AG-0489-S-10-0453 sol package.pdf
PDF 1 MB Posted
- Solicitation number
- AG-0489-S-10-0453
About this file
AG-0489-S-10-0453 Solicitation
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AG-0489-S-10-0453 Amend 3.pdf | ||
| AG-0489-S-10-0453 Amend 2.pdf | ||
| AG-0489-S-10-0453 Amend 1.pdf | ||
| Amendment No 1.docx | DOCX document | |
| FSSS_3-20-2010.pdf | ||
| FinalPlans.pdf | ||
| FS ARRA SIGN DETAILS 2apr09.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OMB APPROVAL NO. 2700-0042
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
AG-0489-S-10-0453
2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED
4/13/2010
PAGE OF PAGES
IMPORTANT - The “offer” section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
5. REQUISITION/PURCHASE REQUEST NO.
385989
6. PROJECT NO.
7. ISSUED BY CODE 8. ADDRESS OFFER TO
US Forest Service EROC Northwest 16400 Champion Way Sandy, OR 97055
US Forest Service EROC Northwest 16400 Champion Way Sandy, OR 97055
9. FOR INFORMATION
CALL:
A. NAME
Shirley Cochran
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
503 668-1445
SOLICITATION
NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder.”
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):
NOTE: This is a total HUBZone Set-Aside.
This Request for Proposal is issued under the provisions of the American Recovery and Reinvestment Act of
2009 (ARRA)
TAS::12 1102::TAS RECOVERY North Fork John Day Bridge Replacement
Wallowa Whitman National Forest, Grant County, Oregon
Technical Contact: Dana Taylor @ (541) 523-1274
The estimated amount of this project is between $500,000 and $1,000,000.
NOTE: FAX and email responses will not be accepted.
11. The Contractor shall begin performance within10 calendar days and complete it within 120 calendar days after receiving award, notice to proceed. This performance period is mandatory, negotiable. (See .)
12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If “YES,” indicate within how many calendar days after award in Item 12B.)
YES NO
12B. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and copies to perform the work required are due at the place specified in Item 8 by 1400 (hour) local time 5/13/2010 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, is not required.
C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Computer Generated Prescribed by GSA FAR (48 CFR) 53.236-1(e)
OFFER (Must be fully completed by offeror)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork at the prices specif ied below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government w ithin calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER
(Type or print)
20B. SIGNATURE
20C. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT
23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( )
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
US Forest Service; EROC Northwest 16400 Champion Way
Sandy, OR 97055
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return ____ copies to issuing office.) Contractor agrees to furnish and deliver all items or perf orm all work, requisitions identified on this form and any continuation sheets f or the consideration slated in this contract.
The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specif ications or incorporated by reference in or attached to this contract.
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED
TO SIGN (Type or print)
31A. NAME OF CONTRACTING OFFICER (Type or print)
Robert Williams
30B. SIGNATURE
30C. DATE
31B. UNITED STATES OF AMERICA
BY
31C. AWARD DATE
Computer Generated STANDARD FORM 1442 BACK (REV. 4-85)
TABLE OF CONTENTS
North Fork John Day Bridge Replacement
PART I – CONTRACT SPECIFICATIONS
SECTION A – SF-1442
SECTION B – Supplies or Services and Prices/Costs (Schedule of Items)
SECTION C – Descriptions/Specifications/Statement of Work
SECTION D – Packaging, Marking and Layout
SECTION E – Inspection and Acceptance
SECTION F – Deliveries and Performance
SECTION G – Contract Administrative Data
SECTION H – Special Contract Requirements
PART II – CONTRACT CLAUSES
SECTION I – Clauses Incorporated by Reference
AGAR/FSAR and SPECIAL CONTRACT CLAUSES
ARRA Required Clauses (full text)
PART III – LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
SECTION J – Exhibits, Attachments, and Appendices
PART IV – REPRESENTATIONS AND INSTRUCTIONS
SECTION K – Representations, Certifications and Other Statements of Offerors or
Respondents
SECTION L – Instructions to Offeror/Notices
SECTION M – Evaluation Factors for Award
Solicitation: AG-0489-S-10-0453 PAGE 4 of 86
PART I—THE SCHEDULE
SECTION B--SUPPLIES OR S ERVICES AND PRICES/COSTS SCHEDULE OF ITEMS
SCHEDULE OF ITEMS
ITEM
NO.
