I H
39561
M A R K
E . GA
R
D N E R
STAMP
REVISION NO. DATE
KEY PLAN - (NTS)
SHEET NUMBER
DRAWING TITLE
SCALE
DATE
PROJECT NUMBER
ISSUANCE
TRUE
NORTH
PLAN
NORTH
As indicated
P-201
11/24/2014
100% CONSTRUCTION DOCUMENTS
WASHINGTON
GRAINS PLANT
GROWTH FACILITY
WASHINGTON STATE UNIVERSITY
Pullman, WA
FIRST FLOOR WASTE AND
VENT PLAN
1/8" = 1'-0"1
FIRST FLOOR WASTE AND VENT
1/4" = 1'-0"2
ENLARGED RESTROOM AREA FIRST
FLOOR WASTE AND VENT PLAN
KEY NOTES
RELOCATE EXISTING FLOOR DRAIN TO OUTSIDE OF NEW SEED STORAGE
CHAMBER. CUT AND PATCH EXISTING FLOOR SLAB AS REQUIRED.
PROVIDE RUNNING TRAP LOCATED OUTSIDE OF THE FOOTPRINT OF THE
GROWTH CHAMBERS. COORDINATE LOCATION OF TRAP WITH RESPECT TO
EQUIPMENT/CABINETRY IN THE ROOM WHERE THE TRAP IS LOCATED. SEE
DETAIL 11/P-501.
PROVIDE TRAP PRIMER CONNECTION.
B
FD-5FD-5
FD-5FD-5FD-5FD-5
FD-5FD-5
FD-5FD-5FD-5FD-5
FD-6
VVVVVV
V
3"2"
3" V UP, TERMINATE 3'
ABOVE TOP OF LOUVER
2" V DN
3"2 1/2"
2"2"
2" 2 1/2"
2" V DN (TYP 3)2" V DN (TYP 3)2" V DN (TYP 2)2" V DN (TYP 2)
2"2"
2"
2" V DN (TYP 2)
2"
2" V DN
4" VTR
FD-6
2" VTR
P-501
TYP.
FD-5FD-5FD-5
WEST
CONNECTOR
A100W
CORRIDOR
A100
GH - 1
A101
GH - 3
A103
GH - 5
A105
GH - 7
A107
GH - 9
A109
GH - 11
A111
GH - 12
A112
GH - 10
A110
GH - 8
A108
GH - 6
A106
GH - 4
A104
GH - 2
A102
S
R
E
F O
R P
SS
E
OI AN L
G E
R
S T
A T
IS ET
F O
WA
N
N G
E
N
ED
E I
N T O
G
E R
I H
39561
M A R K
E . GA
R
D N E R
STAMP
REVISION NO. DATE
KEY PLAN - (NTS)
SHEET NUMBER
DRAWING TITLE
SCALE
DATE
PROJECT NUMBER
ISSUANCE
TRUE
NORTH
PLAN
NORTH
1/8" = 1'-0"
P-202
11/24/2014
100% CONSTRUCTION DOCUMENTS
WASHINGTON
GRAINS PLANT
GROWTH FACILITY
WASHINGTON STATE UNIVERSITY
Pullman, WA
SECOND FLOOR WASTE
AND VENT PLAN
1/8" = 1'-0"1
SECOND FLOOR WASTE AND VENT
C D E F G H JA
B
HAPLOID LAB
A11B
CHEMICAL
A5
RECEIVING
A16
MECHANICAL
A19
HALLWAY
A10E
UNISEX WC
A7
WORK ROOM
A22
GROWTH
CHAMBERS
A17
POT WASH
A11
PREP
A11
SOILS
A10A
THRESHING
ROOM
A10
HERBICIDE ROOM
A4
STORAGE
A20
SEED STORAGE
A1
P-203
1 1/2"
RO
IHW
ICW
1 1/2"
1/2"1/2"
1/2"
1/2"
3/4"
1/2" 1/2"
3/4"
3/4"
3/4"
CW
HW
P-203
FW
TW
S-2
IHW
ICW
TW
HB-1
S-1
HB-2
HB-2
HB-1
MS-1
S-2
DOWN TO AUTOCLAVE
HB-1
S-4
3/4" RO UP
ESE-1
1" TW DN
TO ESE-1
HB-1
IHWC
HWC
3/4"
