Attachment_for_question_4.pdf

PDF 5 MB Posted

Attached to
REVERSE OSMOSIS SYSTEM Federal contract opportunity
Solicitation number
AG-0521-S-15-0002
Issued by
Department of Agriculture Agricultural Research Service Field Research Implementation and Information Delivery Pacific West Area

About this file

Question 4 attachment

View the file

Other files for this federal contract opportunity

Other files attached to REVERSE OSMOSIS SYSTEM, newest first.
File Type Posted
Attachment_for_question_9.pdf PDF
Questions_answered.docx DOCX document
Attachment_for_question_8.PDF PDF
water_quality_analysis.pdf PDF
AG-0521-S-15-0002.pdf PDF
REVERSE_OSMOSIS_SPECIFICATION.docx DOCX document
Evaluation_Factors.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UP

C D E F G H JA

B

W

PW

V

PW PW PW PW

W

P W

P W

P W

P W

P W

P W

P W

V V

VVV

V V

V

V V

V V V

VV

V

PW

2" UP TO S-4

UP TO 4" FCO

2" UP TO FD-2

UP TO 4" FCO

UP TO FCO

2" UP TO FD-2

2" PW UP TO FD-4

2" PW UP TO FD-4

UP TO FCO

2" V UP (TYP 4)

V UP (TYP 2)

2" UP TO FD-4 (TYP 3)

UP TO FCO (TYP 3)

UP TO FCO

2" UP TO

FD-3 (TYP 3)

2" V UP (TYP 3)

2" V UP

(TYP 4)

2" PW UP

2" V UP

2" UP TO FD-2

UP TO 4" FCO

2" UP TO FD-2

2" PW UP

2" V UP

PW PW PW PW

2" PW UP TO FD-2

2" PW UP TO FD-2

2" PW UP

2" V UP

UP TO 3" FCO

V UP

UP TO 4" FCO

3" DOMESTIC WATER, SEE CIVIL DRAWINGS

6" FIRE DEPT WATER CONNECTION, SEE

CIVIL AND FIRE PROTECTION DRAWINGS

6" FIRE PROTECTION WATER, SEE

CIVIL AND FIRE PROTECTION

DRAWINGS3"

4"

UP TO 4"

FCO

4"

4" P

W

3" UP TO FS-1

4"

P-200

V

2"

2"

2"

2"

2"

2"

2"

2"

2"

2"

2"

UP TO S-1

2" 2"

UP TO S-2

2" 2"2"

UP TO FD-2

4"

UP TO FD-1

3"

2"

2"

2"

2"

V

2"

3" 4"

3"

UP TO MS-1

2" 2"

4"

UP TO S-2

2"

4"

2" UP TO FD-4

UP TO 3" FCO

3"

3"

2" V UP

2" 2"

4"4"

4"

2" PW UP

SEE CIVIL DRAWINGS

FOR CONTINUATION

2"

2" PW UP

P W

FINSHED FLOOR EL. = 2581.64

I.E. = 2578.64

I.E. = 2576.64

I.E. = 2575.38 5

SEE CIVIL DRAWINGS

FOR CONTINUATION

CCWS/R UP, SEE

ENLARGED PLAN

2/MP-201

3"

3"

C C

W S

C C

W R

2"

UP TO FD-1 3

2"

C D

PW

V

4" UP TO

FCO

2" W UP TO FD-1

W/ TRAP PRIMER

W UP TO SH-1

W UP TO WC-1

W UP TO CW-1

UP TO FD-1 W/

TRAP PRIMER

UP TO ESE-1

UP TO

FCO

UP TO S-6

UP TO L-1

2" UP TO FD-1 W/

TRAP PRIMER

UP TO S-3

4"

4"

2"

2"

2"

4"

4"

2" 2" VENT UP

2" UP TO S-5

2"

4"

2"

2"

UP TO L-12"

2" PW UP

2"

2" V UP

4"

2" V UP

2"

UP TO S-1

2"

2"

2"

2"P W

P W

P W

P W

PW

4"

W W

W W

W

W

W

W

W

PW

W

UP TO WC-1

4"

2"

2" VENT UP

S

R

E

F O

R P

SS

E

OI AN L

G E

R

S T

A T

IS ET

F O

WA

N

N G

E

N

ED

E I

N T O

G

E R

I H

39561

M A R K

E . GA

R

D N E R

STAMP

REVISION NO. DATE

KEY PLAN - (NTS)

SHEET NUMBER

DRAWING TITLE

SCALE

DATE

PROJECT NUMBER

ISSUANCE

TRUE

NORTH

PLAN

NORTH

As indicated

P-200

11/24/2014

100% CONSTRUCTION DOCUMENTS

WASHINGTON

GRAINS PLANT

GROWTH FACILITY

WASHINGTON STATE UNIVERSITY

Pullman, WA

FOUNDATION WASTE AND

VENT PLAN

1/8" = 1'-0"1

FOUNDATION WASTE AND VENT

1/4" = 1'-0"2

ENLARGED RESTROOM AREA

FOUNDATION WASTE AND VENT PLAN

KEY NOTES

RELOCATE EXISTING FLOOR DRAIN TO OUTSIDE OF NEW SEED STORAGE

CHAMBER. CUT AND PATCH EXISTING FLOOR SLAB AS REQUIRED.

