b.final_solicitation.doc
DOC document 457 KB Posted
- Attached to
- Prairie City Ranger District Janitorial Services
- Solicitation number
- AG-04M3-S-09-0049
About this file
B. Solicitation
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amd.doc | DOC document | |
| e.wage_determination.txt | TXT text file | |
| d.BackgroundCheck.doc | DOC document | |
| a.bidders_packet.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AG-04M3-S-09-0049
| SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS |
| 1. REQUISITION NUMBER |
| PAGE 1 OF |
| Offeror to complete blocks 12, 17, 23, 24, & 30 |
| 294033 |
| 26 |
| 2. CONTRACT NO. |
| 3. AWARD/EFFECTIVE DATE |
| 4. ORDER NUMBER |
| 5. SOLICITATION NUMBER |
| 6. SOLICITATION ISSUE DATE |
| AG-04M3-S-09-0049 |
| August 12, 2009 |
| 7. FOR SOLICITATION |
| a. NAME |
| b. TELEPHONE (No Collect Calls) |
| 8. OFFER DUE DATE/ |
LOCAL TIME 4:30 PM
INFORMATION CALL
Annie Stanbro—Contract Specialist
William Huber—Technical Contact 541-523-1342 541-573-4348 September 9, 2009
| 9. ISSUED BY (MAIL OFFERS TO) |
| CODE |
10. THIS ACQUISITION IS
FORMCHECKBOX
UNRESTRICTED
| 11. DELIVERY FOR FOB DESTINATION UNLESS BLOCK IS MARKED. |
| 12. DISCOUNT TERMS |
| USDA FOREST SERVICE |
| FORMCHECKBOX |
SET-ASIDE. 100% FOR
FORMCHECKBOX
SEE SCHEDULE
| WALLOWA WHITMAN NATIONAL FOREST |
| FORMCHECKBOX |
SMALL BUSINESS,
FORMCHECKBOX
HUBZONE SMALL BUSINESS
FORMCHECKBOX
13a. THIS CONTRACT IS A RATED ORDER
| P.O. BOX 907 |
| FORMCHECKBOX |
8(A)
UNDER DPAS (15 CFR 700)
| BAKER CITY, OR 97814 |
| FORMCHECKBOX |
SOLE SOURCE
13b. RATING
| NAICS: 561720 |
| 14. METHOD OF SOLICITATION |
| SIZE STANDARD: $15.0 million |
| FORMCHECKBOX |
RFQ
FORMCHECKBOX
IFB
FORMCHECKBOX
RFP
| 15. DELIVER TO: |
| CODE |
| 16. ADMINISTERED BY |
| CODE |
MALHEUR NATIONAL FOREST
PRAIRIE CITY RANGER DISTRICT
327 SW FRONT STREET
PRAIRIE CITY OR 97869
Same as Block 9
| 17a. CONTRACTOR/OFFEROR |
| CAGE |
FACILITY CODE
| 18a. PAYMENT WILL BE MADE BY |
| CODE |
| DUNS #____________________________ |
| CSC-FS, USDA, OCFO, COD, APB |
PO Box 66527
St. Louis, MO 63166
| TELEPHONE: |
| TIN: |
| 18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK |
FORMCHECKBOX
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER
IS CHECKED: FORMCHECKBOX
SEND INVOICES TO ADDRESS SHOWN IN BLOCK 9
19.
ITEM NO,
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
Janitorial Service: Malheur National Forest – Prairie City Ranger District Office and Compound Buildings (see attached Schedule of Item)
(Use Reverse and/or Attach Additional Sheets as Necessary)
| 25. ACCOUNTING AND APPROPRIATION DATA |
| 26. TOTAL AWARD AMOUNT (For Govt. Use Only) |
FORMCHECKBOX
27a. solicitation incorporates by reference FAR 52.212-1, 52.212-4. FAR 52.212-3 and 52.212-5 and Addenda FORMCHECKBOX are FORMCHECKBOX are not attached.
FORMCHECKBOX
27b. contract/purchase order incorporates by reference FAR 52.212-4. FAR 52.212-5 AND Addenda FORMCHECKBOX are FORMCHECKBOX are not attached.
28.