1 1/2" 3/4"
3/4"
1 1/2" 1 1/4"
3/4" 3/4"
1 1/2"
3/4"
3/4"
3/4"
1/2"
1/2"
HB-2 +48"2
+48"
1 1/2"
3/4"
1"
1 1/4"
1 1/2"
1 1/2"
3/4" 3/4"
+48" 1 1/4"
1 1/2" 1 1/2"
1"
1/2"
3/4" 1"
1/2"
1 1/4"
3/4"
RO
IHW
ICW
CW
HW
TW
IHWC
HWC
1 1/2"
3/4"
1" 3/4"
1"
3/4"
3/4"
3/4"
1 1/2"
3/4"
3/4" 3/4"
1 1/4"
3/4"
3/4"
3/4" 3/4"
3/4"
3/4" 3/4"
3/4"
TP-1
TO 3 TRAPS
3/4"
3/4"
3/4"
UNISEX WC
A11A
R O
IH
W
IC
W R
O
H J
MECHANICAL
A19
DOMESTIC AND
INDUSTRIAL WATER
SERVICE & RPBP'S
3" WATER DN, SEE SHEET
P-200 FOR CONTINUATION
6" FDC DN, SEE SHEET P-
200 FOR CONTINUATION
WH-1
WH-2
(IHW)
(DOM. HW)
CW
ICW
C W
H W
H W
C
IH
W
C
IH
W
T W
IC
W
1 1/2"
1/2"
3/4"
1 1/2"
C W
H W
H W
C
T W
1 1/2"
1 1/2"
RCP-1
IN RISER
MV-1
MV-2
2"
IH
W
C
IH
W
IC
W
IH
W
C
IH
W
RCP-2
IN RISER
MV-3
3/4"
ICW
HB-1
1 1/2"
1 1/2"
1 1/4" 3/4"
3/4"
1 1/4"
RO SYSTEM
PRETREATMENT
RO
STORAGE
BP-2
BP-1
FERTILIZER TANK
1 1/2"
IC
W
P-501
P-501
FERTILIZER
INJECTOR PUMPP-501
P-501
FD-3
FD-3
FD-3
TP-1 TO 4 TRAPS
HB-2 36" AFF
3/4"
6" FP RISER, SEE SHEET P-
200 FOR CONTINUATION
FD-3
3/4" 3/4"
IH
W
IC
W
HB-2
+48"
3/4"
1 1/2"
1 1/2"
RO GENERATORS SEE DETAIL 11/P-501 FOR
RO SYSTEM PIPING DETAIL
RO SYSTEM DESCALENT
DD
S-6
S-3
S-5
TW
ICW
IHW
S-1
L-1
SH-1
WC-1
CW/HW DN TO
L-1
CW-1
1/2"1/2"
IH
W
IC
W
1/2" 1/2"
1 1/2"
3/4"
1/2"
1 1/4"
3/4"
3/4"
1 1/2"
R O
IH
W
IC
W
IH
W
C
3/4"
3/4" 3/4"
3/4"
3/4"
1/2"
3/4"
1/2"
3/4" 3/4"
1/2"
1T W
IH
WIC
W
T W
TP-1
3/4"
TO 4 TRAPS
HAPLOID ROOM
A11B
CHEMICAL ROOM
A5
UNISEX WC
A11A
UNISEX WC
A7
WC-1
S
R
E
F O
R P
SS
E
OI AN L
G E
R
S T
A T
IS ET
F O
WA
N
N G
E
N
ED
E I
N T O
G
E R
I H
39561
M A R K
E . GA
R
D N E R
STAMP
REVISION NO. DATE
KEY PLAN - (NTS)
SHEET NUMBER
DRAWING TITLE
SCALE
DATE
PROJECT NUMBER
ISSUANCE
TRUE
NORTH
PLAN
NORTH
As indicated
P-203
11/24/2014
100% CONSTRUCTION DOCUMENTS
WASHINGTON
GRAINS PLANT
GROWTH FACILITY
WASHINGTON STATE UNIVERSITY
Pullman, WA
FIRST FLOOR WATER
PIPING PLAN
1/8" = 1'-0"1
FIRST FLOOR WATER PIPING PLAN
1/4" = 1'-0"2
ENLARGED MECHANICAL ROOM WATER
PIPING PLAN
1/4" = 1'-0"3
ENLARGED RESTROOM AREA PLUMBING
PLAN
KEY NOTES
3/4" RO UP THROUGH ROOF TO CONNECT TO EVAPORATIVE
COOLING UNITS (BY OTHERS). PROVIDE DRAIN VALVE WITH HOSE
CONNECTION AT BOTTOM OF RISER.