PROVIDE RUNNING TRAP LOCATED OUTSIDE OF THE FOOTPRINT OF THE

GROWTH CHAMBERS. COORDINATE LOCATION OF TRAP WITH RESPECT TO

EQUIPMENT/CABINETRY IN THE ROOM WHERE THE TRAP IS LOCATED. SEE

DETAIL 11/P-501.

PROVIDE TRAP PRIMER CONNECTION.

DN

C D E F G H JA

B

FD-3

FD-4

FD-4

FD-4

FD-2

FD-4

FD-4

FD-2

FD-2

FD-2FD-2FD-2

FD-2

FD-3

FD-3

FD-4

FCO

FCO

FCO

FCO

FCO

FCO

FCO

FCO

4" VTR

V

PW PW

P W

P W

P W

P W

PW

P W

P W

P W

P W

PW

PW

P W

P W

V

V

V V V V V V

P W

FCO

V

V V V V

V

V

V

VV

V

2' PW UP TO FD-6

2" PW UP TO FD-5

2" PW DN

2" V DN

FCO

PW UP TO FD

2" PW DN

2" V DN

2" PW UP TO FD-5

2" PW UP

TO FD-5

V UP (TYP 2)

2" V DN (TYP 4)

2" V UP

(TYP 3)

2" PW UP TO FD-5

2" PW UP TO FD-5

2" PW DN

2" V DN

2" PW UP TO FD-5

2" PW UP TO FD-5

2" PW UP TO FD-5

2" V DN

(TYP 2)

2" V DN (TYP 3)

V DN (TYP 4)

V UP

(TYP 2)

2" V DN

2" V UP

(TYP 3)

2" PW UP TO FD-5

FCO

P W

S-1

S-2

MS-1

S-2

FS-1

ESE-1

S-4

P-201

(E) FD

FD-1

2" V UP (TYP 3)

4"

2"

4"

3"

2"

2"

P W

2"

2"

2" V UP

2"

CO

2"

CO

2"

2"

3"

2"

2"

FCO

2"

2"

2"

2"

2"

2"

2" PW UP TO FD-5

2"

2"

2 1/2"

CO CO CO CO

2"

2"

2"

2" 2"

2"

2" 2"

2 1/2"

2" 2"

2"

2"

2"

2"

2"

2"

2" PW DN

PW

2" V UP

2" UP TO

FD-6

2"

2" PW UP

TO FD-5

FD-3

2" PW UP

TO FD-5

2" PW UP

TO FD-5

2"

FD-1

HAPLOID LAB

A11B

CHEMICAL

A5

RECEIVING

A16

MECHANICAL

A19

HALLWAY

A10E

UNISEX WC

A7

UNISEX WC

A11A

WORK ROOM

A22

GROWTH

CHAMBERS

A17

POT WASH

A11

PREP

A11

STAIRWELL

A100S

SOILS

A10A

THRESHING

ROOM

A10HERBICIDE ROOM

A4

STORAGE

A20

SEED STORAGE

A1

JANITOR

A12

HALLWAY

A10W

LOCKERS

A3

C D

FD-1

FD-1

FCO

V V

V

V DN

2" PW UP TO FD-5

FD-1

L-1

S-5

S-1

SH-1

L-1 S-3

CW-1

1 1/2" 2" 2"

2"

2 1/2"

4"

2"

2"

2" PW DN

1 1/2"

2"

2"

S-6

4"

WC-1

2"

HAPLOID LAB

A11B

CHEMICAL

A5

UNISEX WC

A7

UNISEX WC

A11A

S

R

E

F O

R P

SS

E

OI AN L

G E

R

S T

A T

IS ET

F O

WA

N

N G

E

N

ED

E I

N T O

G

E R

I H

39561

M A R K

E . GA

R

D N E R

STAMP

REVISION NO. DATE

KEY PLAN - (NTS)

SHEET NUMBER

DRAWING TITLE

SCALE

DATE

PROJECT NUMBER

ISSUANCE

TRUE

NORTH

PLAN

NORTH

As indicated

P-201

11/24/2014

100% CONSTRUCTION DOCUMENTS

WASHINGTON

GRAINS PLANT

GROWTH FACILITY

WASHINGTON STATE UNIVERSITY

Pullman, WA

FIRST FLOOR WASTE AND

VENT PLAN

1/8" = 1'-0"1

FIRST FLOOR WASTE AND VENT

1/4" = 1'-0"2

ENLARGED RESTROOM AREA FIRST

FLOOR WASTE AND VENT PLAN

KEY NOTES

RELOCATE EXISTING FLOOR DRAIN TO OUTSIDE OF NEW SEED STORAGE

CHAMBER. CUT AND PATCH EXISTING FLOOR SLAB AS REQUIRED.

PROVIDE RUNNING TRAP LOCATED OUTSIDE OF THE FOOTPRINT OF THE

GROWTH CHAMBERS. COORDINATE LOCATION OF TRAP WITH RESPECT TO

EQUIPMENT/CABINETRY IN THE ROOM WHERE THE TRAP IS LOCATED. SEE

DETAIL 11/P-501.