FORMCHECKBOX
| CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN ORIGINAL TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED HEREIN. |
| 29. |
FORMCHECKBOX
AWARD OF CONTRACT: YOUR OFFER ON SOLICITATION (BLOCK 5), DATED (BLOCK 30c) INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
| 30a. SIGNATURE OF OFFEROR/CONTRACTOR |
| 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER) |
| 30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) |
| 30c. DATE SIGNED |
| 31b. NAME OF CONTRACTING OFFICER |
| 31c. DATE SIGNED |
AUTHORIZED FOR LOCAL REPRODUCTION
STANDARD FORM 1449 (Rev. 4/2002)
PREVIOUS EDITION IS NOT USABLE
Prescribed by GSA ( FAR (48 CFR) 53.212
| 19. ITEM NO |
| 20. SCHEDULE OF SUPPLIES/SERVICES |
| 21. QTY |
| 22. UNIT |
| 23. UNIT PRICE |
| 24. AMOUNT |
| 1 |
| Base Year FY 2010 – 10/01/2009 – 09/30/2010 |
| 1a |
| Janitorial, Building #2005, 327 SW Front St, Prairie City |
| 12 |
| MO |
| $___________ |
| $_____________ |
| 1b |
| Janitorial, Building #2008,327 SW Front St, Prairie City |
| 12 |
| MO |
| $___________ |
| $_____________ |
| 1c |
| Janitorial, Building #2009, 327 SW Front St, Prairie City |
| 12 |
| MO |
| $___________ |
| $_____________ |
| 1d |
| Janitorial, Building #2302, 327 SW Front St, Prairie City |
| 12 |
| MO |
| $___________ |
| $_____________ |
| 1e |
| Janitorial, Building #2210, 144 N Johnson St, Prairie City |
| 12 |
| MO |
| $___________ |
| $_____________ |
| 1f |
| Janitorial, Wellness Room, 146 N Johnson St, Prairie City |
| 12 |
| MO |
| $___________ |
| $_____________ |
| TOTAL FOR Base Year FY 2010 |
| XX |
| XX |
| XXXXXXX |
| $______________ |
| 2 |
| Option Year FY 2011 – 10/01/2010 – 09/30/2011 |
| 2a |
| Janitorial, Building #2005, 327 SW Front St, Prairie City |
| 12 |
| MO |
| $___________ |
| $_____________ |
| 2b |
| Janitorial, Building #2008,327 SW Front St, Prairie City |
| 12 |
| MO |
| $___________ |
| $_____________ |
| 2c |
| Janitorial, Building #2009, 327 SW Front St, Prairie City |
| 12 |
| MO |
| $___________ |
| $_____________ |
| 2d |
| Janitorial, Building #2302, 327 SW Front St, Prairie City |
| 12 |
| MO |
| $___________ |
| $_____________ |
| 2e |
| Janitorial, Building #2210, 144 N Johnson St, Prairie City |
| 12 |
| MO |
| $___________ |
| $_____________ |
| 2f |
| Janitorial, Wellness Room, 146 N Johnson St, Prairie City |
| 12 |
| MO |
| $___________ |
| $_____________ |
| TOTAL FOR Option Year FY 2011 |
| XX |
| XX |
| XXXXXXX |
| $______________ |
| 3 |
| Option Year FY 2012 -10/01/2011 – 09/30/2012 |
| 3a |
| Janitorial, Building #2005, 327 SW Front St, Prairie City |
| 12 |
| MO |
| $___________ |
| $_____________ |
| 3b |
| Janitorial, Building #2008,327 SW Front St, Prairie City |
| 12 |
| MO |
| $___________ |
| $_____________ |
| 3c |
| Janitorial, Building #2009, 327 SW Front St, Prairie City |
| 12 |
| MO |
| $___________ |
| $_____________ |
| 3d |
| Janitorial, Building #2302, 327 SW Front St, Prairie City |
| 12 |
| MO |
| $___________ |
| $_____________ |
| 3e |
| Janitorial, Building #2210, 144 N Johnson St, Prairie City |
| 12 |
| MO |
| $___________ |
| $_____________ |
| 3f |
| Janitorial, Wellness Room, 146 N Johnson St, Prairie City |
| 12 |
| MO |
| $___________ |
| $_____________ |
| TOTAL FOR Option Year FY 2012 |
| XX |
| XX |
| XXXXXXX |
| $______________ |
32a. QUANTITY IN COLUMN 21 HAS BEEN
FORMCHECKBOX
RECEIVED
FORMCHECKBOX
INSPECTED
FORMCHECKBOX
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: _______________________
| 32b. SIGNATURE OF AUTHORIZED GOVT. REPRESENTATIVE |
| 32c. DATE |
| 32.d PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT REPRESENTATIVE |
| 32.e MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE |
| 32.f TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE |
32.g E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
| 33. SHIP NUMBER |
| 34. VOUCHER NUMBER |
| 35. AMOUNT VERIFIED CORRECT FOR |
| 36. PAYMENT |
| 37. CHECK NUMBER |
FORMCHECKBOX
COMPLETE FORMCHECKBOX
PARTIAL FORMCHECKBOX
FINAL
FORMCHECKBOX
PARTIAL FORMCHECKBOX
FINAL
| 38. S/R ACCOUNT NUMBER |
| 39. S/R VOUCHER NUMBER |
| 40. PAID BY |
| 41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT |
| 42a. RECEIVED BY (Print) |
| 41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER |
| 41c. DATE |
42b. RECEIVED AT (Location)
| 42c. DATE REC’D (YY/MM/DD) |
| 42d. TOTAL CONTAINERS |
STANDARD FORM 1449 (REV. 4/2002) BACK
PERFORMANCE WORK STATEMENT
The Contractor shall furnish all labor, supervision, transportation, equipment, supplies, and incidentals necessary to complete the required janitorial services, in accordance with the attached specifications, for the following buildings on the Prairie City Ranger District, Malheur National Forest: Building #2005, 2008, 2009, 2302, 2210, and Wellness Room. Building 2210 and the Wellness Room are 1 ½ blocks North of the District Office, on Johnson St. in Prairie City, OR.
Services shall be provided between the hours of 6:00 pm through 6:00 am.
PROJECT LOCATIONS AND SPECIFICATIONS
The Government is not responsible for any error or variation in the square footage listed, nor will the Contractor, because of any error or variation in the square footage listed, be relieved of his/her responsibility to carry out the contract in accordance with the true intent and meaning of the specifications and there shall be no additional cost to the Government based solely on an error or variation in the square footage listed.
Building # 2005, 327 SW Front St – Front Office This building is 2 stories, 3,746 sq. ft carpeted, 310 sq. ft linoleum (total 4056 sq. ft.), with 2 restrooms. This building has 2 interior windows, 16 exterior windows and 2 exterior door windows.
Building # 2008, 327 SW Front St. – Double Wide Office This building has 1423 sq. ft. carpeted and 172 sq. ft. linoleum (total 1595 sq. ft.), with 1 restroom and 1 kitchen area. This building has 6 exterior windows.
Building # 2009, 327 SW Front St. – Triple Wide Fire Office This building has 2316 sq. ft. carpeted and 30 sq. ft of linoleum (total 2346 sq. ft.) with 1 restroom. There are 9 exterior windows and 4 exterior walkway windows.
