Minutes from Site Visit
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF-30_-_Amd_2_-_AG-04GG-S-17-0010_.pdf | ||
| HVAC_Upgrade_As-Builts.pdf | ||
| Conformed_AG-04GG-S-17-0010_Amd_0001.pdf | ||
| Site_Visit_Handout.pdf | ||
| SF-30_-_Amd_1_-_AG-04GG-S-17-0010.pdf | ||
| Balance_Report_2014-01-24.pdf | ||
| AG-04GG-S-17-0010.pdf | ||
| Atch_2_-_Drawings.pdf | ||
| Atch_5_Past_Performance_Data_Sheet.docx | DOCX document | |
| Atch_3_-_Wage_Decision_OR170025.pdf | ||
| Atch_1_-_Specifications.pdf | ||
| Atch_4_Fire_clauses_r6-fs-6300-52.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Minutes from Pre-Construction Conference/Site visit Paraloft Roof Replacement
AG-04GG-S-17-0005
Redmond Air Center
February 2, 2017
Attendees:
NAME COMPANY EMAIL
Barbara Darling USFS, Contracting Officer barbaradarling@fs.fed.us Simon Freeman USFS, Civil Engineer sfreeman02@fs.fed.us Eve Ponder Cache Manager Shamra Tucker Cache Assistant Manager Matt Rex Tomco Electric matt@tomcoelectric.com JJ Macedo DSL Builders jjm@dsl-builders.com Andy Shuck SeaBee Construction a.shuck@builtbyseabee.com
1. Barb Darling, Contracting Officer, opened the meeting by going over the RFP requirements as outlined in the attached Site Visit handouts, highlighted below:
a. Funds are NOT presently available.
b. Project site not accessible until after Fire Season – 1 Nov.
c. Summarized requirements for technical, past performance and price proposals.
d. Reiterated wage and benefit requirements from the wage decision.
e. Best value acquisition, technical and past performance are rated on a scale giving government ability to pay more for better rating, but not required to.
f. Proposals are due by email by March 1, 2017 at 2:00 pm. PST.
2. Before going to tour the site, questions were answered by Barb Darling and Simon Freeman as follows:
a. Question: Is there a cut-off for questions on the solicitation?
Answer: No, however, please ask as soon as possible we have time to answer them and give you adequate time to include in your proposal.
b. Question: Are there low voltage conduits between the buildings?
Answer: All low voltage services enter the building on the North side. See Spec 26 00 01.
c. Question: Is the new fire alarm 100% conduit?
Answer: On Drawing FP104, General, Note 6 it states “all wiring shall be installed in rigid, EMT or flexible conduit.”
d. Question: Where will inventory have to be moved to and does contractor have to provide the storage container?
Answer: No longer applicable. Option to remove inventory is deleted in Amendment 0001.
mailto:barbaradarling@fs.fed.us mailto:sfreeman02@fs.fed.us mailto:matt@tomcoelectric.com mailto:jjm@dsl-builders.com mailto:a.shuck@builtbyseabee.com
e. Question: What is the storage height?
Answer: Existing storage height varies, but the new design shall accommodate up to 16 feet of storage.
f. Question: Will the government move the racks or just the inventory?
Answer: Government will only move inventory, not the storage racks themselves.
g. Question: Are there any flammables or combustibles in the building?
Answer: Cache contains Class IV commodities (see NFPA 13).
h. Question: Will there need to be sprinklers in the racks?
Answer: New system must conform to drawings and specifications. See keyed note 7 on drawing sheet FP102 referring to NFPA 13 requirements.
i. Question: Is there any equipment in excess of 2000 CFM.
Answer: Yes there are multiple pieces of HVAC equipment exceeding 2000 CFM. See “Balance Report” for list of some equipment along with performance specs. 6 Unit Heaters also exceed 2000 CFM but are not shown in “Balance Report”. Exhaust fan listed as EF-02 in “Balance Report” has been replaced and possibly exceeds 2000 CFM.
Also see attached As-Built Drawings from when HVAC was upgraded for locations.
j. Question: Will there be a staging area and space for a job trailer?
Answer: Yes, that will be coordinated after award.
3. Amendment 0001 is also attached which reflectes these minutes and provides clarification on work hours.
Barbara K Darling
BARBARA K DARLING
Contracting Officer
Attachments:
1. Site Visit Handout
2. Balance Report (Information Only)
3. HVAC Upgrade As-Built Drawings (Information Only)
4. Amendment 0001
File details come from the government source that posted it. Updated .