PROVIDE TRAP PRIMER CONNECTION.

B

FD-5FD-5

FD-5FD-5FD-5FD-5

FD-5FD-5

FD-5FD-5FD-5FD-5

FD-6

VVVVVV

V

3"2"

3" V UP, TERMINATE 3'

ABOVE TOP OF LOUVER

2" V DN

3"2 1/2"

2"2"

2" 2 1/2"

2" V DN (TYP 3)2" V DN (TYP 3)2" V DN (TYP 2)2" V DN (TYP 2)

2"2"

2"

2" V DN (TYP 2)

2"

2" V DN

4" VTR

FD-6

2" VTR

P-501

TYP.

FD-5FD-5FD-5

WEST

CONNECTOR

A100W

CORRIDOR

A100

GH - 1

A101

GH - 3

A103

GH - 5

A105

GH - 7

A107

GH - 9

A109

GH - 11

A111

GH - 12

A112

GH - 10

A110

GH - 8

A108

GH - 6

A106

GH - 4

A104

GH - 2

A102

S

R

E

F O

R P

SS

E

OI AN L

G E

R

S T

A T

IS ET

F O

WA

N

N G

E

N

ED

E I

N T O

G

E R

I H

39561

M A R K

E . GA

R

D N E R

STAMP

REVISION NO. DATE

KEY PLAN - (NTS)

SHEET NUMBER

DRAWING TITLE

SCALE

DATE

PROJECT NUMBER

ISSUANCE

TRUE

NORTH

PLAN

NORTH

1/8" = 1'-0"

P-202

11/24/2014

100% CONSTRUCTION DOCUMENTS

WASHINGTON

GRAINS PLANT

GROWTH FACILITY

WASHINGTON STATE UNIVERSITY

Pullman, WA

SECOND FLOOR WASTE

AND VENT PLAN

1/8" = 1'-0"1

SECOND FLOOR WASTE AND VENT

C D E F G H JA

B

HAPLOID LAB

A11B

CHEMICAL

A5

RECEIVING

A16

MECHANICAL

A19

HALLWAY

A10E

UNISEX WC

A7

WORK ROOM

A22

GROWTH

CHAMBERS

A17

POT WASH

A11

PREP

A11

SOILS

A10A

THRESHING

ROOM

A10

HERBICIDE ROOM

A4

STORAGE

A20

SEED STORAGE

A1

P-203

1 1/2"

RO

IHW

ICW

1 1/2"

1/2"1/2"

1/2"

1/2"

3/4"

1/2" 1/2"

3/4"

3/4"

3/4"

CW

HW

P-203

FW

TW

S-2

IHW

ICW

TW

HB-1

S-1

HB-2

HB-2

HB-1

MS-1

S-2

DOWN TO AUTOCLAVE

HB-1

S-4

3/4" RO UP

ESE-1

1" TW DN

TO ESE-1

HB-1

IHWC

HWC

3/4"

1 1/2" 3/4"

3/4"

1 1/2" 1 1/4"

3/4" 3/4"

1 1/2"

3/4"

3/4"

3/4"

1/2"

1/2"

HB-2 +48"2

+48"

1 1/2"

3/4"

1"

1 1/4"

1 1/2"

1 1/2"

3/4" 3/4"

+48" 1 1/4"

1 1/2" 1 1/2"

1"

1/2"

3/4" 1"

1/2"

1 1/4"

3/4"

RO

IHW

ICW

CW

HW

TW

IHWC

HWC

1 1/2"

3/4"

1" 3/4"

1"

3/4"

3/4"

3/4"

1 1/2"

3/4"

3/4" 3/4"

1 1/4"

3/4"

3/4"

3/4" 3/4"

3/4"

3/4" 3/4"

3/4"

TP-1

TO 3 TRAPS

3/4"

3/4"

3/4"

UNISEX WC

A11A

R O

IH

W

IC

W R

O

H J

MECHANICAL

A19

DOMESTIC AND

INDUSTRIAL WATER

SERVICE & RPBP'S

3" WATER DN, SEE SHEET

P-200 FOR CONTINUATION

6" FDC DN, SEE SHEET P-

200 FOR CONTINUATION

WH-1

WH-2

(IHW)

(DOM. HW)

CW

ICW

C W

H W

H W

C

IH

W

C

IH

W

T W

IC

W

1 1/2"

1/2"

3/4"

1 1/2"

C W

H W

H W

C

T W

1 1/2"

1 1/2"

RCP-1

IN RISER

MV-1

MV-2

2"

IH

W

C

IH

W

IC

W

IH

W

C

IH

W

RCP-2

IN RISER

MV-3

3/4"

ICW

HB-1

1 1/2"

1 1/2"

1 1/4" 3/4"

3/4"

1 1/4"

RO SYSTEM

PRETREATMENT

RO

STORAGE

BP-2

BP-1

FERTILIZER TANK

1 1/2"