Building # 2302, 327 SW Front St – Truck Shed Office This building has 1550 sq. ft. carpeted and 250 sq. ft. linoleum (total 1800 sq. ft.) with 2 restrooms and 1 kitchen area. There are 8 exterior windows.
Building # 2210, 144 North Johnson St. – Warehouse Fire Office This building has 550 sq. ft. carpeted with 2 restrooms (painted wood floors). There are 12 exterior windows and the planting shed has 3 exterior windows.
Wellness Room, 146 North Johnson St. – Brown Warehouse This building has 411 sq. ft. rubber floor mats and/or carpet and 45 sq. ft linoleum (total 456 sq. ft.), with 1 restroom. There are 3 exterior windows.
WORK PERFORMANCE STANDARDS
Floors:
· All floors shall be swept, mopped, vacuumed or otherwise cleaned as necessary to provide a clean and debris free appearance without disturbing the wax base where applicable.
· All carpets shall be spot cleaned as necessary to remove stains and shall be shampooed no less than twice a year. (minimum of April and October)
· All vinyl floors shall be stripped, waxed and buffed no less than twice a year. (minimum of April and October)
· Areas around furniture and under furniture with a vertical clearance shall be kept clean and free of debris.
· Work does not include picking up of items left on the floor by personnel.
· The Contractor shall notify the Contracting Officer’s Representative (COR) 5 days prior to waxing and/or shampooing floors in order to make arrangements to allow for removal of employee personal items from the floors.
Ceilings, Walls, Doors, Windows, and Blinds:
· All ceilings, walls, doors and windows shall be cleaned as necessary to remove stains, streaks, smudges or other grime.
· All corners, flat surfaces, window ledges, and Venetian blinds shall be cleaned as necessary to be free of dirt, dust, and cobwebs inside buildings.
· Windows that have their bottoms at a height greater than 4 feet are not included under the resultant contract.
Restrooms, Kitchen Areas & Drinking Fountains:
· All drinking fountains shall be cleaned and disinfected as necessary to remove watermarks, incrustations and debris.
All fixtures and equipment, to include stalls, toilets, basins, dispensers, counters, railings, door knobs, light switches, mirrors, and other fixtures shall be cleaned and disinfected as necessary to remove all trash, dirt, stains, smudges, and watermarks.
· All paper products, soap dispensers, and odor absorbing deodorizers shall be replenished as necessary to maintain adequate supplies for each bathroom and kitchen area.
Cleaning Furniture
All fabric, glass, wood, and metal furniture shall be dusted and vacuumed as necessary to maintain a clean appearance.
All map and bookcases, shelves, and desk partitions shall be dusted and cleaned as necessary to maintain a clean appearance.
Do not move or remove paper documents, files, and etc.
Waste Water, Trash, & Containers:
All trash containers shall be emptied as necessary to prevent trash overflow.
All containers shall be cleaned and disinfected as necessary to maintain a clean appearance.
All plastic liners that are torn, worn, or contain residue shall be replaced.
All trash and waste will be disposed of in a government provided dumpster. Dumpster lids shall be closed after each refuse deposit.
All wastewater shall be disposed of in the restroom toilets.
Exterior Steps, Walkways, & Windows All specified District Office’s steps, porches, landings and walkways shall be swept and cleaned as necessary to be clear from obstacles, cobwebs and debris. Excludes snow removal.
All windows, window frames, screens and seals shall be cleaned to remove stains, streaks, smudges, cobwebs and other grime. (Minimum April and October)
ACCEPTABLE QUALITY LEVELS
The Government will record inspection observations in a written inspection report that is based upon all the written performance standards in this contract.
When unacceptable performance is observed, the Contractor will be notified in writing. Failure to correct unsatisfactory performance or continued failure to perform satisfactorily may be grounds for termination of the Contractor’s right to proceed, with work under contract.
CONTRACTOR QUALITY CONTROL SYSTEM
The Contractor shall identify the quality control inspection system it will use to ensure that contract specifications will be achieved. At no time shall the contractor rely upon Government inspections to provide notification of unsatisfactory performance. The Contractor shall produce written inspection records in a format and at times and places satisfactory to the Contracting Officer. Inspection records shall be made available upon request of the Contracting Officer and be maintained until the date of contract closure. The Contracting Officer may observe the Contractor's inspection at any time and shall otherwise have unlimited access to the inspection data.
The Contractor shall provide a job-specific quality control plan at the post award conference.
GOVERNMENT QUALITY ASSURANCE SURVEILLANCE PLAN
(a) The Government will make inspections periodically as work progresses or is completed to determine compliance with contract specifications and acceptability of work. Inspections will provide the basis for measurement of payments. Acceptance of work will be based on the Government’s evaluation of the work results, not the method of performance.
(b) If the Government inspections indicate that work is not performed in accordance with the contract specifications, the COR will immediately notify the Contractor in writing and order rework and improvement in the quality of work.
(c) The Government will record inspection observations in a written report. Government inspection will consist of the following:
Floors: Visually inspect all floors to ensure they have a clean and debris free appearance.
Ceilings, Walls, Doors, Windows, and Blinds: Visually inspect to ensure that dust, stains, streaks, smudges, and other grime is removed.
Restrooms, Kitchen Areas & Drinking Fountains: Visually inspect fixtures and equipment to ensure that all trash, dirt, stains, smudges and watermarks have been removed. Check that dispensers have been replenished and drinking fountains have watermarks, incrustations, and debris removed.
Furniture: Visually inspect to ensure that furniture has a clean appearance.
Waste Water, Trash & Containers: Visually inspect containers to ensure that they have been emptied, have a clean appearance and liners replaced as needed. Ensure all waste and waste water has been disposed of properly.
MEASUREMENT AND PAYMENT
Payment will be made monthly in arrears for janitorial services satisfactorily provided. Payment may be withheld, at the Governments discretion, until all performance standards have been met.