PROVIDE PVC BALL VALVE AND HOSE END CONNECTION AT
FERTILIZED WATER (FW) TERMINATION. 48" AFF.
TERMINATE AT 72" AFF WITH BALL VALVE AND CAP FOR
CONNECTION TO EQUIPMENT BY OTHERS.
TERMINATE AT 36" AFF WITH BALL VALVE AND CAP FOR
CONNECTION TO EQUIPMENT BY OTHERS.
ROUTE 1 1/4" ICW, 1 1/4" RO AND 1 1/4" FW UP THROUGH FLOOR
ABOVE TO SERVE GREENHOUSES. SEE FLOOR PENETRATION
DETAIL 4/P-501. (SIMILAR)
PROVIDE BALL AND CAP FOR CONNECTION TO EQUIPMENT BY
OTHERS. VERIFY CONNECTION SIZE AND LOCATION.
ROUTE IHW, ICW, AND TW DOWN WING WALL TO SERVE S-1 AND
S-2.
KEY NOTES
ROUTE 3/4" RO DOWN TO 72" AFF. PROVIDE BALL VALVE AND
CAP FOR CONNECTION TO LAB EQUIPMENT BY OTHERS.
B
3/4" FW AND
ICW (STACKED)
HB-2
+48" TYP
HB-2
+48" TYP
3/4" FW, ICW
AND RO
+48" TYP
+48" TYP
+48" TYP
3/4" FW, ICW AND
RO (STACKED)
+48" TYP
3/4" FW AND
ICW (STACKED)
+48" TYP
+48" TYP
3/4" FW, ICW
AND RO
HB-2
+48" TYP
HB-2
1 1/4" 1 1/4"
1 1/2"
3/4" 3/4" 3/4"
RO
FW
ICW
RO
FW
ICW
RO
FW
ICW
3/4" 3/4" 3/4" 3/4"+24"
HB-2+24"
R O
IC
W
F W
3/4"
3/4"
3/4"
EVAP COOLER BY OTHERS (TYP 2)
(E) 3/4" ICW VALVED
AND CAPPED
HB-1
TP-1 TO FD-6 IN PASSAGE
TP-1
TO FD-6 IN
CONNECTOR
3/4" FW AND
ICW (STACKED)
HB-2
+48" TYP
3/4" 3/4"
+48" TYP
3/4"
HB-2
+48" TYP
HB-2
HB-2
+48" TYP
+48" TYP
3/4" FW, ICW
AND RO
+48" TYP
+48" TYP
3/4" FW, ICW
AND RO
HB-2
+48" TYP
3/4" 3/4"
HB-2
+48" TYP
+48" TYP
3/4" FW, ICW
AND RO
+48" TYP
3/4" FW AND
ICW (STACKED)
3/4" 3/4"
+48" TYP
3/4"
HB-2
+48" TYP
HB-2
+48" TYP
3/4" FW, ICW AND
RO (STACKED)
3/4" FW AND
ICW (STACKED)
HB-2
+48" TYP
3/4" 3/4"
3/4" FW AND
ICW (STACKED)
ARGUS PANELS (TYP)
3/4" 3/4"
3/4"
1" 1"
1"
1" 1" 1"
1" 1" 1"
1" 1" 1"
WEST
CONNECTOR
A100W
CORRIDOR
A100
GH - 1
A101
GH - 3
A103
GH - 5
A105
GH - 7
A107
GH - 9
A109
GH - 11
A111
GH - 12
A112
GH - 10
A110
GH - 8
A108
GH - 6
A106
GH - 4
A104
GH - 2
A102
S
R
E
F O
R P
SS
E
OI AN L
G E
R
S T
A T
IS ET
F O
WA
N
N G
E
N
ED
E I
N T O
G
E R
I H
39561
M A R K
E . GA
R