IC

W

P-501

P-501

FERTILIZER

INJECTOR PUMPP-501

P-501

FD-3

FD-3

FD-3

TP-1 TO 4 TRAPS

HB-2 36" AFF

3/4"

6" FP RISER, SEE SHEET P-

200 FOR CONTINUATION

FD-3

3/4" 3/4"

IH

W

IC

W

HB-2

+48"

3/4"

1 1/2"

1 1/2"

RO GENERATORS SEE DETAIL 11/P-501 FOR

RO SYSTEM PIPING DETAIL

RO SYSTEM DESCALENT

DD

S-6

S-3

S-5

TW

ICW

IHW

S-1

L-1

SH-1

WC-1

CW/HW DN TO

L-1

CW-1

1/2"1/2"

IH

W

IC

W

1/2" 1/2"

1 1/2"

3/4"

1/2"

1 1/4"

3/4"

3/4"

1 1/2"

R O

IH

W

IC

W

IH

W

C

3/4"

3/4" 3/4"

3/4"

3/4"

1/2"

3/4"

1/2"

3/4" 3/4"

1/2"

1T W

IH

WIC

W

T W

TP-1

3/4"

TO 4 TRAPS

HAPLOID ROOM

A11B

CHEMICAL ROOM

A5

UNISEX WC

A11A

UNISEX WC

A7

WC-1

S

R

E

F O

R P

SS

E

OI AN L

G E

R

S T

A T

IS ET

F O

WA

N

N G

E

N

ED

E I

N T O

G

E R

I H

39561

M A R K

E . GA

R

D N E R

STAMP

REVISION NO. DATE

KEY PLAN - (NTS)

SHEET NUMBER

DRAWING TITLE

SCALE

DATE

PROJECT NUMBER

ISSUANCE

TRUE

NORTH

PLAN

NORTH

As indicated

P-203

11/24/2014

100% CONSTRUCTION DOCUMENTS

WASHINGTON

GRAINS PLANT

GROWTH FACILITY

WASHINGTON STATE UNIVERSITY

Pullman, WA

FIRST FLOOR WATER

PIPING PLAN

1/8" = 1'-0"1

FIRST FLOOR WATER PIPING PLAN

1/4" = 1'-0"2

ENLARGED MECHANICAL ROOM WATER

PIPING PLAN

1/4" = 1'-0"3

ENLARGED RESTROOM AREA PLUMBING

PLAN

KEY NOTES

3/4" RO UP THROUGH ROOF TO CONNECT TO EVAPORATIVE

COOLING UNITS (BY OTHERS). PROVIDE DRAIN VALVE WITH HOSE

CONNECTION AT BOTTOM OF RISER.

PROVIDE PVC BALL VALVE AND HOSE END CONNECTION AT

FERTILIZED WATER (FW) TERMINATION. 48" AFF.

TERMINATE AT 72" AFF WITH BALL VALVE AND CAP FOR

CONNECTION TO EQUIPMENT BY OTHERS.

TERMINATE AT 36" AFF WITH BALL VALVE AND CAP FOR

CONNECTION TO EQUIPMENT BY OTHERS.

ROUTE 1 1/4" ICW, 1 1/4" RO AND 1 1/4" FW UP THROUGH FLOOR

ABOVE TO SERVE GREENHOUSES. SEE FLOOR PENETRATION

DETAIL 4/P-501. (SIMILAR)

PROVIDE BALL AND CAP FOR CONNECTION TO EQUIPMENT BY

OTHERS. VERIFY CONNECTION SIZE AND LOCATION.

ROUTE IHW, ICW, AND TW DOWN WING WALL TO SERVE S-1 AND

S-2.

KEY NOTES

ROUTE 3/4" RO DOWN TO 72" AFF. PROVIDE BALL VALVE AND

CAP FOR CONNECTION TO LAB EQUIPMENT BY OTHERS.

B

3/4" FW AND

ICW (STACKED)

HB-2

+48" TYP

HB-2

+48" TYP

3/4" FW, ICW

AND RO

+48" TYP

+48" TYP

+48" TYP

3/4" FW, ICW AND

RO (STACKED)

+48" TYP

3/4" FW AND

ICW (STACKED)

+48" TYP

+48" TYP

3/4" FW, ICW

AND RO

HB-2

+48" TYP

HB-2

1 1/4" 1 1/4"

1 1/2"

3/4" 3/4" 3/4"

RO

FW

ICW

RO

FW

ICW

RO

FW

ICW

3/4" 3/4" 3/4" 3/4"+24"

HB-2+24"

R O

IC

W

F W

3/4"

3/4"

3/4"

EVAP COOLER BY OTHERS (TYP 2)

(E) 3/4" ICW VALVED

AND CAPPED

HB-1

TP-1 TO FD-6 IN PASSAGE

TP-1

TO FD-6 IN

CONNECTOR

3/4" FW AND

ICW (STACKED)

HB-2

+48" TYP

3/4" 3/4"

+48" TYP

3/4"

HB-2

+48" TYP

HB-2

HB-2

+48" TYP

+48" TYP

3/4" FW, ICW

AND RO

+48" TYP

+48" TYP

3/4" FW, ICW

AND RO

HB-2

+48" TYP

3/4" 3/4"