Funds are not presently available for performance under this contract beyond September 30, 2010. The Government’s obligation for performance of this contract beyond that date is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise for performance under this contract beyond September 30, 2010, until funds are made available to the Contracting Officer for performance and until the Contractor receives notice of availability, to be confirmed in writing by the Contracting Officer.
It is possible that the Prairie City Ranger District may be required to move to a new facility within the next 3 years. If this occurs prior to December 2112, the Contractor will be given written notification and the contract will be terminated at the time services are no longer required.
AGAR 452.215-73 POST AWARD CONFERENCE (NOV 1996)
A post award conference with the successful offeror is required. It will be scheduled within 10 days after the date of contract award. The conference will be held at a mutually agreed upon location.
NOTE: Contractor designated representative(s) or foreman (whomever the Contractor will have on the site) shall be present at the post award conference.
FAR 52.211-10 COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than October 1, 2009 for the base year. The time stated for completion shall include final cleanup of the premises. The completion of work, including the option years is October 31, 2012.
NOTE: Estimated start work date and contract time is as follows:
| ITEM NO. |
| ESTIMATED START WORK DATE |
| CONTRACT TIME (Calendar Days) |
| Base Item 1 |
| October 1, 2009 |
| Through September 30, 2010 |
| Option Item 2 |
| October 1, 2010 |
| Through September 30, 2011 |
| Option Item 3 |
| October 1, 2011 |
| Through September 30, 2012 |
FAR 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT
(a) The Government may extend the term of this contract by written notice to the Contractor within 60 days; provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 60 days before the contract expires. The preliminary notice does not commit the Government to an extension.
(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.
(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed September 30, 2012; unless mutually accepted by both Contractor and Contracting Officer.
FAR 52.217-4 EVALUATION OF OPTIONS (JULY 1990)
Except when it is determined in accordance with FAR 17.206(b) not to be in the Government’s best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).
SAFETY
Prevention of Slips and Falls
· To help prevent accidents, the Contractor shall post wet floor areas with signs or barricade areas to restrict access.
· The Contractor shall post signs whenever mopping, stripping, or finishing floors.
· Pay particular attention on stormy days to building entrances, stairways, hallways and restrooms.
Safe Use of Cleaning Materials and Other Chemicals
Maintenance and custodial work requires the use of several cleaning materials. Some of these can be dangerous if used improperly. The Contractor shall implement the following procedures at a minimum:
Keep materials labeled.
· Follow the directions for use. Be sure the chemical is properly diluted.
· Wear protective garments such as rubber gloves or goggles if necessary or required.
· Provide adequate ventilation to prevent the buildup of fumes or gases.
· If an individual is exposed to a chemical, get prompt attention; and, if necessary, get medical help. Check the Material Safety Data Sheet (MSDS) for the material and/or the label on the container.
· Do not use unknown chemicals. Find out what it is or dispose of it safely.
Electrical Hazards
Electrically-powered equipment can be dangerous if used improperly. Use of electrical equipment on a wet floor or under wet conditions can be very dangerous. The Contractor shall follow these procedures at a minimum:
· Do not use equipment with a spliced cord or with cut or exposed wires, broken wires, a short, or a damaged ground.
· Report damaged equipment, any equipment that gives a shock, or grounds that have been tampered with to your supervisor.
· Ground all equipment before use.
Fire Safety and Prevention
Always be alert to recognize potential fire hazards. If smoke or fire is discovered:
· Immediately evacuate the area of the fire.
· Evacuate the building.
· Sound the alarm if possible.
· Call the fire department, then your supervisor and the Government (COR).
In addition, Contractors shall submit a safety plan to the Contracting Officer, in compliance with the Occupational Safety and Health Administration (OSHA). A job-specific safety plan shall be submitted prior to start work or at the post-award conference.
FIRE NOTIFICATION
Contractor's Responsibility for Notification in Case of Fire
The Contractor shall immediately notify the Government of any fires sighted on or in the vicinity of the work site.
GOVERNMENT-FURNISHED PROPERTY
The Government will provide a key for gate access and a Wellness Room access key, a gate key and access key to Warehouse Fire Office, and the combination to the other office buildings. The Government will provide a secure storage area for janitorial supplies and equipment.
PERSONAL PROTECTIVE EQUIPMENT
The contractor will train in the safe operation and use of equipment to all workers using equipment.
Personal protective equipment, including personal protective equipment for eyes, face, head, and extremities shall be provided, used, and maintained in a sanitary and reliable condition wherever it is necessary by reason of hazards or processes encountered in a manner capable of causing injury or impairment in the function of any part of the body.
Defective or damaged personal protective equipment shall not be used.
The contractor shall provide, at no cost to the employee, eye protection where there is potential for eye injury due to flying objects. This eye protection must meet the minimum requirements of ANSI standard Z87.1-2003.
The contractor shall provide, at no cost to the employee, hearing protection where there is a potential for hearing loss due to high intensity noise, if necessary.
KEYS
The Government will provide door keys/combinations as required for admittance of Contractor’s employees after hours for the buildings covered under the resultant contract. The Contractor shall be responsible for any damage, theft, or other misconduct of employees if unauthorized entry into a building is gained by use of the Government provided keys/combinations. Keys shall be returned to the Contracting Officer’s Representative prior to the final payment. If the keys are not returned, final payment may be held.
SECURITY
The government may require additional screening for security measures of the Contractor and any employee of the Contractor’s firm. Screening and record searches may require additional information to be provided to the Government upon request. Failure to provide the information requested by the Government within a reasonable time frame may result in termination of the Contractor’s right to proceed. The Government reserves the Access to a Government facility shall be limited to only those individuals employed by the Contractor. While cleaning, no building shall be left unlocked. Contractor shall not admit others to the buildings. The Government reserves the right to remove any Contractor employee or awardee that is, in the Government’s estimation, a security risk for the Government.
