SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
CALL:
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
376687
US FOREST SERVICE
EROC NORTHWEST
16400 CHAMPION WAY
SANDY OR 97055
USDA FOREST SERVICE
EROC NORTHWEST
16400 CHAMPION WAY
SANDY, OR 97055
TONYA RYMER 503-668-1703
1x 03/31/2010
AG-0489-S-10-0360
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
TAS::12 1102::TAS RECOVERY UMA Forest-Wide Toilet Site Development #2
This solicitation is issued under the provisions of the American Recovery and
Reinvestment Act of 2009.
NOTE:
(1) Bid bonds must be original and received by time of solicitation close.
(2) This solicitation is advertised under the provisions of the Small Business
Competitiveness Demonstration Program per FAR 19.10.
11. The Contractor shall begin performance
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
10 488 calendar days and complete it within ________________ ________________ calendar days after receiving
Section F.2
04/29/2010
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected. _________________
STANDARD FORM 1442 (Rev. 4-85)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document and return (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.
No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
US FOREST SERVICE
EROC NORTHWEST
16400 CHAMPION WAY
SANDY OR 97055
TONYA R. RYMER
28. NEGOTIATED AGREEMENT 29. AWARD
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
STANDARD FORM 1442 (REV. 4-85) BACK
Continued...
TABLE OF CONTENTS
UMA FOREST-WIDE TOILET SITE DEVELOPMENT #2 RECOVERY PROJECT
PART I – CONTRACT SPECIFICATIONS
• SECTION A -SF-1442
• SECTION B – Supplies or Services and Prices/Costs (Schedule of Items)
• SECTION C - Descriptions/Specifications/Statement of Work
• SECTION D- Packaging, Marking and Layout
• SECTION E - Inspection and Acceptance
• SECTION F - Deliveries and Performance
• SECTION G - Contract Administrative Data
• SECTION H - Special Contract Requirements
PART II – CONTRACT CLAUSES
• SECTION I - Clauses incorporated by reference
• AGAR/FSAR and SPECIAL CONTRACT CLAUSES
• ARRA Required Clauses (full text)
PART III – LIST OF DOCUMENTS,EXIBITS AND OTHER ATTACHMENTS
• SECTION J – Exhibits, Attachments, and Appendices
PART IV – REPRESENTATIONS AND INSTRUCTIONS
• SECTION K – Representations, Certifications and Other Statements of Offerors or Respondents
• SECTION L – Instructions to Offeror / Notices
• SECTION M – Evaluation Factors for Award
RECOVERY UMA Forest-Wide Toilet Site Development #2
PART I—THE SCHEDULE
SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS
SCHEDULE OF ITEMS
BASE ITEMS:
Item
Number Description
Unit
Estimated Quantity
Unit Price
Total
1.1
FAIRVIEW CAMPGROUND Site includes installation of sidewalks, ramps, pads, etc to meet ADA standards (See Note #3)
SF
2.1
DRIFTWOOD CAMPGROUND includes Removal & Disposal of Structures & Obstructions
EA
2.2
Decommissioning & full removal of Septic Tanks.
2.3 installation of sidewalks, ramps, pads, etc.
3.1
GOLD DREDGE CAMPGROUND
includes Removal & Disposal of Structures & Obstructions
3.2 includes Decommissioning & full removal of Septic Tanks
3.3 includes installation of sidewalks, ramps, pads, etc. to meet ADA standards (See Note #3)
4.1
TIMOTHY SPRING CAMPGROUND
4.2
4.3 includes installation of sidewalks, ramps, 5.1
ANDIES PRAIRIE SNO-PARK includes
Tanks.
Unit Price
Total
5.2 ANDIES PRAIRIE SNO-PARK includes Site Preparation for Toilet Installation
EA 2 $_______ $__________
5.3 installation of sidewalks, ramps, pads, etc
5.4
Re-locate toilet building to new location within project site (place on new vault)
5.5 prep and repaint interior of existing toilet building
6.1
UMATILLA FORKS CAMPGROUND
6.2
6.3 includes installation of sidewalks, ramps, 7.1
BEAR WALLOW CAMPGROUND
7.2
7.3 includes Site Preparation for Toilet Installation
7.4 includes installation of sidewalks, ramps, pads, etc. to meet ADA Standards (See Note #3)
7.5 includes Re-locate toilet building from another site and place on new vault.
7.6 includes Replace windows, door, repair chips to concrete and re-paint/re-stain inside and out.
LS
Unit Price
Total
8.1
GODMAN CAMPGROUND includes
Tanks
8.2 GODMAN CAMPGROUND includes Site Preparation for Toilet Installation
EA 1 $_______ $__________
8.3
GODMAN CAMPGROUND includes
9.1 GODMAN RENTAL CABIN includes Site
9.2
GODMAN RENTAL CABIN includes Installation of sidewalks, ramps, pads, etc.