DESCRIPTION
Method of
Measure
Quantity
PAY
UNIT
UNIT
PRICE
TOTAL
Bid Items:
15101 Mobilization
ALL Lump
Sum
15205 Bridge and Roadway survey
& staking, precision A
15713 Soil erosion & pollution control
15950 Reconstruction Staking
ALL Mile
20102 Clearing and grubbing (for Bridge Construction), Disposal Method 6
ALL Lump
20302 Removal of existing roadway asphalt, Disposal Method (a)
CQ 6800 Square
Foot
20305 Removal of existing bridge, Disposal Method (a) and (d)
20494 Roadway excavation, compaction method B, Tolerance Class A
CQ 264 Cubic Yard
20801 Structure Excavation CQ 101 Cubic
20803 Structural Backfill CQ 24 Cubic
24901 Composite Road
Construction (Bypass Road Construction and Removal), Method K
308 Foot
25101 Placed riprap, class 4a CQ 294 Cubic
32201 Aggregate base, grading D, compaction method B, GFM
CQ 225 Cubic
40401 Minor Hot Asphalt Concrete, ODOT
Specification
Ton
55102 HP 12 X 53 piles, driven
12 Each
Solicitation: AG-0489-S-10-0453 PAGE 5 of 86
ITEM NO. DESCRIPTION M OF M QUANTITY PAY UNIT UNIT PRICE TOTAL
55109 HP 12 X 53 piles, furnished
660 Foot
55151 Furnish pile driving equipment
55152 Pile tip reinforcement
12 Each
55201 Structural concrete class A
(AE)
CQ 36 Cubic
55301 Precast, pre-stressed concrete structural members, 26" x
66‘-0" voided slab
9 Each
55401 Reinforcing steel CQ 3290 Pound
55601
A
Single-tube steel bridge railing
140 Foot
55601B Standard steel pedestrian bridge railing
66.1 Foot
56401 Elastomeric bearing device
36 Each
57195 Contractor-furnished construction bypass bridge– furnish, install, and remove
60905 Asphalt concrete curb, 5-inch depth
57 Foot
61701 Guardrail system W-beam approach railing, class A, type I
75 Foot
61702 Terminal section ET2000
Plus, NCHRP 350, Test Level 2
3 Each
61755 End piece, type C 1 Each
61756 Anchorage 1 Each
63302 Permanent Traffic Control
(Delineator Decal)
4 Each
63401
A
Pavement markings type
A, double yellow centerline
63401B Pavement markings type
A, white fog line
63501 Temporary traffic control
Solicitation: AG-0489-S-10-0453 PAGE 6 of 86
ITEM NO. DESCRIPTION M OF M QUANTITY PAY UNIT UNIT PRICE TOTAL
63502 Temporary traffic control, Sign, Type ARRA, Low
Speed Roads, A60, B36
1 Each
TOTAL – BID ITEMS
B-2 - NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed- Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under
151.01 Mobilization.
Payment will be made on actual work performed as described in FP-03 109.01 unless otherwise noted.
Vendor Name
Phone
Signature:
FAX
Address:
City, State, Zip TIN#
DUNS#
Solicitation: AG-0489-S-10-0453 PAGE 7 of 86
SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
C-1 DESCRIPTION OF WORK
Project work consists of the following major items of work: Construction of a single -lane bypass road and bridge, removal and disposal of an existing double-lane timber bridge and foundations, construction of a double-lane prestressed concrete bridge with pile foundations and cast-in-place reinforced concrete pile caps, extra width for a pedestrian path, fill removal and haul of excavated material, excavation, embankment, bridge and approach railing, and placement of aggregate surfacing and hot mix asphalt. All work within the ordinary high water mark for the North Fork John Day river shall be performed between July 15 th and August 15th.
C-2 PROJECT LOCATION
This project is located on the Whitman Ranger District, of the Wallowa-Whitman National Forest, Section 34, Township 7S, R 35.5 E. approximately 8 miles north of Granite, Oregon. It may be reached by traveling north on Forest Road 73 (Elkhorn Bypass) from Granite, Oregon for a pproximately 8 miles, or by traveling west from Baker City on the Elkhorn Drive Scenic Byway for approximately 52 miles.
Access from LaGrande is by traveling to Starkey, Oregon and heading south on Forest Road 51 to the
Junction of Forest Road 52, then continuing south approximately 2 miles to the junction of Forest Road 73 and the project site.
C-3 AGAR 452.211-73 Attachments to Statement of Work/Specifications (FEB 1988)
The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.
Solicitation: AG-0489-S-10-0453 PAGE 8 of 86
SECTION D--PACKAGING AND MARKING
For this Solicitation, there are NO Clauses in this Section
Solicitation: AG-0489-S-10-0453 PAGE 9 of 86
SECTION E--INSPECTION AND ACCEPTANCE
E-1 INSPECTION
Inspection will be conducted in accordance with the Standard Specifications for Construction of Roads and
Bridges on Federal Highway Projects, FP-03, and the attached Supplemental Project Specifications.
E-2 FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.arnet.gov/far/
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.246-12 Inspection of Construction (AUG 1996)
E-3 FINAL CLEANUP
Before final acceptance, all areas occupied by the Contractor in connection with the work shall be cleaned of all
Contractor's rubbish, excess materials, temporary structures, and equipment, and all parts of the work area shall be left in a neat and presentable condition.
http://www.arnet.gov/far/
Solicitation: AG-0489-S-10-0453 PAGE 10 of 86
SECTION F--DELIVERIES OR PERFORMANCE
F.1 FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.arnet.gov/far/
52.242-14 Suspension of Work (APR 1984)
F.2 FAR 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR
1984)
The Contractor shall be required to (a) commence work under this contract within _10_ calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than October 31, 2011. The time stated for completion shall include final cleanup of the premises. Construction work is estimated to begin on July1 st , 2011. Preliminary fabrication and material ordering may occur prior to this date with approval by the Contracting Officer.
F-3 AGAR 452.236-75 Maximum Workweek – Construction Schedule (NOV 1996)
Within five calendar days after receipt of a written request from the Contracting Officer, the Contractor must submit the following information in writing for approval:
(a) A schedule as required by FAR clause 52.236-15, Schedules for Construction Contracts, and
(b) The hours (including the daily starting and stopping times) and days of the week the Contractor proposed to carry out the work.
Forest Road 73 is also a State Scenic Byway, Elkhorn Drive. Work shall be performed in a manner as to reduce delays and impacts to public traffic on weekends, holidays, and during deer and elk seasons.