FAR 52.204-9 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL (SEPT 2007)
(a) The Contractor shall comply with agency personal identity verification procedures identified in the contract that implement Homeland Security Presidential Directive-12 (HSPD-12), Office of Management and Budget (OMB) guidance M-05-24 and Federal Information Processing Standards Publication (FIPS PUB) Number 201.
(b) The Contractor shall insert this clause in all subcontracts when the subcontractor is required to have routine physical access to a Federally-controlled facility and/or routine access to a Federally-controlled information system.
AGAR 452.204-71 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR EMPLOYEES (MAR 2006)
(a) The contractor shall comply with the personal identity verification (PIV) policies and procedures established by the Department of Agriculture (USDA) Directives 3800 series.
AGAR Advisory No. 81, Page 4 of 7
(b) Should the results of the PIV process require the exclusion of a contractor’s employee, the contracting officer will notify the contractor in writing.
(c) The contractor must appoint a representative to manage this activity and to maintain a list of employees eligible for a USDA PIV ID Badge required for performance of the work.
(d) The responsibility of maintaining a sufficient workforce remains with the contractor. Employees may be barred by the Government from performance of work should they be found ineligible or to have lost eligibility for a USDA PIV ID Badge. Failure to maintain a sufficient workforce of employees eligible for a USDA PIV ID Badge may be grounds for termination of the contract.
(e) The contractor shall insert this clause in all subcontracts when the subcontractor is required to have routine physical access to a Federally-controlled facility and/or routine access to a Federally-controlled information system.
(f) The PIV Sponsor for this contract is the contracting officer representative (COR), unless otherwise specified in this contract. The PIV Sponsor will be available to receive contractor identity information from Monday through Friday, 8:00am to 4:30pm at the Malheur National Forest Supervisor’s Office. The Government shall notify the contractor if there is a change in the PIV Sponsor, the office address, or the office hours for registration.
FAR 52.212-4 CONTRACT TERMS AND CONDITIONS – COMMERCIAL ITEMS (MAR 2009)
(a) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. If repair/replacement or reperformance will not correct the defects or is not possible, the Government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services. The Government must exercise its post-acceptance rights—
(1) Within a reasonable time after the defect was discovered or should have been discovered; and
(2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.
(b) Assignment. The Contractor or its assignee may assign its rights to receive payment due as a result of performance of this contract to a bank, trust company, or other financing institution, including any Federal lending agency in accordance with the Assignment of Claims Act (31 U.S.C. 3727). However, when a third party makes payment (e.g., use of the Governmentwide commercial purchase card), the Contractor may not assign its rights to receive payment under this contract.
(c) Changes. Changes in the terms and conditions of this contract may be made only by written agreement of the parties.
(d) Disputes. This contract is subject to the Contract Disputes Act of 1978, as amended (41 U.S.C. 601-613). Failure of the parties to this contract to reach agreement on any request for equitable adjustment, claim, appeal or action arising under or relating to this contract shall be a dispute to be resolved in accordance with the clause at FAR 52.233-1, Disputes, which is incorporated herein by reference. The Contractor shall proceed diligently with performance of this contract, pending final resolution of any dispute arising under the contract.
(e) Definitions. The clause at FAR 52.202-1, Definitions, is incorporated herein by reference.
(f) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence such as, acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. The Contractor shall notify the Contracting Officer in writing as soon as it is reasonably possible after the commencement of any excusable delay, setting forth the full particulars in connection therewith, shall remedy such occurrence with all reasonable dispatch, and shall promptly give written notice to the Contracting Officer of the cessation of such occurrence.
(g) Invoice.
(1) The Contractor shall submit an original invoice and three copies (or electronic invoice, if authorized) to the address designated in the contract to receive invoices. An invoice must include—
(i) Name and address of the Contractor;
(ii) Invoice date and number;
(iii) Contract number, contract line item number and, if applicable, the order number;
(iv) Description, quantity, unit of measure, unit price and extended price of the items delivered;
(v) Shipping number and date of shipment, including the bill of lading number and weight of shipment if shipped on Government bill of lading;
(vi) Terms of any discount for prompt payment offered;
(vii) Name and address of official to whom payment is to be sent;
(viii) Name, title, and phone number of person to notify in event of defective invoice; and
(ix) Taxpayer Identification Number (TIN). The Contractor shall include its TIN on the invoice only if required elsewhere in this contract.
(x) Electronic funds transfer (EFT) banking information.
(A) The Contractor shall include EFT banking information on the invoice only if required elsewhere in this contract.
(B) If EFT banking information is not required to be on the invoice, in order for the invoice to be a proper invoice, the Contractor shall have submitted correct EFT banking information in accordance with the applicable solicitation provision, contract clause (e.g., 52.232-33, Payment by Electronic Funds Transfer—Central Contractor Registration, or 52.232-34, Payment by Electronic Funds Transfer—Other Than Central Contractor Registration), or applicable agency procedures.
(C) EFT banking information is not required if the Government waived the requirement to pay by EFT.
(2) Invoices will be handled in accordance with the Prompt Payment Act (31 U.S.C. 3903) and Office of Management and Budget (OMB) prompt payment regulations at 5 CFR Part 1315.
(h) Patent indemnity. The Contractor shall indemnify the Government and its officers, employees and agents against liability, including costs, for actual or alleged direct or contributory infringement of, or inducement to infringe, any United States or foreign patent, trademark or copyright, arising out of the performance of this contract, provided the Contractor is reasonably notified of such claims and proceedings.
(i) Payment.—
(1) Items accepted. Payment shall be made for items accepted by the Government that have been delivered to the delivery destinations set forth in this contract.
(2) Prompt payment. The Government will make payment in accordance with the Prompt Payment Act (31 U.S.C. 3903) and prompt payment regulations at 5 CFR Part 1315.