10.1 PANJAB OVERFLOW includes Removal & Disposal of Structures & Obstructions
10.2
PANJAB OVERFLOW includes
10.3 PANJAB OVERFLOW includes Site
10.4
PANJAB OVERFLOW includes
10.5
PANJAB OVERFLOW includes Re-locate toilet building from another site and place on new vault (See Site Plan)
11.1 PANJAB TRAILHEAD includes Removal
11.2
PANJAB TRAILHEAD includes
11.3 PANJAB TRAILHEAD includes Site
LS 1 $_______ $__________
11.4
PANJAB TRAILHEAD includes
Unit Price
Total
12.1
WENATCHEE RENTAL CABIN includes
12.2
WENATCHEE RENTAL CABIN includes
12.3
12.4
13.1
SUMMIT RENTAL CABIN includes
13.2
13.3 SUMMIT RENTAL CABIN includes Site
13.4
14.1
TARGET MEADOWS CAMPGROUND
14.2
14.3 includes Installation of sidewalks, ramps,
15.1 PENLAND LAKE includes Removal & Disposal of Structures & Obstructions
15.2
PENLAND LAKE includes
15.3 PENLAND LAKE includes Site
Unit Price
Total
15.4
PENLAND LAKE includes Installation of sidewalks, ramps, pads, etc. to meet ADA standards (See Note #3)
15.5
PENLAND LAKE includes New Toilet Building Access Improvements (See attached plans)
LS
16.1
TAMARACK RENTAL CABIN includes
16.2
Decommissioning & full removal of Toilet and associated PIT.
16.3
16.4
17.1
DIVIDE WELL CAMPGROUND includes
17.2
17.3
18.1
FOUR CORNERS SNO-PARK includes
18.2
FOUR CORNERS SNO-PARK includes
19.1
LANE CREEK CAMPGROUND includes
19.2
19.3
Unit Price
Total
20.1
GODMAN CAMPGROUND
FIREPLACE/COOKSTOVE includes Reconstruction of historic warming-cooking units (See notes at bottom)
TOTAL BASE BID ITEMS
OPTIONAL ITEMS
Unit Price
Total
21.1
DRIFT FENCE CAMPGROUND includes
21.2
DRIFT FENCE CAMPGROUND includes
21.3
DRIFT FENCE CAMPGROUND includes
TOTAL OPTION 21 ITEMS
(21.1 +21.2+21.3)
22.1 FREMONT COMPLEX includes Removal
22.2
FREMONT COMPLEX includes
22.3
FREMONT COMPLEX includes
TOTAL OPTION 22 ITEMS
(22.1 +22.2+22.3)
Vendor Name: Phone
Signature: Fax Address: Email City, State, Zip: TIN# Duns#
SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
C.1 DESCRIPTION OF WORK
Work shall include, but is not limited to, site clearing, grubbing, excavation, fill, toilet installation, access improvements, ADA walkways, and historic rock fireplace reconstruction. This work will occor across the entire Umatilla National Forest. Project sites are located in both Oregon and Washington.
Note: “Contractor” refers to successful bidder(s) of this contract. “Manufacturer” refers to the provider of the pre-fabricated toilet buildings.
Work under this contract includes, but is not limited to, removal and disposal of existing buildings and other structures; pumping, removal and disposal of septic tank vaults according to State regulations (OAR chapter 340, divisions 071 and 073); excavation and site development for installation of prefabricated toilet buildings; load, haul and place aggregate for bedding and/or backfill, and installation of Americans with Disabilities Act (ADA) - standard sidewalks, pads and parking areas. Sidewalk installation will be done after installation of the new toilet building(s). Access improvement and historic rock fireplace reconstruction within these recreation sites will be performed under this contract as well.
Government will identify a suitable Material Source, where noted in the drawings, for Contractor use in obtaining bedding and backfill aggregate at those sites noted on the drawings. Government will identify water source(s) available for contractor use for dust abatement. Site preparation and installation not specified may be specified at the time of issuance of the Notice To Proceed.
The prefabricated toilet buildings are Government-furnished material (GFM): The Government will purchase the individual toilet buildings. Contractor shall be responsible for coordinating with building manufacturer to set up a delivery schedule. Manufacturer is responsible for delivering building and vault and off-loading it into the prepared excavation. Manufacturer is also responsible for assembling building components such as mastic seal between the two major components and the vent pipe.