Additionally, operations shall allow travel by emergency vehicles, as necessary, throughout the construction period. The instream work period is from July 15 th through August 15
Solicitation: AG-0489-S-10-0453 PAGE 11 of 86
SECTION G--CONTRACT ADMINISTRATION DATA
G-1 POST AWARD CONFERENCE (AGAR 452.215-73) (FEB 1988)
A post award conference with the successful offeror is required. It will be scheduled and held within 15 days after the date of contract award. The conference will be held at the Headquarters of the Wallowa-
Whitman National Forest, Baker City, OR, or at an alternate location designated by the Contracting Officer.
G-2 DESIGNATION OF CONTRACTING OFFICER'S REPRESENTATIVE
The COR is responsible for administering the performance of work under this contract. In no event, however, will any understanding, agreement, modification, change order, or other matter deviating from the terms of this contract be effective or binding upon the Government unless formalized by proper contractual documents executed by the Contracting Officer prior to completion of the contract. The Contracting Officer should be informed as soon as possible or any actions or inactions by the Contractor or the Government which will change the required delivery or completion times stated in the contract, and the contract will be modified accordingly. (This does not apply to individual task assignments which were issued by the COR provided they do not affect the delivery schedule or performance period stated in the contract.)
On all matters that pertain to the contract terms the Contractor must communicate with the Contracting
Officer. Whenever, in the opinion of the Contractor, the COR requests effort outside the scope of the contract, the Contractor should so advise the COR. If the COR persists and there still exists a disagreement as to proper contractual coverage, the Contracting Officer should be notified immediately, preferably in writing if time permits. Proceeding with work without proper contractual coverage could result in nonpayment or necessitate submittal of a contract claim.
G-3 NOTIFICATION OF SUBCONTRACTING
The Contractor shall promptly notify the Contracting Officer upon entering into any subcontract arrangement. The subcontractor shall have the experience and be equipped for such work. The written notification shall include as a minimum:
a. The name, address and telephone number of the subcontractor.
b. The date upon which the subcontract was entered into and its duration.
c. A detailed description of the work being subcontracted including a listing of contract items, units, etc., as appropriate.
d. Documentation of the subcontractor's representative authority. Subcontracting any portion of the contract shall not relieve the Prime Contractor of any responsibility under this contract. Any subcontract agreement shall contain all terms and conditions of the prime contract.
G-4 CONTRACT RELEASE
When submitting final payment, Contractor shall provide a signed and dated contract release that includes the following information: "In consideration of receipt of final payment in the amount of $__________
Solicitation: AG-0489-S-10-0453 PAGE 12 of 86
Contractor hereby releases the United States of America from any and all obligations arising under this contract and any modifications thereof except as reserved herein. Reservations:______________"
G-5 GOVERNMENT-FURNISHED PROPERTY
The Government will provide the following item(s) of Government property to the Contractor for use in the performance of this contract. This property shall be used and maintained by the Contractor in accordance with the provisions of the "Government Property" FAR clause contained elsewhere in the contract.
Item No. Property Description Qty Location Date Available
Bypass 24901
Borrow Excavation for bypass fill construction.
As Needed NFSR 5190, NFSR 5190030
T 7S, R 35 ½ E, SEC. 14
With agreement by the Contracting
Officer
Bypass 24901
Crushed aggregate for cushion next to geotextile.
As Needed NFSR 5190, NFSR 5190030
T 7S, R 35 ½ E, SEC. 14
Upon notice to the Contracting Officer
Bypass
24901
Crushed aggregate for bypass road surfacing.
As needed NFSR 5190, NFSR 5190030
T 7S, R 35 ½ E, SEC. 14
Upon notice to the
Contracting Officer
20494 Pit run borrow excavation for construction of bridge approach embankment
As needed NFSR 5190, NFSR
5190030
T 7S, R 35 ½ E, SEC.
With agreement by the Contracting
Officer
20803 Structural Backfill As Needed NFSR 5190, NFSR
5190030
T 7S, R 35 ½ E, SEC.
With agreement by the Contracting
Officer
32201 Crushed Aggregate, Type Base, Grading D for base rock under paved roadway
225 CY, in place
NFSR 5190, NFSR
5190030
T 7S, R 35 ½ E, SEC.
Upon notice to the
Contracting Officer
55301 Bridge Year Date Plate 1 COR On approval of prestressed member shop drawings
Solicitation: AG-0489-S-10-0453 PAGE 13 of 86
SECTION H--SPECIAL CONTRACT REQUIREMENTS
H-1 FAR 52.236-4 PHYSICAL DATA (APR 1984)
Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.
a) Existing Conditions:
The indications of physical conditions on the drawings and in the specifications are the result of site investigations by surveys and drill core samples.
b) Weather Conditions:
Weather conditions suitable for ground excavation are normally expected in June through October.
The area is generally closed by snow in winter. Night freezing is common throughout the late spring and early fall.
c) Pre-bid Conference:
None scheduled. If a sufficient number of bidders request a conference, one may be scheduled and information posted along with the solicitation.
H-2 PRODUCT SUBSTITUTION
Any modification of other items, designs, materials, products or equipment (including Government-furnished property), made necessary because of a substitution, will be the responsibility of the Contractor without adjustment in contract price or time. The Contracting Officer's approval of any substitute will not affect the Contractor's responsibility for such modification. Any and all substitutions will be requested by the Contractor after award of the contract has been made. No approvals will be made prior to award.
H-3 PRODUCT SUBSTITUTION
A. When submitted within 30 days after contract award, the Contracting Officer will consider formal requests for substitution of products, equipment and methods, in place of those specified. Requests submitted after 30 days will be considered only in case of product unavailability or other conditions beyond the control of Contractor. Requests shall provide the information and be in the format as specified in paragraph B below.