D N E R
STAMP
REVISION NO. DATE
KEY PLAN - (NTS)
SHEET NUMBER
DRAWING TITLE
SCALE
DATE
PROJECT NUMBER
ISSUANCE
TRUE
NORTH
PLAN
NORTH
1/8" = 1'-0"
P-204
11/24/2014
100% CONSTRUCTION DOCUMENTS
WASHINGTON
GRAINS PLANT
GROWTH FACILITY
WASHINGTON STATE UNIVERSITY
Pullman, WA
SECOND FLOOR WATER
PIPING PLAN
1/8" = 1'-0"1
SECOND FLOOR WATER PIPING PLAN
KEY NOTES:
PROVIDE 3/4" IFW BALL VALVE (PVC) WITH HOSE THREAD ADAPTER ON DISCHARGE AT 48" AFF.
PROVIDE 3/4" ICW AND FW BALL VALVES AND PIPE CAPS AT 28" AFF FOR FUTURE IRRIGATION
SYSTEM.
PROVIDE 3/4" RO BALL VALVE AND PIPE CAP AT 60" AFF FOR CONNECTION TO EVAPORATIVE
COOLING SYSTEM BY OTHERS.
ROUTE 1 1/4" ICW, 1 1/4" FW AND 1 1/4" RO UP THROUGH FLOOR SLAB FROM 1ST FLOOR. SEE
DETAIL 4/P-501 (SIMILAR) FOR FLOOR PENETRATION. SEE P-203 FOR CONTINUATION.
ROUTE 3/4" RO UP THROUGH ROOF TO CONNECT TO EVAPORATIVE COOLERS, BY OTHERS.
PROVIDE 3/4" RO BALL VALVE AND CAP FOR CONNECTION TO EVAP COOLING UNIT, BY OTHERS.
PROVIDE DRAIN VALVE WITH HOSE END TO DRAIN PIPING AND COOLING UNIT.
CONNECT 3/4" ICW TO (E) 3/4" ICW AND ROUTE DOWN TO HB-1.
AS SHOWN
11/24/2014
100% CONSTRUCTION DOCUMENTS
WASHINGTON
GRAINS PLANT
GROWTH FACILITY
WASHINGTON STATE UNIVERSITY
Pullman, WA
STAMP
REVISION NO. DATE
KEY PLAN - (NTS)
SHEET NUMBER
DRAWING TITLE
SCALE
DATE
PROJECT NUMBER
ISSUANCE
TRUE
NORTH
PLAN
NORTH
P-601
PLUMBING SCHEMATICS
FIRST FLOOR
PROCESS WASTE AND VENT PIPING RISER DIAGRAM - NORTH BRANCH
NOT TO SCALE
SECOND FLOOR
MECHANICAL
ROOM
4"FCO2"FCO4"FCO
FIRST FLOOR
SECOND FLOOR
ROOF
2"V
4"FCO
S-1S-5
FD-2 FD-4
WORKROOM
3"FCO
FD-2 FD-2FD-2FD-2
4"FCO
PROCESS WASTE AND VENT PIPING RISER DIAGRAM -SOUTH BRANCH
NOT TO SCALE
FIRST FLOOR
SANITARY WASTE AND VENT PIPING RISER DIAGRAM
NOT TO SCALE
SECOND FLOOR
TOILET
ROOM
4"FCO4"FCO
FD-3FD-3FD-3FD-4FD-4FD-4FD-2FD-1FS-1FD-2FD-4
3"FCO
FD-4
S-2
4"FCO
MS-1
S-2 S-1
FD-5 FD-5 FD-5 FD-5FD-5FD-5FD-5FD-5FD-5FD-5FD-5FD-5FD-6
S-4
GROWTH ROOMSPOT WASH GROWTH ROOMS