HB-2

+48" TYP

+48" TYP

3/4" FW, ICW

AND RO

+48" TYP

3/4" FW AND

ICW (STACKED)

3/4" 3/4"

+48" TYP

3/4"

HB-2

+48" TYP

HB-2

+48" TYP

3/4" FW, ICW AND

RO (STACKED)

3/4" FW AND

ICW (STACKED)

HB-2

+48" TYP

3/4" 3/4"

3/4" FW AND

ICW (STACKED)

ARGUS PANELS (TYP)

3/4" 3/4"

3/4"

1" 1"

1"

1" 1" 1"

1" 1" 1"

1" 1" 1"

WEST

CONNECTOR

A100W

CORRIDOR

A100

GH - 1

A101

GH - 3

A103

GH - 5

A105

GH - 7

A107

GH - 9

A109

GH - 11

A111

GH - 12

A112

GH - 10

A110

GH - 8

A108

GH - 6

A106

GH - 4

A104

GH - 2

A102

S

R

E

F O

R P

SS

E

OI AN L

G E

R

S T

A T

IS ET

F O

WA

N

N G

E

N

ED

E I

N T O

G

E R

I H

39561

M A R K

E . GA

R

D N E R

STAMP

REVISION NO. DATE

KEY PLAN - (NTS)

SHEET NUMBER

DRAWING TITLE

SCALE

DATE

PROJECT NUMBER

ISSUANCE

TRUE

NORTH

PLAN

NORTH

1/8" = 1'-0"

P-204

11/24/2014

100% CONSTRUCTION DOCUMENTS

WASHINGTON

GRAINS PLANT

GROWTH FACILITY

WASHINGTON STATE UNIVERSITY

Pullman, WA

SECOND FLOOR WATER

PIPING PLAN

1/8" = 1'-0"1

SECOND FLOOR WATER PIPING PLAN

KEY NOTES:

PROVIDE 3/4" IFW BALL VALVE (PVC) WITH HOSE THREAD ADAPTER ON DISCHARGE AT 48" AFF.

PROVIDE 3/4" ICW AND FW BALL VALVES AND PIPE CAPS AT 28" AFF FOR FUTURE IRRIGATION

SYSTEM.

PROVIDE 3/4" RO BALL VALVE AND PIPE CAP AT 60" AFF FOR CONNECTION TO EVAPORATIVE

COOLING SYSTEM BY OTHERS.

ROUTE 1 1/4" ICW, 1 1/4" FW AND 1 1/4" RO UP THROUGH FLOOR SLAB FROM 1ST FLOOR. SEE

DETAIL 4/P-501 (SIMILAR) FOR FLOOR PENETRATION. SEE P-203 FOR CONTINUATION.

ROUTE 3/4" RO UP THROUGH ROOF TO CONNECT TO EVAPORATIVE COOLERS, BY OTHERS.

PROVIDE 3/4" RO BALL VALVE AND CAP FOR CONNECTION TO EVAP COOLING UNIT, BY OTHERS.

PROVIDE DRAIN VALVE WITH HOSE END TO DRAIN PIPING AND COOLING UNIT.

CONNECT 3/4" ICW TO (E) 3/4" ICW AND ROUTE DOWN TO HB-1.

AS SHOWN

11/24/2014

100% CONSTRUCTION DOCUMENTS

WASHINGTON

GRAINS PLANT

GROWTH FACILITY

WASHINGTON STATE UNIVERSITY

Pullman, WA

STAMP

REVISION NO. DATE

KEY PLAN - (NTS)

SHEET NUMBER

DRAWING TITLE

SCALE

DATE

PROJECT NUMBER

ISSUANCE

TRUE

NORTH

PLAN

NORTH

P-601

PLUMBING SCHEMATICS

FIRST FLOOR

PROCESS WASTE AND VENT PIPING RISER DIAGRAM - NORTH BRANCH

NOT TO SCALE

SECOND FLOOR

MECHANICAL

ROOM

4"FCO2"FCO4"FCO

FIRST FLOOR

SECOND FLOOR

ROOF

2"V

4"FCO

S-1S-5

FD-2 FD-4

WORKROOM

3"FCO

FD-2 FD-2FD-2FD-2

4"FCO

PROCESS WASTE AND VENT PIPING RISER DIAGRAM -SOUTH BRANCH

NOT TO SCALE

FIRST FLOOR

SANITARY WASTE AND VENT PIPING RISER DIAGRAM

NOT TO SCALE

SECOND FLOOR

TOILET

ROOM

4"FCO4"FCO

FD-3FD-3FD-3FD-4FD-4FD-4FD-2FD-1FS-1FD-2FD-4

3"FCO

FD-4

S-2

4"FCO

MS-1

S-2 S-1

FD-5 FD-5 FD-5 FD-5FD-5FD-5FD-5FD-5FD-5FD-5FD-5FD-5FD-6

S-4

GROWTH ROOMSPOT WASH GROWTH ROOMS

GREENHOUSES

RECEIVETHRESHHERB

SEE NORTH BRANCH

RISER DIAGRAM FOR

CONTINUATION

(52 FU)