B. Submit separate request for each substitution. Support each request with:
1. Complete data substantiating compliance of proposed substitution with requirements stated in contract documents:
a. Product identification, including manufacturer's name and address.
b. Manufacturer's literature; identify:
1) Product description
2) Reference standards
3) Performance and test data
Solicitation: AG-0489-S-10-0453 PAGE 14 of 86
c. Samples, as applicable
d. Name and address of similar projects on which product has been used, and date of each installation.
e. Comparative data of item to be deleted by proposed substitution. Include drawings to same (or larger) scale as pertinent portion of contract documents and marked to show how differences will be accommodated.
f. Show complete system/assembly as revised to accommodate proposed alternate for difference in performance, size, configuration, connections, service, accessibility, or any other significant characteristics.
g. Show complete layout of system except that which is identical to contract documents unless unchanged portion must be shown to indicate clearances, etc.
h. Include complete detail drawings of supports for all substitute equipment and complete load calculations for adequacy of support prepared and signed by a registered structural engineer.
1. Itemized comparison of the proposed substitution with product specified; list significant variations.
2. Data relating to changes in construction schedule.
3. Any effect of substitution on separate contracts.
4. List of changes required in other work or products.
5. Accurate cost data comparing proposed substitution with product specified.
6. Proposed amount of change to the contract.
7. Designation of required license fees or royalties.
8. Designation of availability of maintenance services, sources of replacement materials.
C. Substitutions will NOT be considered for acceptance when:
1. They are merely indicated or implied on shop drawings or product data submittals without a formal request from Contractor.
2. They are requested directly by a subcontractor or supplier.
3. Acceptance will require substantial revision of contract documents.
4. Substitution has not been requested in accordance with this and related clauses.
D. Substitute products shall not be ordered or installed without written acceptance of the Contracting Officer.
E. Contracting Officer will determine acceptability of proposed substitutions.
F. Number of Substitution Submittals: Only one proposed alternative will be considered for each item.
Provide specified item if substitution proposal is rejected.
H-4 CONTRACTOR'S REPRESENTATION & RESPONSIBILITY
A. In making formal request for substitution the Contractor represents he/she:
Solicitation: AG-0489-S-10-0453 PAGE 15 of 86
1. Have investigated proposed product and determined that it is equal to or superior in all respects to that originally specified.
2. Will provide same warranties and bond for substitute as for originally specified product.
3. Will coordinate installation of accepted substitution into the work, and will make such changes as may be required for the work to be complete in all respects.
4. Will waive claims for additional costs caused by substitution, which may subsequently become apparent.
5. Cost data is complete and includes relate d costs under the contract, but not:
a. Costs under separate contracts.
b. Contracting Officer costs for redesign or revision of contract documents.
B. The Contractor assumes full responsibility that the substitution and/or alternate items or procedures proposed will meet the job requirements.
C. The Contractor is solely responsible for the cost of redesign and modifications to this and other parts of the work caused by the substitutions or alternates furnished.
H-5 SUBMITTALS
(a) Shop Drawings Submittals :
Submit the following shop drawings on this project (4 sets unless noted):
Title Referenced by
Specification
No.
Time Allowed for Govt.
Review After Submittal
Bridge, Pedestrian, and Approach Railing
Shop Drawings
104.03(b)(1)(d) 14 Days
Prestressed Precast Members 104.03(b)(1)(e)
& 553
21 Days
Reinforcing Steel Shop Drawings (Bar lists and bending diagrams)
554.03 14 Days
Shop Drawings, Design calculations, and
Load rating summary for proposed bypass bridge
571.04 14 Days
As-Built Plans 104.03(c) Within 30 days of the date of
Final Inspection
Solicitation: AG-0489-S-10-0453 PAGE 16 of 86
(b) Material Certification, Testing Reports and Submittals:
Brief Title Basic Reference
Detailed Regulations
Specification
Copies
To
Submit
Time for
Government
Approval After
Total Submittal
Traffic Control Management
Plan
156 and H-16 FSSS 156.04
& MUTCD Part 6
1 7 Days
Hazardous Spill Plan FSSS 107.10 1 7 Days
Fire Plan Fire Suppression
Clause
J.4 1 7 Days
Quality Control Plan 153.02 1 7 Days
Project Work Schedule with any
Revisions
FAR 52.236-15
(a)
1 7 Days
Safety Plan H-19 1 7 Days
Notif ication for Moving
Construction Equipment onto
Project
H-12 1 14 Days
Erosion Control Plan 157.03 157.03 & Plans 3 14 Days
Dewatering and Sediment
Control Plan
157.03 Fill Removal Permit 3 14 Days
Structure Removal Plan (Timber
Bridge)
FSSS 203.04
FSSS 203.04
21 Days
Disposal certificate for removed materials
203.05
203.05(d)
N/A
Asphalt Concrete Mixing Plant
Certif ication
404.02 404.02 2 14 Days
Minor Hot Asphalt Concrete
Mix Des ign
404.02 404.02 1 7 Days
Hot Asphalt Concrete Quality
Control Certificates
404.09 & 106 404.09 2 N/A
Pile Driving Equipment 551 551.03(b)(1) 2 14 Days
Wave Equation Analysis 551 551.03(b)(2) 2 14 Days
Pile Production Certificate 551.15 715.06 1 14 Days
Manufacturer Data for Pile Shoe
Attachment
715.08
715.08
14 Days
Structural Concrete Mix Design, including admixtures
552.03 1 14 Days
Portland Cement Production
Certif ication
FP-03 552.19, FP-
03 701.01 (a)
701.01 (a) 2 N/A
Concrete Quality Control
Certif icates, including batch tickets and test results
552.09, FSSS
552.09 & 106
552.09, FSSS 552.09 1 N/A
PCI Plant Certification FSSS 553.03 FSSS 553.03 2 21 Days
PCI Plant Quality Control
Report
FSSS 553.03 FSSS 553.03 2 21 Days
Concrete Mix Design for
Prestressed Members
553 553.11, 553.03, 552.03
2 21 Days
Prestressing Strand Certification 553 553.11, 709.03& FS
Supp 553.03
2 21 Days
Prestressed Concrete Test 553 553.11, 553.03 & FS 2 N/A
Solicitation: AG-0489-S-10-0453 PAGE 17 of 86
Results Supp 5 53.03
Reinforcing Steel Production
Certif ication
554.10 709.01 & FS Supp
709.01
1 N/A
Structural Steel Certified Test
Results
a. Steel Specified by AASHTO
Designation
b. Steel Specified by ASTM
Designation
555.20
555.05 &
717.01
555.05 & Plans
AASHTO M270 &
Plans
ASTM A36 & Plans
Bridge Railing Production
Certif ication
556.10 710.06 2 21 Days
Straw (Weed-free) 625 713.05 3 7 Days
Erosion Control Materials 629.07 & 106.03 713.13, 713.14, 713.17
& Table 713-3
1 21 Days
High Strength Non-Shrink Grout
Data
725.22 (c) & FS
Supp 725.22 (c)
State Qualified Products
List
2 14 Days
( c ) General Guidelines for Submittals:
Submittals are required by their corresponding specifications (basic reference & detailed requirement). Work requiring submittals shall not begin until submittals have been approved.