(3) Electronic Funds Transfer (EFT). If the Government makes payment by EFT, see 52.212-5(b) for the appropriate EFT clause.
(4) Discount. In connection with any discount offered for early payment, time shall be computed from the date of the invoice. For the purpose of computing the discount earned, payment shall be considered to have been made on the date which appears on the payment check or the specified payment date if an electronic funds transfer payment is made.
(5) Overpayments. If the Contractor becomes aware of a duplicate contract financing or invoice payment or that the Government has otherwise overpaid on a contract financing or invoice payment, the Contractor shall—
(i) Remit the overpayment amount to the payment office cited in the contract along with a description of the overpayment including the—
(A) Circumstances of the overpayment (e.g., duplicate payment, erroneous payment, liquidation errors, date(s) of overpayment);
(B) Affected contract number and delivery order number, if applicable;
(C) Affected contract line item or subline item, if applicable; and
(D) Contractor point of contact.
(ii) Provide a copy of the remittance and supporting documentation to the Contracting Officer.
(6) Interest.
(i) All amounts that become payable by the Contractor to the Government under this contract shall bear simple interest from the date due until paid unless paid within 30 days of becoming due. The interest rate shall be the interest rate established by the Secretary of the Treasury as provided in Section 611 of the Contract Disputes Act of 1978 (Public Law 95-563), which is applicable to the period in which the amount becomes due, as provided in (i)(6)(v) of this clause, and then at the rate applicable for each six-month period as fixed by the Secretary until the amount is paid.
(ii) The Government may issue a demand for payment to the Contractor upon finding a debt is due under the contract.
(iii) Final decisions. The Contracting Officer will issue a final decision as required by 33.211 if—
(A) The Contracting Officer and the Contractor are unable to reach agreement on the existence or amount of a debt within 30 days;
(B) The Contractor fails to liquidate a debt previously demanded by the Contracting Officer within the timeline specified in the demand for payment unless the amounts were not repaid because the Contractor has requested an installment payment agreement; or
(C) The Contractor requests a deferment of collection on a debt previously demanded by the Contracting Officer (see 32.607-2).
(iv) If a demand for payment was previously issued for the debt, the demand for payment included in the final decision shall identify the same due date as the original demand for payment.
(v) Amounts shall be due at the earliest of the following dates:
(A) The date fixed under this contract.
(B) The date of the first written demand for payment, including any demand for payment resulting from a default termination.
(vi) The interest charge shall be computed for the actual number of calendar days involved beginning on the due date and ending on—
(A) The date on which the designated office receives payment from the Contractor;
(B) The date of issuance of a Government check to the Contractor from which an amount otherwise payable has been withheld as a credit against the contract debt; or
(C) The date on which an amount withheld and applied to the contract debt would otherwise have become payable to the Contractor.
(vii) The interest charge made under this clause may be reduced under the procedures prescribed in 32.608-2 of the Federal Acquisition Regulation in effect on the date of this contract.
(j) Risk of loss. Unless the contract specifically provides otherwise, risk of loss or damage to the supplies provided under this contract shall remain with the Contractor until, and shall pass to the Government upon:
(1) Delivery of the supplies to a carrier, if transportation is f.o.b. origin; or
(2) Delivery of the supplies to the Government at the destination specified in the contract, if transportation is f.o.b. destination.
(k) Taxes. The contract price includes all applicable Federal, State, and local taxes and duties.
(l) Termination for the Government’s convenience. The Government reserves the right to terminate this contract, or any part hereof, for its sole convenience. In the event of such termination, the Contractor shall immediately stop all work hereunder and shall immediately cause any and all of its suppliers and subcontractors to cease work. Subject to the terms of this contract, the Contractor shall be paid a percentage of the contract price reflecting the percentage of the work performed prior to the notice of termination, plus reasonable charges the Contractor can demonstrate to the satisfaction of the Government using its standard record keeping system, have resulted from the termination. The Contractor shall not be required to comply with the cost accounting standards or contract cost principles for this purpose. This paragraph does not give the Government any right to audit the Contractor’s records. The Contractor shall not be paid for any work performed or costs incurred which reasonably could have been avoided.
(m) Termination for cause. The Government may terminate this contract, or any part hereof, for cause in the event of any default by the Contractor, or if the Contractor fails to comply with any contract terms and conditions, or fails to provide the Government, upon request, with adequate assurances of future performance. In the event of termination for cause, the Government shall not be liable to the Contractor for any amount for supplies or services not accepted, and the Contractor shall be liable to the Government for any and all rights and remedies provided by law. If it is determined that the Government improperly terminated this contract for default, such termination shall be deemed a termination for convenience.
(n) Title. Unless specified elsewhere in this contract, title to items furnished under this contract shall pass to the Government upon acceptance, regardless of when or where the Government takes physical possession.
(o) Warranty. The Contractor warrants and implies that the items delivered hereunder are merchantable and fit for use for the particular purpose described in this contract.
(p) Limitation of liability. Except as otherwise provided by an express warranty, the Contractor will not be liable to the Government for consequential damages resulting from any defect or deficiencies in accepted items.
(q) Other compliances. The Contractor shall comply with all applicable Federal, State and local laws, executive orders, rules and regulations applicable to its performance under this contract.
(r) Compliance with laws unique to Government contracts. The Contractor agrees to comply with 31 U.S.C. 1352 relating to limitations on the use of appropriated funds to influence certain Federal contracts; 18 U.S.C. 431 relating to officials not to benefit; 40 U.S.C. 3701, et seq., Contract Work Hours and Safety Standards Act; 41 U.S.C. 51-58, Anti-Kickback Act of 1986; 41 U.S.C. 265 and 10 U.S.C. 2409 relating to whistleblower protections; Section 1553 of the American Recovery and Reinvestment Act of 2009 relating to whistleblower protections for contracts funded under that Act; 49 U.S.C. 40118, Fly American; and 41 U.S.C. 423 relating to procurement integrity.