GREENHOUSES
RECEIVETHRESHHERB
SEE NORTH BRANCH
RISER DIAGRAM FOR
CONTINUATION
(52 FU)
SEE SOUTH BRANCH
RISER DIAGRAM FOR
CONTINUATION
FD-1
S-6S-3
FD-1
WC-1
L-1
SH-1WC-1FD-1
L-1CW-1
TOILET
ROOM
ESE-1
SEE SANITARY RISER
DIAGRAM FOR CONTINUATION
SEE PROCESS WASTE RISER
DIAGRAMS FOR CONTINUATION
SEE PROCESS WASTE RISER
DIAGRAMS FOR CONTINUATION
4" VTR
4" VTR
3" VENT THROUGH WALL
WITH ELBOW UP
(32 FU)
HAP LAB
CHEM
NOTE: THIS VENT IS COMMON
TO ALL DIAGRAMS, PROCESS
WASTE AND SANITARY WASTE
NOTE: THIS VENT IS COMMON
TO ALL DIAGRAMS, PROCESS
WASTE AND SANITARY WASTE
NOTE: THIS VENT IS COMMON
TO ALL DIAGRAMS, PROCESS
WASTE AND SANITARY WASTE
4" W
4" W
FD-5
SEE SOUTH BRANCH RISER
DIAGRAM FOR CONTINUATION
SEE NORTH BRANCH
RISER DIAGRAM FOR
CONTINUATION
2"V
2"V
2"W (6 FU)2"W (4 FU)
2"W (10 FU)2"V (5 FU)
2"V (6 FU)
2"V (12 FU)
2"V (6 FU)
2"W (4 FU) 2"W (6 FU)
2"V (4 FU)
2"V (4 FU)
2"V (10 FU)
2"V (6 FU)
2"W (4 FU)
2"W
2"V (4 FU)2"V
2-1/2"V (6 FU) 2-1/2"V (16 FU) 3"V (28 FU)
TERMINATE 3" VENT
MINIMUM 3' ABOVE
WALL LOUVER
2"V2"W (8 FU)
2"V 3"W
2"V
2"V 2"W (10 FU)
2"W
3"W (5 FU)
2"V 1-1/2"V
2"V (5 FU)
2"W
2"V (7 FU)2"V (17 FU)
3"W (7 FU)3"W (17 FU)3"W (19 FU)3"W (21 FU)4"W (31 FU)4"W (34 FU)4"W (36 FU)4"W (44 FU)
4"W (96 FU)
2"W
2"V
4"W (49 FU)
4"W (43 FU) 4"W (2 FU)
2"V (8 FU)
2-1/2"V (23 FU)
4"W (8 FU)4"W (14 FU)
2"W (6 FU)2"W (4 FU)
4"W (18 FU)4"W (30 FU)
2"V (12 FU)2"V (2 FU)
2"V (14 FU)
2"V (16 FU)
4"W (34 FU)4"W (36 FU)4"W (41 FU)
4"W (47 FU) 4"W (4 FU) 4"W
2"W
4"W (52 FU)
4"W (98 FU)4"W (100 FU)
4"W (2 FU)
2"W
4"W (7 FU)4"W (9 FU)4"W (13 FU)4"W
(16 FU)
4"W (19 FU)4"W (21 FU) 4"W
(15 FU)4"W (21 FU)
2"V (8 FU)
(2 FU)
(4 FU)
(1 FU)
(2 FU)(4 FU)(2 FU)
(1 FU)(3 FU)
(2 FU)
2"V (15 FU)2"V (21 FU)2-1/2"V
(27 FU)
2"V
(24 FU)
(2 FU) (2 FU) (2 FU)(2 FU)(2 FU)(2 FU)(2 FU)(2 FU)(6 FU)(2 FU)(2 FU)(2 FU)(2 FU)(2 FU)(2 FU)
(2 FU) (3 FU)(2 FU)(3 FU) (2 FU)
3"W (12 FU) 2"W (4 FU)
(2 FU)
(2 FU)
(2 FU)