Submittals shall include the following:
Date and Revision Dates.
Project Name and Contract Number.
Names of Contractor, Subcontractor, Supplier, and Manufacturers.
Field Dimensions and Relation to Adjacent Structures.
Contractor's stamp, initialed or signed, certifying review of submittal, verification of field measurement and compliance with contract documents.
Manufacturer's requirements:
Supply manufacturer's catalog sheets or brochures with diagrams, schedules, or performance charts.
Illustrations shall be clearly marked to identify pertinent materials or models, dimensions, and clearances required. Supplement standard drawings to provide information unique to this project.
Approval or Rejection Time Allowance:
Submittals will be reviewed and either approved or rejected by (SEE (b) ABOVE).
H-6 MOISTURE SENSITIVE SOILS
Contractors are cautioned that the roadway structure is designed so that the completed road will support highway legal loads during a limited use season. Construction equipment often subjects the uncompleted roadway structure to loadings it is not designed to support. This is especially critical during periods of excessive moisture. Materials on this project are sensitive to excessive moisture and will require careful selection and scheduling of equipment to permit efficient operation. Any damage resulting from operations, which renders the material unsuitable for use or results in potential siltation of streams, will be corrected by the Contractor at Contractor's expense.
Solicitation: AG-0489-S-10-0453 PAGE 18 of 86
H-7 LANDSCAPE PRESERVATION
The Contractor shall give attention to the effect of contract operation upon the landscape, shall take care to maintain natural surroundings undamaged, and shall conduct the work at all times in compliance with the following requirements.
a. Prevention of the Landscape Defacement. The Contractor shall not remove, deface, injure, or destroy trees, shrubs, lawns, or other natural features or any other improvements in the work area unless specifically authorized by the Contracting Officer. Unless otherwise provided herein, the Contractor shall confine contract operations to within the areas designated in contract documents.
b. Protection of Streams, Lakes, and Reservoirs. The Contractor shall take sufficient precautions t o prevent pollution of streams, lakes, small ponds, and reservoirs with fuels, oils, bitumens, calcium chloride, silt, or other harmful materials. Mechanical equipment shall not be operated in live streams without written approval of the Contracting Officer.
c. The Contractor shall confine operations to within the clearing limits or other areas designated in contract documents, and prevent the depositing of rocks, excavated materials, stumps, or other debris outside of these limits. Material which falls outside of these limits shall be retrieved, disposed of, or incorporated in the work as directed by the Contracting Officer, and damage to vegetation or structures outside the clearing limits shall be repaired as directed by the Contracting Officer.
H-8 EROSION CONTROL MEASURES
a. Contractor shall minimize sediment laden water from entering the stream. Install check dams and sediment fences as necessary to minimize the entry of silt-laden water into streams or other water bodies.
b. The work area on the streamside of the abutments shall be isolated from freely flowing water, as agreed to in the dewatering and sediment control plan. All erosion control measures agreed to in the erosion control plan shall be approved in place prior to commencement of construction activities.
H-9 OPERATIONS AND POLLUTION CONTROL
a. Operations shall be scheduled and conducted to minimize erosion of soils and to prevent silting and muddying of streams, rivers, irrigation systems, and impoundments (lakes, reservoirs, etc.).
b. Pollutants such as fuels, lubricants, bitumen, raw sewage, and other harmful materials shall not be discharged into or near rivers, streams, and impoundments or into natural or manmade channels leading thereto. Wash water or waste from concrete or aggregate operations shall not be allowed to enter live steams prior to treatment by filtration, settling, or other means sufficient to reduce the sediment content to not more than that of the stream into which it is discharged.
c. Mechanized equipment shall not be operated in live streams without written approval by the Contracting
Officer.
Solicitation: AG-0489-S-10-0453 PAGE 19 of 86
d. Prevention of Oil Spills – If the Contractor maintains storage facilities for oil or oil products on project Area, appropriate preventive measures shall be taken to ensure that any spill of such oil or oil products does not enter any stream or other waters of the United States or any of the individual States.
e. If the total oil or oil products storage exceeds 1320 gallons or if any single container exceeds a capacity of 660 gallons, the Contractor shall prepare a Spill Prevention Control and Countermeasures (SPCC) Plan.