SEE SOUTH BRANCH

RISER DIAGRAM FOR

CONTINUATION

FD-1

S-6S-3

FD-1

WC-1

L-1

SH-1WC-1FD-1

L-1CW-1

TOILET

ROOM

ESE-1

SEE SANITARY RISER

DIAGRAM FOR CONTINUATION

SEE PROCESS WASTE RISER

DIAGRAMS FOR CONTINUATION

SEE PROCESS WASTE RISER

DIAGRAMS FOR CONTINUATION

4" VTR

4" VTR

3" VENT THROUGH WALL

WITH ELBOW UP

(32 FU)

HAP LAB

CHEM

NOTE: THIS VENT IS COMMON

TO ALL DIAGRAMS, PROCESS

WASTE AND SANITARY WASTE

NOTE: THIS VENT IS COMMON

TO ALL DIAGRAMS, PROCESS

WASTE AND SANITARY WASTE

NOTE: THIS VENT IS COMMON

TO ALL DIAGRAMS, PROCESS

WASTE AND SANITARY WASTE

4" W

4" W

FD-5

SEE SOUTH BRANCH RISER

DIAGRAM FOR CONTINUATION

SEE NORTH BRANCH

RISER DIAGRAM FOR

CONTINUATION

2"V

2"V

2"W (6 FU)2"W (4 FU)

2"W (10 FU)2"V (5 FU)

2"V (6 FU)

2"V (12 FU)

2"V (6 FU)

2"W (4 FU) 2"W (6 FU)

2"V (4 FU)

2"V (4 FU)

2"V (10 FU)

2"V (6 FU)

2"W (4 FU)

2"W

2"V (4 FU)2"V

2-1/2"V (6 FU) 2-1/2"V (16 FU) 3"V (28 FU)

TERMINATE 3" VENT

MINIMUM 3' ABOVE

WALL LOUVER

2"V2"W (8 FU)

2"V 3"W

2"V

2"V 2"W (10 FU)

2"W

3"W (5 FU)

2"V 1-1/2"V

2"V (5 FU)

2"W

2"V (7 FU)2"V (17 FU)

3"W (7 FU)3"W (17 FU)3"W (19 FU)3"W (21 FU)4"W (31 FU)4"W (34 FU)4"W (36 FU)4"W (44 FU)

4"W (96 FU)

2"W

2"V

4"W (49 FU)

4"W (43 FU) 4"W (2 FU)

2"V (8 FU)

2-1/2"V (23 FU)

4"W (8 FU)4"W (14 FU)

2"W (6 FU)2"W (4 FU)

4"W (18 FU)4"W (30 FU)

2"V (12 FU)2"V (2 FU)

2"V (14 FU)

2"V (16 FU)

4"W (34 FU)4"W (36 FU)4"W (41 FU)

4"W (47 FU) 4"W (4 FU) 4"W

2"W

4"W (52 FU)

4"W (98 FU)4"W (100 FU)

4"W (2 FU)

2"W

4"W (7 FU)4"W (9 FU)4"W (13 FU)4"W

(16 FU)

4"W (19 FU)4"W (21 FU) 4"W

(15 FU)4"W (21 FU)

2"V (8 FU)

(2 FU)

(4 FU)

(1 FU)

(2 FU)(4 FU)(2 FU)

(1 FU)(3 FU)

(2 FU)

2"V (15 FU)2"V (21 FU)2-1/2"V

(27 FU)

2"V

(24 FU)

(2 FU) (2 FU) (2 FU)(2 FU)(2 FU)(2 FU)(2 FU)(2 FU)(6 FU)(2 FU)(2 FU)(2 FU)(2 FU)(2 FU)(2 FU)

(2 FU) (3 FU)(2 FU)(3 FU) (2 FU)

3"W (12 FU) 2"W (4 FU)

(2 FU)

(2 FU)

(2 FU)

(2 FU)

(3 FU)

(2 FU) (2 FU) (2 FU)

(2 FU)(2 FU) (2 FU) (2 FU) (2 FU) (2 FU) (2 FU) (2 FU) (2 FU) (2 FU) (2 FU) (2 FU)

(2 FU) (3 FU)

2"V (8 FU)

2"V

(15 FU)

2"V (6 FU)

2-1/2"V (23 FU)

2"V (4 FU)

2-1/2"V (27 FU)2-1/2"V (32 FU)

2"V (16 FU)

3"V (48 FU)3"V (50 FU)

2"V (5 FU)

2"V (5 FU)

3"V (55 FU)

2-1/2"V (27 FU)

4"V (82 FU)

2"V (2 FU)2"V (3 FU)

4"V (87 FU)4"V (89 FU) 4"V (84 FU)

4"V (89 FU)

2"V (7 FU)2"V (2 FU)

2"V (17 FU) 2"V (15 FU)

2"V (5 FU)

2-1/2"V (27 FU)2-1/2"V (32 FU)3"V (48 FU)

2"V (2 FU)

3"V (50 FU)3"V (55 FU)4"V (84 FU)4"V (87 FU)

2-1/2"V (27 FU)2"V (2 FU)

4"V (82 FU)

3"V (55 FU)4"V (84 FU)