(2 FU)
(3 FU)
(2 FU) (2 FU) (2 FU)
(2 FU)(2 FU) (2 FU) (2 FU) (2 FU) (2 FU) (2 FU) (2 FU) (2 FU) (2 FU) (2 FU) (2 FU)
(2 FU) (3 FU)
2"V (8 FU)
2"V
(15 FU)
2"V (6 FU)
2-1/2"V (23 FU)
2"V (4 FU)
2-1/2"V (27 FU)2-1/2"V (32 FU)
2"V (16 FU)
3"V (48 FU)3"V (50 FU)
2"V (5 FU)
2"V (5 FU)
3"V (55 FU)
2-1/2"V (27 FU)
4"V (82 FU)
2"V (2 FU)2"V (3 FU)
4"V (87 FU)4"V (89 FU) 4"V (84 FU)
4"V (89 FU)
2"V (7 FU)2"V (2 FU)
2"V (17 FU) 2"V (15 FU)
2"V (5 FU)
2-1/2"V (27 FU)2-1/2"V (32 FU)3"V (48 FU)
2"V (2 FU)
3"V (50 FU)3"V (55 FU)4"V (84 FU)4"V (87 FU)
2-1/2"V (27 FU)2"V (2 FU)
4"V (82 FU)
3"V (55 FU)4"V (84 FU)
3"W 3"W 3"W
3"W (6 FU)2"W (4 FU)
FD-5
(2 FU)
2"W (4 FU)2"W (4 FU)
FD-5
(2 FU)
FD-5
(2 FU)
2"V 2"V
4"W
FD-1
(2 FU)
4"W (38 FU)
2"V 2"V
2"V (8 FU)
FD-3
(2 FU)
4"W (6 FU)
100% CONSTRUCTION DOCUMENTS
WASHINGTON
GRAINS PLANT
GROWTH FACILITY
WASHINGTON STATE UNIVERSITY
Pullman, WA
STAMP
REVISION NO. DATE
KEY PLAN - (NTS)
SHEET NUMBER
DRAWING TITLE
SCALE
DATE
PROJECT NUMBER
ISSUANCE
TRUE
NORTH
PLAN
NORTH
P-602
PLUMBING SCHEMATICS
FIRST FLOOR
DOMESTIC HOT AND COLD WATER PIPING RISER DIAGRAM (POTABLE)
NOT TO SCALE
SECOND FLOOR
FIRST FLOOR
SECOND FLOOR
ROOF
S-2
SEE INDUSTRIAL WATER RISER
DIAGRAM FOR CONTINUATION
EMERGENCY
EYEWASH
S-2
EMERGENCY
EYEWASH
S-5
EMERGENCY
EYEWASH
CW-1L-1WC-1
SH-1
L-1 WC-1
ESE-1
TWTW
INDUSTRIAL (LAB) HOT AND COLD WATER PIPING RISER DIAGRAM (NON-POTABLE)
NOT TO SCALE
SEE DOMESTIC WATER RISER
DIAGRAM FOR CONTINUATION
FERTILIZER INJECTOR
AND MIX TANK
ICWICW
IHW
FW
HB-1S-2S-1HB-1HB-2HB-2S-2
VALVE AND CAP
FOR CONNECTION
TO AUTOCLAVE
(BY OTHERS)
MS-1HB-1HB-1S-1S-5
S-3
EMERGENCY
EYEWASH
S-4
EMERGENCY
EYEWASH
S-3S-6S-4HB-1 HB-2
FW
ICW
HB-2 HB-2
HB-2 HB-2
HB-2HB-2
FW
ICW
HB-2HB-2
HB-2 HB-2
HB-2 HB-2
HB-2 HB-2
HB-2 HB-2
FW
ICW
FW
ICW
HB-2HB-2
HB-2HB-2
FW
ICW
FW
HB-2
HB-2
FW
ICW
FW
ICW
ICW
FW
ICW
HB-2
HB-2
FW
ICW
FW
ICW
1 3/4" PVC BALL VALVE WITH HOSE ADAPTOR ON DISCHARGE, ON FW PIPING.