(s) Order of precedence. Any inconsistencies in this solicitation or contract shall be resolved by giving precedence in the following order:
(1) The schedule of supplies/services.
(2) The Assignments, Disputes, Payments, Invoice, Other Compliances, and Compliance with Laws Unique to Government Contracts paragraphs of this clause.
(3) The clause at 52.212-5.
(4) Addenda to this solicitation or contract, including any license agreements for computer software.
(5) Solicitation provisions if this is a solicitation.
(6) Other paragraphs of this clause.
(7) The Standard Form 1449.
(8) Other documents, exhibits, and attachments.
(9) The specification.
(t) Central Contractor Registration (CCR).
(1) Unless exempted by an addendum to this contract, the Contractor is responsible during performance and through final payment of any contract for the accuracy and completeness of the data within the CCR database, and for any liability resulting from the Government’s reliance on inaccurate or incomplete data. To remain registered in the CCR database after the initial registration, the Contractor is required to review and update on an annual basis from the date of initial registration or subsequent updates its information in the CCR database to ensure it is current, accurate and complete. Updating information in the CCR does not alter the terms and conditions of this contract and is not a substitute for a properly executed contractual document.
(2)(i) If a Contractor has legally changed its business name, “doing business as” name, or division name (whichever is shown on the contract), or has transferred the assets used in performing the contract, but has not completed the necessary requirements regarding novation and change-of-name agreements in FAR Subpart 42.12, the Contractor shall provide the responsible Contracting Officer a minimum of one business day’s written notification of its intention to (A) change the name in the CCR database; (B) comply with the requirements of Subpart 42.12; and (C) agree in writing to the timeline and procedures specified by the responsible Contracting Officer. The Contractor must provide with the notification sufficient documentation to support the legally changed name.
(ii) If the Contractor fails to comply with the requirements of paragraph (t)(2)(i) of this clause, or fails to perform the agreement at paragraph (t)(2)(i)(C) of this clause, and, in the absence of a properly executed novation or change-of-name agreement, the CCR information that shows the Contractor to be other than the Contractor indicated in the contract will be considered to be incorrect information within the meaning of the “Suspension of Payment” paragraph of the electronic funds transfer (EFT) clause of this contract.
(3) The Contractor shall not change the name or address for EFT payments or manual payments, as appropriate, in the CCR record to reflect an assignee for the purpose of assignment of claims (see Subpart 32.8, Assignment of Claims). Assignees shall be separately registered in the CCR database. Information provided to the Contractor’s CCR record that indicates payments, including those made by EFT, to an ultimate recipient other than that Contractor will be considered to be incorrect information within the meaning of the “Suspension of payment” paragraph of the EFT clause of this contract.
(4) Offerors and Contractors may obtain information on registration and annual confirmation requirements via the internet at http://www.ccr.gov or by calling 1-888-227-2423 or 269-961-5757.
(End of clause)
ADDENDUM TO FAR 52.212-4
The following clauses are hereby incorporated by reference or full text as appropriate:
FAR 52.236-7 PERMITS AND RESPONSIBILITIES (NOV 1991)
FAR 52.236-13 ACCIDENT PREVENTION (NOV 1991)
FAR 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS—COMMERCIAL ITEMS (AUG 2009)
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
(1) 52.222-50, Combating Trafficking in Persons (Feb 2009) (22 U.S.C. 7104(g)).
___Alternate I (Aug 2007) of 52.222-50 (22 U.S.C. 7104(g)).
(2) 52.233-3, Protest After Award (Aug 1996) (31 U.S.C. 3553).
(3) 52.233-4, Applicable Law for Breach of Contract Claim (Oct 2004) (Pub. L. 108-77, 108-78).
(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
__ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Sept 2006), with Alternate I (Oct 1995) (41 U.S.C. 253g and 10 U.S.C. 2402).
__ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Dec 2008) (Pub. L. 110-252, Title VI, Chapter 1 (41 U.S.C. 251 note)).
__ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (MAR 2009) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)
__ (4) 52.204-11, American Recovery and Reinvestment Act—Reporting Requirements (Mar 2009) (Pub. L. 111-5).
__ (5) 52.219-3, Notice of Total HUBZone Set-Aside (Jan 1999) (15 U.S.C. 657a).
__ (6) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (July 2005) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).
__ (7) [Reserved]
_X_ (8)(i) 52.219-6, Notice of Total Small Business Set-Aside (June 2003) (15 U.S.C. 644).
__ (ii) Alternate I (Oct 1995) of 52.219-6.
__ (iii) Alternate II (Mar 2004) of 52.219-6.
__ (9)(i) 52.219-7, Notice of Partial Small Business Set-Aside (June 2003) (15 U.S.C. 644).
__ (ii) Alternate I (Oct 1995) of 52.219-7.
__ (iii) Alternate II (Mar 2004) of 52.219-7.
__ (10) 52.219-8, Utilization of Small Business Concerns (May 2004) (15 U.S.C. 637(d)(2) and (3)).
__ (11)(i) 52.219-9, Small Business Subcontracting Plan (Apr 2008) (15 U.S.C. 637(d)(4)).
__ (ii) Alternate I (Oct 2001) of 52.219-9.
__ (iii) Alternate II (Oct 2001) of 52.219-9.
__ (12) 52.219-14, Limitations on Subcontracting (Dec 1996) (15 U.S.C. 637(a)(14)).
__ (13) 52.219-16, Liquidated Damages—Subcon-tracting Plan (Jan 1999) (15 U.S.C. 637(d)(4)(F)(i)).
__ (14)(i) 52.219-23, Notice of Price Evaluation Adjustment for Small Disadvantaged Business Concerns (Oct 2008) (10 U.S.C. 2323) (if the offeror elects to waive the adjustment, it shall so indicate in its offer).