3"W 3"W 3"W

3"W (6 FU)2"W (4 FU)

FD-5

(2 FU)

2"W (4 FU)2"W (4 FU)

FD-5

(2 FU)

FD-5

(2 FU)

2"V 2"V

4"W

FD-1

(2 FU)

4"W (38 FU)

2"V 2"V

2"V (8 FU)

FD-3

(2 FU)

4"W (6 FU)

100% CONSTRUCTION DOCUMENTS

WASHINGTON

GRAINS PLANT

GROWTH FACILITY

WASHINGTON STATE UNIVERSITY

Pullman, WA

STAMP

REVISION NO. DATE

KEY PLAN - (NTS)

SHEET NUMBER

DRAWING TITLE

SCALE

DATE

PROJECT NUMBER

ISSUANCE

TRUE

NORTH

PLAN

NORTH

P-602

PLUMBING SCHEMATICS

FIRST FLOOR

DOMESTIC HOT AND COLD WATER PIPING RISER DIAGRAM (POTABLE)

NOT TO SCALE

SECOND FLOOR

FIRST FLOOR

SECOND FLOOR

ROOF

S-2

SEE INDUSTRIAL WATER RISER

DIAGRAM FOR CONTINUATION

EMERGENCY

EYEWASH

S-2

EMERGENCY

EYEWASH

S-5

EMERGENCY

EYEWASH

CW-1L-1WC-1

SH-1

L-1 WC-1

ESE-1

TWTW

INDUSTRIAL (LAB) HOT AND COLD WATER PIPING RISER DIAGRAM (NON-POTABLE)

NOT TO SCALE

SEE DOMESTIC WATER RISER

DIAGRAM FOR CONTINUATION

FERTILIZER INJECTOR

AND MIX TANK

ICWICW

IHW

FW

HB-1S-2S-1HB-1HB-2HB-2S-2

VALVE AND CAP

FOR CONNECTION

TO AUTOCLAVE

(BY OTHERS)

MS-1HB-1HB-1S-1S-5

S-3

EMERGENCY

EYEWASH

S-4

EMERGENCY

EYEWASH

S-3S-6S-4HB-1 HB-2

FW

ICW

HB-2 HB-2

HB-2 HB-2

HB-2HB-2

FW

ICW

HB-2HB-2

HB-2 HB-2

HB-2 HB-2

HB-2 HB-2

HB-2 HB-2

FW

ICW

FW

ICW

HB-2HB-2

HB-2HB-2

FW

ICW

FW

HB-2

HB-2

FW

ICW

FW

ICW

ICW

FW

ICW

HB-2

HB-2

FW

ICW

FW

ICW

1 3/4" PVC BALL VALVE WITH HOSE ADAPTOR ON DISCHARGE, ON FW PIPING.

NOTES:

1 1

1 1 1 1

1 1 1 1

1 1 1 1

1 1

1 1

1 1 1

FIRST FLOOR

SECOND FLOOR

ROOF

REVERSE OSMOSIS (RO) WATER PIPING RISER DIAGRAM

NOT TO SCALE

RO WATER

GENERATORS

RO

AUTOCLAVE

(BY OTHERS)

RO

RO

RO

RO

RO RO

WATER POLISHER

(BY OTHERS)

SPRAY CABINET

(BY OTHERS)

WATER POLISHER

(BY OTHERS)

GROWTH CHAMBER AREA

(EQUIPMENT BY OTHERS)

750 GALLON

STORAGE TANK

CARBON

FILTER

WATER SOFTENER

AND BRINE TANK

GREENHOUSE COOLING SYSTEMS

(BY OTHERS)

GREENHOUSE COOLING SYSTEMS

(BY OTHERS)

CONNECTOR COOLING UNITS

(ON ROOF)

10"x42" SUMP (14 GAL) AND

PUMP FOR AEROTECH

COOLING SYSTEM

(TYPICAL OF 12)

VALVE AND CAP FOR

CONNECTION TO EVAP

COOLING UNITS ON ROOF.

27 GPH MAX. (0.45 GPM)

(TYPICAL OF 2)

VALVE AND CAP FOR

CONNECTION TO EVAP

COOLING SYSTEMS

78 GPH MAX. (1.3 GPM)

(TYPICAL OF 12)

PROVIDE DRAIN VALVE

WITH HOSE END

CONNECTION FOR

SEASONAL DRAIN-DOWN

(1.5 GPM) (1.5 GPM) (1.5 GPM) (1.5 GPM) (1.5 GPM)(30 GPM)

(4 FU)(1 FU)(5 FU)(5 FU)(1 FU)

(2 FU)

TW

(3 FU)(3 FU)(3 FU)(2 FU)(3 FU)(2.5 FU) (1 FU) (1 FU) (3 FU) (3 FU) (1 FU) (1 FU) (1 FU) (1 FU) (1 FU) (1 FU) (3 FU) (3 FU) (1 FU)

(1 FU)(1 FU)(1 FU)(1 FU)

(2.5 FU)

(1 FU)

(1 FU) (1 FU)

(1 FU) (1 FU)

3/4"

3/4"

3/4"