NOTES:
1 1
1 1 1 1
1 1 1 1
1 1 1 1
1 1
1 1
1 1 1
FIRST FLOOR
SECOND FLOOR
ROOF
REVERSE OSMOSIS (RO) WATER PIPING RISER DIAGRAM
NOT TO SCALE
RO WATER
GENERATORS
RO
AUTOCLAVE
(BY OTHERS)
RO
RO
RO
RO
RO RO
WATER POLISHER
(BY OTHERS)
SPRAY CABINET
(BY OTHERS)
WATER POLISHER
(BY OTHERS)
GROWTH CHAMBER AREA
(EQUIPMENT BY OTHERS)
750 GALLON
STORAGE TANK
CARBON
FILTER
WATER SOFTENER
AND BRINE TANK
GREENHOUSE COOLING SYSTEMS
(BY OTHERS)
GREENHOUSE COOLING SYSTEMS
(BY OTHERS)
CONNECTOR COOLING UNITS
(ON ROOF)
10"x42" SUMP (14 GAL) AND
PUMP FOR AEROTECH
COOLING SYSTEM
(TYPICAL OF 12)
VALVE AND CAP FOR
CONNECTION TO EVAP
COOLING UNITS ON ROOF.
27 GPH MAX. (0.45 GPM)
(TYPICAL OF 2)
VALVE AND CAP FOR
CONNECTION TO EVAP
COOLING SYSTEMS
78 GPH MAX. (1.3 GPM)
(TYPICAL OF 12)
PROVIDE DRAIN VALVE
WITH HOSE END
CONNECTION FOR
SEASONAL DRAIN-DOWN
(1.5 GPM) (1.5 GPM) (1.5 GPM) (1.5 GPM) (1.5 GPM)(30 GPM)
(4 FU)(1 FU)(5 FU)(5 FU)(1 FU)
(2 FU)
TW
(3 FU)(3 FU)(3 FU)(2 FU)(3 FU)(2.5 FU) (1 FU) (1 FU) (3 FU) (3 FU) (1 FU) (1 FU) (1 FU) (1 FU) (1 FU) (1 FU) (3 FU) (3 FU) (1 FU)
(1 FU)(1 FU)(1 FU)(1 FU)
(2.5 FU)
(1 FU)
(1 FU) (1 FU)
(1 FU) (1 FU)
3/4"
3/4"
3/4"
(1 FU)
(1 FU)
(1 FU)
(1 FU)
(1 FU)
(3.5 FU)
3/4" 3/4"
1"
(5.5 FU)
1" (7.5 FU)
(1 FU)
(1 FU)
(1 FU)
(1 FU)
(1 FU)
(1 FU)
(1 FU)
1-1/4" 3/4"
1-1/4"
(21.5 FU)
(1 FU)
(1 FU) (1 FU)
(1 FU)
(1 FU)
(1 FU)
(1 FU)
(1 FU)
3/4" 3/4"
1"
(5.5 FU)
(1 FU)
(1 FU)
(1 FU)
(1 FU)
(1 FU)
3/4" 3/4"
1"
(5.5 FU)
(1 FU)
(1 FU)(1 FU)
(1 FU)
(1 FU)
(1 FU)
(1 FU)
(1 FU)
3/4" 3/4"
1"
(5.5 FU)
(1 FU)
(1 FU)
(1 FU)
(1 FU)
(1 FU)
3/4" 3/4"
1"
(5.5 FU)
1" (11.5 FU) 1" (11.5 FU) 1" (7.5 FU)
(23.5 FU)
1-1/4"
(25.5 FU)
VALVE AND CAP FOR
CONNECTION TO TRACK
SPRAY CABINET.