Such plan shall meet applicable EPA requirements (40 CFR 112) including certification by a registered professional engineer.
f. Vehicle equipment maintenance, refue ling, and fuel storage shall be separated from the stream by a minimum of 150 feet. Vehicles/equipment operating within 150 feet of a stream shall be inspected daily for fluid leaks, and repaired if necessary. A separate staging area will be designated on the ground by the CO at a location meeting these requirements.
H-10 CLEANING OF EQUIPMENT
Cleaning of Off-Road Equipment used by the Contractor for contract work shall be conducted outside the boundary of any National Forest Service land prior to moving each piece of equipment onto the project. The
Contractor shall notify the Forest Service prior to moving each piece of equipment onto the project. Upon request from the Forest Service, arrangement will be made for Forest Service to inspect each piece of equipment prior to it being placed into service. The Contractor shall use cleaning methods necessary to ensure equipment is free of all attached mud, dirt, and plant parts. If noxious weeds are present at a project site, cleaning may also be required before moving between locations within the same project. These measures will assist to prevent the introduction/spread of the seeds of noxious weeds onto National Forest land. The Contractor shall certify in writing, compliance with the above requirements.
―Construction and Off-road Equipment‖ includes all machinery other than log truck, chip vans, pickup trucks or vehicles used to transport personnel on a daily basis.
H-11 ROAD MAINTENANCE REQUIREMENTS
In order to fulfill the obligation to protect existing facilities, material source, and disposal site access roads from seasonal weather damage, to safeguard soil and water quality, and to repair damage commensurate with his use, the
Contractor shall perform road maintenance work on these roads in accordance with the following:
1. While performing ordinary road maintenance work, the Contractor shall avoid permanent fouling of gravel or bituminous surfaces through covering them with earth or debris from side ditches, slides, or other sources. The
Contractor shall avoid blading surface material off the surface of roads.
2. While performing all phases of construction, the Contractor shall minimize damage to ditches, slopes and road surfaces. Where damage does occur, the Contractor shall restore the road to its prior condition within a reasonable period of time.
3. The Contractor shall remove all excess materials and debris from asphalt roadways and trails immediately after backfilling has been completed. This may require brooming and hosing down with water.
Solicitation: AG-0489-S-10-0453 PAGE 20 of 86
4. On completion and acceptance of work requirements, including acceptance of road maintenance by the Forest
Service, Contractor road maintenance responsibility shall terminate.
H-12 ROAD USE AND MAINTENANCE
Use of Roads
(a) The Contractor is authorized to use roads that are a part of the construction project and those Forest
Service roads designated below for performance of work under this contract.
Road No.
Termini
Authorizations, Restrictions &
Requirements
Maintenance Required
(Yes or No)
51 Jct. NFSR 52 to Jct.
NFSR 5190
Reference H-14 Yes, as needed
52 Jct. NFSR 73 to Jct.
NFSR 51
Reference H-14 Yes, as needed
5190 * Jct. NFSR 51 to Jct.
NFSR 5190030
811 and 891 Yes
5190030 Jct. NFSR 5190 to
Material Source
811 and 891 Yes
73 Within the project area and between project area and staging area
Reference H-14 Yes, as needed
*Road 5190 is gated closed with a gate and locked. Contractor shall keep gate closed and locked, except for vehicular passage. Coordinate with the contracting officer for placement of a second lock by contractor for construction use. With agreement by the contracting officer, earthen barricades may be erected on Roads 5190020 and 5190 (just past the junction of 5190030) during construction operations in lieu of gate -locking activities taking place.
(b) If the Contractor requests use of a National Forest road or segment not designated for his use, the Forest
Service may authorize such use if not in conflict with the current Road Rules document. Authorization to use such additional roads may include maintenance requirements and use limitations.
(c) The roads authorized for use will be subject to the following provisions.
1. The Road Rules in the current Wallowa-Whitman National Forest Road Rules Document are applicable to all commercial road users. This document is available for inspection at the office of the Forest Supervisor and shall be applicable except when modified by provisions of the contract.
2. State laws governing traffic rules and equipment requirements on State and County highways.
3. Federal regulations contained in 36 CFR 261.12. These regulations prohibit use of vehicles or equipment in excess of State legal highway loads or posted limits without valid State and Forest
Service overload permits, damaging a road while using it, and blocking a road open to use by others, except as may be otherwise provided in the contract.
Load Limits - All vehicles and equipment shall not exceed State legal highway loads and widths or posted limits without valid State and Forest Service overload, overwidth permits. Forest Service overload permits for this project may be obtained from the District Ranger.
Solicitation: AG-0489-S-10-0453 PAGE 21 of 86
4. Federal Regulations contained in 36 CFR 261.54 as applied to the area by an order issued under 36 CFR 261.50. These regulations authorized the Forest Service, as a sovereign act, to issue additional restrictions and closures any time conditions warrant. Such closures will be in addition to those shown in the current Road Rules Document and will be posted on the road.
H-13 Use of Premises
Forest Service Regulations for Use of Campground prohibits occupancy of developed recreation sites for other than primarily recreation purposes. One camp unit will be allowed at the project site for use by a watchman. Other campsites may be allowed with written authorization (camp permit) by the Ranger
District.
A storage site will be permitted at a designated site within the project area. The Forest Service assumes no liability for materials stored within the storage site. The Contractor will be allowed to erect a temporary fence to secure materials and equipment, however, the fence shall be removed and the site restored prior to final acceptance of the contract.