(1 FU)

(1 FU)

(1 FU)

(1 FU)

(1 FU)

(3.5 FU)

3/4" 3/4"

1"

(5.5 FU)

1" (7.5 FU)

(1 FU)

(1 FU)

(1 FU)

(1 FU)

(1 FU)

(1 FU)

(1 FU)

1-1/4" 3/4"

1-1/4"

(21.5 FU)

(1 FU)

(1 FU) (1 FU)

(1 FU)

(1 FU)

(1 FU)

(1 FU)

(1 FU)

3/4" 3/4"

1"

(5.5 FU)

(1 FU)

(1 FU)

(1 FU)

(1 FU)

(1 FU)

3/4" 3/4"

1"

(5.5 FU)

(1 FU)

(1 FU)(1 FU)

(1 FU)

(1 FU)

(1 FU)

(1 FU)

(1 FU)

3/4" 3/4"

1"

(5.5 FU)

(1 FU)

(1 FU)

(1 FU)

(1 FU)

(1 FU)

3/4" 3/4"

1"

(5.5 FU)

1" (11.5 FU) 1" (11.5 FU) 1" (7.5 FU)

(23.5 FU)

1-1/4"

(25.5 FU)

VALVE AND CAP FOR

CONNECTION TO TRACK

SPRAY CABINET.

2 GPM MAX.

VALVE AND CAP FOR

CONNECTION TO WATER

POLISHER.

2 L/M (0.5 GPM)

VALVE AND CAP FOR

CONNECTION TO AUTOCLAVE

1 GPM MAX.

4 GPH AT 60 PSI

(.07 GPM)

4 GPH AT 60 PSI

(.07 GPM)

6 GPH AT 60 PSI

(0.10 GPM)

4 GPH AT 60 PSI

(.07 GPM)

1 GPH AT 60 PSI

(.02 GPM)

BP-1

BP-2

ICW

3/4"

1-1/4"

1"

3/4"

1"

3/4"

1-1/4"

1" 1"

3/4" 3/4"

3/4"

3/4" 3/4"

3/4"

3/4"

1/2" 1/2"

3/4"

1/2"

3/4" 3/4"

3/4"

1-1/2"

3/4" 3/4"

1-1/2"

1-1/2"

3/4"

3/4"

3/4" (5.5 FU)

3/4"

(3.75 FU)

3/4" (6 FU) 1" (8.5 FU)

3/4"

(4.5 FU)

1" (10.5 FU) 1" (13 FU)

(1 GPM) (15 GPM)

3/4"

1" (12.75 FU) 1" (17.25 FU)

3/4" (3.25 FU)

1" (17.25 FU)

1-1/4" (34.5 FU)

1"

1-1/2" (60 FU)

1" (16 FU)

1-1/4" (27.5 FU) 1-1/2" (63 FU)

3/4" (4.5 FU)

3/4" (5.5 FU)

1-1/4" (27.5 FU)

1-1/4" (20.5 FU) 1-1/2" (69.5 FU)1" (16 FU)

3/4"

2" (84.5 FU)

3/4"

1-1/2" (33 GPM)3/4" (2.25 FU) 3/4" (2.25 FU)1-1/4" (5.75 FU) 1-1/2" (7.25 FU)

3/4" (6 FU)

1-1/2" (16 FU)

3/4" 3/4"

2" (91 FU)1-1/4" (20.5 FU)

1"

1"

1-1/4"

3/4"

1-1/2" (37.5 GPM) 1-1/2" (16 FU) 2"

3" CW. SEE CIVIL DRAWINGS

FOR CONTINUATION

3" CW. SEE CIVIL DRAWINGS

FOR CONTINUATION

1" 3/4"

1-1/2"

1-1/2" 1"

3/4"

3/4"

P-501

P-501

P-501

P-501

MV-1

MV-2

MV-3

P-501

CaCO3 FILTER

100% CONSTRUCTION DOCUMENTS

WASHINGTON

GRAINS PLANT

GROWTH FACILITY

WASHINGTON STATE UNIVERSITY

Pullman, WA

STAMP

REVISION NO. DATE

KEY PLAN - (NTS)

SHEET NUMBER

DRAWING TITLE

SCALE

DATE

PROJECT NUMBER

ISSUANCE

TRUE

NORTH

PLAN

NORTH

P-701

PLUMBING EQUIPMENT

SCHEDULES

P-200 - FOUNDATION WASTE AND VENT PLAN
P-201 - FIRST FLOOR WASTE AND VENT PLAN
P-202 - SECOND FLOOR WASTE AND VENT PLAN
P-203 - FIRST FLOOR WATER PIPING PLAN
P-204 - SECOND FLOOR WATER PIPING PLAN
P-501 MECHANICAL DETAILS-P-501
P-601 PLUMBING SCHEMATICS-P-601
P-601 PLUMBING SCHEMATICS
P-601
P-602 PLUMBING SCHEMATICS-P-602
P-602 PLUMBING SCHEMATICS
P-602
P-701 PLUMBING SCHEDULES-P-701
P-701 PLUMBING SCHEDULES
P-701

File details come from the government source that posted it. Updated .