2 GPM MAX.
VALVE AND CAP FOR
CONNECTION TO WATER
POLISHER.
2 L/M (0.5 GPM)
VALVE AND CAP FOR
CONNECTION TO AUTOCLAVE
1 GPM MAX.
4 GPH AT 60 PSI
(.07 GPM)
4 GPH AT 60 PSI
(.07 GPM)
6 GPH AT 60 PSI
(0.10 GPM)
4 GPH AT 60 PSI
(.07 GPM)
1 GPH AT 60 PSI
(.02 GPM)
BP-1
BP-2
ICW
3/4"
1-1/4"
1"
3/4"
1"
3/4"
1-1/4"
1" 1"
3/4" 3/4"
3/4"
3/4" 3/4"
3/4"
3/4"
1/2" 1/2"
3/4"
1/2"
3/4" 3/4"
3/4"
1-1/2"
3/4" 3/4"
1-1/2"
1-1/2"
3/4"
3/4"
3/4" (5.5 FU)
3/4"
(3.75 FU)
3/4" (6 FU) 1" (8.5 FU)
3/4"
(4.5 FU)
1" (10.5 FU) 1" (13 FU)
(1 GPM) (15 GPM)
3/4"
1" (12.75 FU) 1" (17.25 FU)
3/4" (3.25 FU)
1" (17.25 FU)
1-1/4" (34.5 FU)
1"
1-1/2" (60 FU)
1" (16 FU)
1-1/4" (27.5 FU) 1-1/2" (63 FU)
3/4" (4.5 FU)
3/4" (5.5 FU)
1-1/4" (27.5 FU)
1-1/4" (20.5 FU) 1-1/2" (69.5 FU)1" (16 FU)
3/4"
2" (84.5 FU)
3/4"
1-1/2" (33 GPM)3/4" (2.25 FU) 3/4" (2.25 FU)1-1/4" (5.75 FU) 1-1/2" (7.25 FU)
3/4" (6 FU)
1-1/2" (16 FU)
3/4" 3/4"
2" (91 FU)1-1/4" (20.5 FU)
1"
1"
1-1/4"
3/4"
1-1/2" (37.5 GPM) 1-1/2" (16 FU) 2"
3" CW. SEE CIVIL DRAWINGS
FOR CONTINUATION
3" CW. SEE CIVIL DRAWINGS
FOR CONTINUATION
1" 3/4"
1-1/2"
1-1/2" 1"
3/4"
3/4"
P-501
P-501
P-501
P-501
MV-1
MV-2
MV-3
P-501
CaCO3 FILTER
100% CONSTRUCTION DOCUMENTS
WASHINGTON
GRAINS PLANT
GROWTH FACILITY
WASHINGTON STATE UNIVERSITY
Pullman, WA
STAMP
REVISION NO. DATE
KEY PLAN - (NTS)
SHEET NUMBER
DRAWING TITLE
SCALE
DATE
PROJECT NUMBER
ISSUANCE
TRUE
NORTH
PLAN
NORTH
P-701
PLUMBING EQUIPMENT
SCHEDULES
| P-200 - FOUNDATION WASTE AND VENT PLAN |
| P-201 - FIRST FLOOR WASTE AND VENT PLAN |
| P-202 - SECOND FLOOR WASTE AND VENT PLAN |
| P-203 - FIRST FLOOR WATER PIPING PLAN |
| P-204 - SECOND FLOOR WATER PIPING PLAN |
| P-501 MECHANICAL DETAILS-P-501 |
| P-601 PLUMBING SCHEMATICS-P-601 |
| P-601 PLUMBING SCHEMATICS |
| P-601 |
| P-602 PLUMBING SCHEMATICS-P-602 |
| P-602 PLUMBING SCHEMATICS |
| P-602 |
| P-701 PLUMBING SCHEDULES-P-701 |
| P-701 PLUMBING SCHEDULES |
| P-701 |
File details come from the government source that posted it. Updated .