H-14 AGAR 452.237-74 KEY PERSONNEL (FEB 1988)
(a) The Contractor shall assign to this contract the following key personnel:
Project Superintendent .
(b) During the first ninety (90) days of performance, the Contractor shall make no substitutions of key personnel unless the substitution is necessitated by illness, death, or termination of employment. The Contractor shall notify the Contracting Officer within 15 calendar days after the occurrence of any of these events and provide the information required by paragraph (c) below. After the initial 90-day period, the
Contractor shall submit the information required by paragraph (c) to the Contracting Off icer at least 15 days prior to making any permanent substitutions.
(c) The Contractor shall provide a detailed explanation of the circumstances necessitating the proposed substitutions, complete resumes for the proposed substitutions, and any additional information requested by the Contracting Officer. Proposed substitutes should have comparable qualififcations to those of the persons being replaced. The Contracting Officer will notify the Contractor within 15 calendar days after receipt of all required information of the decision on substitutions. The contract will be modified to reflect any approved changes of key personnel.
H-15 SAFETY
The following are some safety hazards that have been identified while performing road and bridge construction/reconstruction activities on the National Forest. The contractor shall provide a written, job specific safety plan addressing these hazards at the pre-work meeting. The safety plan will also address the safety of the public using the temporary bridge and bypass while the new bridge is being constructed.
1. Traffic Hazards
A. Narrow, gravel- or native-surfaced forest roads
1. Construction traffic
2 Recreational traffic (including ATVs)
Solicitation: AG-0489-S-10-0453 PAGE 22 of 86
3. Dusty conditions when following or meeting other vehicles
4. Rough running surface
B. Paved double-lane forest roads
1. Construction traffic
2 Recreational traffic (including large RVs pulling trailers)
3. Out of state and unfamiliar tourist traffic
4. Potholes
C. Obstructions In Road
1. Wildlife
2. Rolling rocks
3. Downed timber
4. Potholes
2. Work Environment A. Weather / Heat / Cold
B. Bees nests
C. Ticks D. Uneven ground
E. Snags/hazard trees
F. Personal safety equipment G. Flowing water at ford crossings of streams
3. Truck Driving & Trailer Towing A. Stopping distance
B. Loads securely lashed C. Clearances (powerlines, etc.)
D. Steep grades
4. Clearing
A. Falling trees/limbs
B. Chainsaw operations C. Mechanical clearing operations
1. Skidding/decking logs
2. Slash treatment
D. Noise
5. Excavation
A. Slope stability
B. Trench stability (CMPs etc.)
C. Loose material/rolling rock
D. Blasting
E. Noise F. Water
6. Heavy Equipment Operation
While operating or working adjacent to or near heavy equipment, strict attention should be given to safety procedures. Injury, disabity, or death may occur during any of the following:
A. Backing
Solicitation: AG-0489-S-10-0453 PAGE 23 of 86
B. Clearance around backhoes/excavators/cranes C. Steep side slopes or soft ground / rollover
D. Refueling E. Equipment limitations
F. Unsafe equipment / lack of safety equipment (hard hats, chaps, and other job-specific safety equipment) G. Operator fatigue
H. Overhead hazards when cranes or excavators are operating during heavy lifting operations (i.e., concrete and girder placement) I. Trailer, bucket, and other connections or retrofitting.
J. Loud noise
K. Transport failures and accidents
1. Unstableness
2. Tie-downs
3. Loading/unloading hazards
L. Restricted sight distance
M. Reduced hearing capability of operator due to equipment noise N. Overhead hazards when working near equipment
O. Heavy loads, including dead and live weight
7. Communications
A. Operators shall have communication via cell phone or FM radio.
B. For emergencies, use of the Forest Service radio system may be employed.
H-16 RECOVERY ACT REQUIREMENTS
American Recovery and Reinvestment Act (ARRA) Sign. Ensure that ARRA signing meets the requirements of the MUTCD and the ―Project Funding Source Sign Assembly‖ details that are attached in Section J, including sign layout and color. Comply with the requirements of the ―FOR USE ON LOW SPEED ROADS OR NON-ROAD
PROJECTS‖ sign. With respect to placement of signs, regulatory, warning, and guide signs have a higher priority than economic recovery signs. Economic recovery signs shall not be placed where they can obscure road users‘ view of other traffic control devices. Economic recovery signs should be placed where they can be easily identif ied with the corresponding project(s). If the placement of an economic recovery sign conflicts with newly installed higher priority signs, traffic signals, temporary traffic control devices, or other priority devices, the economic recovery sign should be relocated. Due to public safety concerns, economic recovery signs should not be allowed at the following locations :
On the front, back, adjacent to, or around any traffic control device, including traffic signs, signals, changeable message signs, traffic control device posts or structures, or bridge piers
At key decision points where a driver‘s attention is more appropriately focused on traffic control devices, roadway geometry, or traffic conditions. These locations include, but are not limited to, exit and entrance ramps, intersections controlled by traffic signals or by stop or yield signs, highway-rail grade crossings, and areas of limited sight distance.
Solicitation: AG-0489-S-10-0453 PAGE 24 of 86
H-17 ADDITIONAL REQUIREMENTS OR RESTRICTIONS
The wilderness boundary is near the project on the downstream side, west of the project.
Project has an instream work period, July 15 through August 15 th
. Traffic delays should be minimized.
Road closure during girder placement will be allowed with the written authorization of the contracting officer. No instream crossings of the creek by equipment will be allowed. Access across the stream shall be via bypass structure.