__ (ii) Alternate I (June 2003) of 52.219-23.
__ (15) 52.219-25, Small Disadvantaged Business Participation Program—Disadvantaged Status and Reporting (Apr 2008) (Pub. L. 103-355, section 7102, and 10 U.S.C. 2323).
__ (16) 52.219-26, Small Disadvantaged Business Participation Program— Incentive Subcontracting (Oct 2000) (Pub. L. 103-355, section 7102, and 10 U.S.C. 2323).
__ (17) 52.219-27, Notice of Total Service-Disabled Veteran-Owned Small Business Set-Aside (May 2004) (15 U.S.C. 657 f).
_X_ (18) 52.219-28, Post Award Small Business Program Rerepresentation (Apr 2009) (15 U.S.C. 632(a)(2)).
_X_ (19) 52.222-3, Convict Labor (June 2003) (E.O. 11755).
_X_ (20) 52.222-19, Child Labor—Cooperation with Authorities and Remedies (Aug 2009) (E.O. 13126).
_X_ (21) 52.222-21, Prohibition of Segregated Facilities (Feb 1999).
_X_ (22) 52.222-26, Equal Opportunity (Mar 2007) (E.O. 11246).
_X_ (23) 52.222-35, Equal Opportunity for Special Disabled Veterans, Veterans of the Vietnam Era, and Other Eligible Veterans (Sept 2006) (38 U.S.C. 4212).
_X_ (24) 52.222-36, Affirmative Action for Workers with Disabilities (Jun 1998) (29 U.S.C. 793).
__ (25) 52.222-37, Employment Reports on Special Disabled Veterans, Veterans of the Vietnam Era, and Other Eligible Veterans (Sept 2006) (38 U.S.C. 4212).
__ (26) 52.222-39, Notification of Employee Rights Concerning Payment of Union Dues or Fees (Dec 2004) (E.O. 13201).
__ (27) 52.222-54, Employment Eligibility Verification (Jan 2009). (Executive Order 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial items as prescribed in 22.1803.)
__ (28)(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA–Designated Items (May 2008) (42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
__ (ii) Alternate I (May 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
__ (29) 52.223-15, Energy Efficiency in Energy-Consuming Products (Dec 2007) (42 U.S.C. 8259b).
__ (30)(i) 52.223-16, IEEE 1680 Standard for the Environmental Assessment of Personal Computer Products (Dec 2007) (E.O. 13423).
__ (ii) Alternate I (Dec 2007) of 52.223-16.
__ (31) 52.225-1, Buy American Act—Supplies (Feb 2009) (41 U.S.C. 10a-10d).
__ (32)(i) 52.225-3, Buy American Act—Free Trade Agreements—Israeli Trade Act (June 2009) (41 U.S.C. 10a-10d, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, Pub. L. 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, and 110-138).
__ (ii) Alternate I (Jan 2004) of 52.225-3.
__ (iii) Alternate II (Jan 2004) of 52.225-3.
__ (33) 52.225-5, Trade Agreements (Aug 2009) (19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).
__ (34) 52.225-13, Restrictions on Certain Foreign Purchases (June 2008) (E.O.’s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).
__ (35) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007) (42 U.S.C. 5150).
__ (36) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (Nov 2007) (42 U.S.C. 5150).
__ (37) 52.232-29, Terms for Financing of Purchases of Commercial Items (Feb 2002) (41 U.S.C. 255(f), 10 U.S.C. 2307(f)).
__ (38) 52.232-30, Installment Payments for Commercial Items (Oct 1995) (41 U.S.C. 255(f), 10 U.S.C. 2307(f)).
_X_ (39) 52.232-33, Payment by Electronic Funds Transfer—Central Contractor Registration (Oct 2003) (31 U.S.C. 3332).
__ (40) 52.232-34, Payment by Electronic Funds Transfer—Other than Central Contractor Registration (May 1999) (31 U.S.C. 3332).
__ (41) 52.232-36, Payment by Third Party (May 1999) (31 U.S.C. 3332).
__ (42) 52.239-1, Privacy or Security Safeguards (Aug 1996) (5 U.S.C. 552a).
__ (43)(i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Feb 2006) (46 U.S.C. Appx. 1241(b) and 10 U.S.C. 2631).
__ (ii) Alternate I (Apr 2003) of 52.247-64.
(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
_X_ (1) 52.222-41, Service Contract Act of 1965 (Nov 2007) (41 U.S.C. 351, et seq.).
_X_ (2) 52.222-42, Statement of Equivalent Rates for Federal Hires (May 1989) (29 U.S.C. 206 and 41 U.S.C. 351, et seq.).
__ (3) 52.222-43, Fair Labor Standards Act and Service Contract Act—Price Adjustment (Multiple Year and Option Contracts) (Nov 2006) (29 U.S.C. 206 and 41 U.S.C. 351, et seq.).
__ (4) 52.222-44, Fair Labor Standards Act and Service Contract Act—Price Adjustment (Feb 2002) (29 U.S.C. 206 and 41 U.S.C. 351, et seq.).
__ (5) 52.222-51, Exemption from Application of the Service Contract Act to Contracts for Maintenance, Calibration, or Repair of Certain Equipment—Requirements (Nov 2007) (41 351, et seq.).
__ (6) 52.222-53, Exemption from Application of the Service Contract Act to Contracts for Certain Services—Requirements (Feb 2009) (41 U.S.C. 351, et seq.).
__ (7) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (Mar 2009) (Pub. L. 110-247).
__ (8) 52.237-11, Accepting and Dispensing of $1 Coin (Sept 2008) (31 U.S.C. 5112(p)(1)).
(d) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph (d) if this contract was awarded…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .