Minutes_from_site_visit.pdf

PDF 84 KB Posted

Attached to
Fire Cache Fire Sprinkler and Alarm System Upgrade Federal contract opportunity
Solicitation number
AG-04GG-S-17-0010
Issued by
Department of Agriculture Forest Service R6-Pacific Northwest Region

About this file

Minutes from Site Visit

View the file

Other files for this federal contract opportunity

Other files attached to Fire Cache Fire Sprinkler and Alarm System Upgrade, newest first.
File Type Posted
SF-30_-_Amd_2_-_AG-04GG-S-17-0010_.pdf PDF
HVAC_Upgrade_As-Builts.pdf PDF
Conformed_AG-04GG-S-17-0010_Amd_0001.pdf PDF
Site_Visit_Handout.pdf PDF
SF-30_-_Amd_1_-_AG-04GG-S-17-0010.pdf PDF
Balance_Report_2014-01-24.pdf PDF
AG-04GG-S-17-0010.pdf PDF
Atch_2_-_Drawings.pdf PDF
Atch_5_Past_Performance_Data_Sheet.docx DOCX document
Atch_3_-_Wage_Decision_OR170025.pdf PDF
Atch_1_-_Specifications.pdf PDF
Atch_4_Fire_clauses_r6-fs-6300-52.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Minutes from Pre-Construction Conference/Site visit Paraloft Roof Replacement

AG-04GG-S-17-0005

Redmond Air Center

February 2, 2017

Attendees:

NAME COMPANY EMAIL

Barbara Darling USFS, Contracting Officer barbaradarling@fs.fed.us Simon Freeman USFS, Civil Engineer sfreeman02@fs.fed.us Eve Ponder Cache Manager Shamra Tucker Cache Assistant Manager Matt Rex Tomco Electric matt@tomcoelectric.com JJ Macedo DSL Builders jjm@dsl-builders.com Andy Shuck SeaBee Construction a.shuck@builtbyseabee.com

1. Barb Darling, Contracting Officer, opened the meeting by going over the RFP requirements as outlined in the attached Site Visit handouts, highlighted below:

a. Funds are NOT presently available.

b. Project site not accessible until after Fire Season – 1 Nov.

c. Summarized requirements for technical, past performance and price proposals.

d. Reiterated wage and benefit requirements from the wage decision.

e. Best value acquisition, technical and past performance are rated on a scale giving government ability to pay more for better rating, but not required to.

f. Proposals are due by email by March 1, 2017 at 2:00 pm. PST.

2. Before going to tour the site, questions were answered by Barb Darling and Simon Freeman as follows:

a. Question: Is there a cut-off for questions on the solicitation?

Answer: No, however, please ask as soon as possible we have time to answer them and give you adequate time to include in your proposal.

b. Question: Are there low voltage conduits between the buildings?

Answer: All low voltage services enter the building on the North side. See Spec 26 00 01.

c. Question: Is the new fire alarm 100% conduit?

Answer: On Drawing FP104, General, Note 6 it states “all wiring shall be installed in rigid, EMT or flexible conduit.”

d. Question: Where will inventory have to be moved to and does contractor have to provide the storage container?

Answer: No longer applicable. Option to remove inventory is deleted in Amendment 0001.

mailto:barbaradarling@fs.fed.us mailto:sfreeman02@fs.fed.us mailto:matt@tomcoelectric.com mailto:jjm@dsl-builders.com mailto:a.shuck@builtbyseabee.com

e. Question: What is the storage height?

Answer: Existing storage height varies, but the new design shall accommodate up to 16 feet of storage.

f. Question: Will the government move the racks or just the inventory?

Answer: Government will only move inventory, not the storage racks themselves.

g. Question: Are there any flammables or combustibles in the building?

Answer: Cache contains Class IV commodities (see NFPA 13).

h. Question: Will there need to be sprinklers in the racks?

Answer: New system must conform to drawings and specifications. See keyed note 7 on drawing sheet FP102 referring to NFPA 13 requirements.

i. Question: Is there any equipment in excess of 2000 CFM.

Answer: Yes there are multiple pieces of HVAC equipment exceeding 2000 CFM. See “Balance Report” for list of some equipment along with performance specs. 6 Unit Heaters also exceed 2000 CFM but are not shown in “Balance Report”. Exhaust fan listed as EF-02 in “Balance Report” has been replaced and possibly exceeds 2000 CFM.

Also see attached As-Built Drawings from when HVAC was upgraded for locations.

j. Question: Will there be a staging area and space for a job trailer?

Answer: Yes, that will be coordinated after award.

3. Amendment 0001 is also attached which reflectes these minutes and provides clarification on work hours.

Barbara K Darling

BARBARA K DARLING

Contracting Officer

Attachments:

1. Site Visit Handout

2. Balance Report (Information Only)

3. HVAC Upgrade As-Built Drawings (Information Only)

4. Amendment 0001

File details come from the government source that posted it. Updated .