Advance warning of road construction work and delays will be required outside of the project area at portals to the Scenic Byway (ie., near Granite, Anthony Lakes, etc.).
Contractor may use water from the North Fork John Day River, at the project location. Contractor will be required to obtain a Limited Water Use License for the water source located at this site prior to the time that the source is to be used. The license must be obtained though the local Watermaster‘s office and t he State of Oregon Water Resources Department in accordance with the current Oregon Administrative Rules. The Contractor will be responsible for payment of all fees involved in obtaining the license and for full compliance with all the terms and conditions of the license. This includes any requirement to install, maintain, and operate fish screening and bypass devices as required by the Oregon Department of Fish and Wildlife. The Contractor must provide a copy of the approved license to the Engineer before any water is actually removed from the source.
Solicitation: AG-0489-S-10-0453 PAGE 25 of 86
PART II--CONTRACT CLAUSES
SECTION I--CONTRACT CLAUSES
I-1 FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
www.arnet.gov/far/ www.usda.gov/procurement/policy/agar.html
52.202-1 Definitions (JUL 2004)
52.203-3 Gratuities (APR 1984) 52.203-5 Covenant Against Contingent Fees (APR 1984)
52.203-6 Restrictions on Subcontractor Sales to the Government (SEP 2006)
52.203-7 Anti-Kickback Procedures (JUL 1995) 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity (JAN 1997)
52.203-10 Price or Fee Adjustment for Illegal or Improper Activity (JAN 1997) 52.203-12 Limitation on Payments to Influence Certain Fe deral Transactions (SEP 2007)
52.204-4 Printed or Copied Double-Sided on Recycled Paper (AUG 2000) 52.209-6 Protecting the Government's Interest when Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (MAY 2008)
52.211-18 Variation in Estimated Quantity (APR 1984) 52.215-2 Audit and Records -- Negotiation (JUN 1999)
52.219-3 Notice of Total HUBZone Set-Aside (JAN 1999)
52.219-8 Utilization of Small Business Concerns (MAY 2004) 52.222-3 Convict Labor (JUN 2003)
52.222-4 Contract Work Hours and Safety Standards Act -- Overtime Compensation (JUL 2005) 52.222-6 Davis-Bacon Act (JUL 2005)
52.222-7 Withholding of Funds (FEB 1988)
52.222-8 Payrolls and Basic Records (JAN 2010) 52.222-9 Apprentices and Trainees (JUL 2005)
52.222-10 Compliance with Copeland Act Requirements (FEB 1988)
52.222-11 Subcontracts (Labor Standards) (JUL 2005) 52.222-12 Contract Termination - Debarment (FEB 1988)
52.222-13 Compliance with Davis-Bacon and Related Act Regulations (FEB 1988)
52.222-14 Disputes Concerning Labor Standards (FEB 1988) 52.222-15 Certification of Eligibility (FEB 1988)
52.222-21 Prohibition of Segregated Facilities (FEB 1999) 52.222-26 Equal Opportunity (MAR 2007)
52.222-27 Affirmative Action Compliance Requirements for Construction (FEB 1999)
52.222-35 Equal Opportunity for Special Disabled Veterans, Veterans of the Vietnam Era, and other Eligible Veterans (SEP 2006)
52.222-36 Affirmative Action for Workers with Disabilities (JUN 1998) http://www.usda.gov/procurement/policy/agar.html
Solicitation: AG-0489-S-10-0453 PAGE 26 of 86
52.222-37 Employment Reports on Special Disabled Veterans, Veterans of the Vietnam Era, and other Eligible Veterans (SEP 2006)
52.222-50 Combating Trafficking in Persons (SEP 2007) 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts
(DEC 2007)
52.223-5 Pollution Prevention and Right-to-Know Information (AUG 2003) 52.223-6 Drug-Free Workplace (MAY 2001)
52.223-14 Toxic Chemical Release Reporting (AUG 2003)
52.223-15 Energy Efficiency in Energy-Consuming Products (DEC 2007) 52.225-13 Restrictions on Certain Foreign Purchases (JUN 2008)
52.227-1 Authorization and Consent (DEC 2007)
52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement (DEC 2007) 52.227-4 Patent Indemnity -- Construction Contracts (DEC 2007)
52.228-2 Additional Bond Security (OCT 1997) 52.228-11 Pledges of Assets (FEB 1992)
52.228-12 Prospective Subcontractor Requests for Bonds (OCT 1995)
52.228-14 Irrevocable Letter of Credit (DEC 1999) 52.228-15 Performance and Payment Bonds – Construction (NOV 2006)
52.229-3 Federal, State, and Local Taxes (APR 2003)
52.232-5 Payments Under Fixed-Price Construction Contracts (SEP 2002) 52.232-17 Interest (OCT 2008)
52.232-23 Assignment of Claims (JAN 1986)
52.232-27 Prompt Payment for Construction Contracts (OCT 2008) 52.232-33 Payment by Electronic Funds Transfer – Central Contractor Registration (OCT 2003)
52.233-1 Disputes (JULY 2002) 52.233-3 Protest After Award (AUG 1996)
52.233-4 Applicable Law for Breach of Contract Claim (OCT 2004)
52.236-2 Differing Site Conditions (APR 1984) 52.236-3 Site Investigation and Conditions Affecting the Work (APR 1984)
52.236-5 Material and Workmanship (APR 1984)
52.236-6 Superintendence by The Contractor (APR 1984) 52.236-7 Permits and Responsibilities (NOV 1991)
52.236-8 Other Contracts (APR 1984) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (APR
1984)
52.236-10…
This is the start of the file's text. The full file is on GovTribe.