Contractor is responsible for individual site preparation according to Manufacturer specifications for installation of the prefabricated toilet building(s) and shall meet delivery schedule agreed to by Government and Manufacturer. Manufacturer groups delivery of building orders based on geographic proximity. Delivery date(s) shall be scheduled a minimum of two weeks prior to building and vault delivery. Final site preparation shall be completed no earlier than 48 hours of scheduled vault toilet delivery.
Contractor is responsible for providing MUTCD-standard work zone signage and safety fencing at each work site and for meeting applicable worker safety regulations. Contractor shall meet all applicable state regulations for decommissioning (pumping, removal and disposal) of septic tank vaults. All buildings and vaults, including all sub-surface materials, shall be completely removed. All buildings and vaults scheduled for decommissioning shall become Contractor property and be removed from Government land.
No electricity is available at these sites; Contractor may use the existing Forest Service restroom facilities. Work hours shall be between the hours of 7:00 a.m and 6:00 p.m. unless otherwise approved by the C.O. No work shall be performed at any site on major holiday weekends.
C.2 PROJECT LOCATION
See attached location descriptions. These project sites are located on the Umatilla National Forest in Northeast Oregon and Southeast Washington.
C.3 AGAR 452.211-73 Attachments to Statement of Work/Specifications (FEB 1988)
The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.
SECTION D--PACKAGING AND MARKING
D.1 PROJECT LABELING FOR OFFICIAL CORRESPONDENCE
The Government singularly identifies each project with a contract number at time of Award. The contract number is a unique identifier to purposely and permanently represent an awarded project. The Government issued contract number is to be referenced on all official communication starting upon notice of award.
SECTION E--INSPECTION AND ACCEPTANCE
E.1 FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.arnet.gov/far/
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.246-12 Inspection of Construction (AUG 1996)
E.2 Inspection and Acceptance
A. Definition. “Work” includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.
B. Unless working tolerances are specified, all work performed and materials furnished shall be in reasonable close conformity with lines, grades, cross sections, dimensions, and material requirements shown on the drawings, indicated in the specifications, or designated on the ground. “Reasonable close conformity” is in compliance with reasonable and customary manufacturing and construction tolerances.
C. The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction on the Contracting officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.
D. Government inspections and tests are for the sole benefit of the Government and do none of the following:
a. Relieve the Contractor of responsibility for providing adequate quality control measures;
b. Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;
c. Constitute or imply acceptance; or
d. Affect the continuing rights of the Government after acceptance of the completed work under paragraph (I) below.
E. The presences or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the Specifications without the Contracting Officer’s written authorization.
F. The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.
http://www.arnet.gov/far/�
G. If the Contractor does not promptly replace or correct rejected work, the Government may (1) by contract or otherwise, replace the work and charge the cost to the Contractor or (2) terminate for default the Contractor’s right to proceed.
H. If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.
I. Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government’s rights under any warranty or guarantee.
E.3 FINAL CLEANUP
Before final acceptance, all areas occupied by the Contractor in connection with the work shall be cleaned of all Contractor's rubbish, excess materials, temporary structures, and equipment, and all parts of the work area shall be left in a neat and presentable condition.
SECTION F--DELIVERIES OR PERFORMANCE
F.1 FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.arnet.gov/far/
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.242-14 Suspension of Work (APR 1984)
F.2 FAR 52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 488 calendar days the contractor receives the notice to proceed. The time stated for completion shall include final cleanup of the premises.
Work is estimated to begin on 07/01/2010. See attached start dates and contract calendar days in Section J.
F.3 AGAR 452.236-75 Maximum Workweek – Construction Schedule (NOV 1996)
Within five calendar days after receipt of a written request from the Contracting Officer, the Contractor must submit the following information in writing for approval:
(a) A schedule as required by FAR clause 52.236-15, Schedules for Construction Contracts, and
(b) The hours (including the daily starting and stopping times) and days of the week the Contractor proposed to carry out the work.
The maximum workweek that will be approved is between the hours of 7:00 a.m and 6:00 p.m. unless otherwise approved by the C.O.
SECTION G--CONTRACT ADMINISTRATION DATA
G.1 CONTRACT RELEASE
When submitting final payment, Contractor shall provide a signed and dated contract release that includes the following information: "In consideration of receipt of final payment in the amount of $__________ Contractor hereby releases the United States of America from any and all obligations arising under this contract and any modifications thereof except as reserved herein.
Reservations:______________"
G.2 GOVERNMENT-FURNISHED PROPERTY
The Government will provide the following item(s) of Government property to the Contractor for use in the performance of this contract. This property shall be used and maintained by the Contractor in accordance with the provisions of the "Government Property" FAR clause contained elsewhere in the contract.
Item No. Property
Property Value Qty Location Date Available
3.1 Prefabricated toilet
building and vault Varies Per task order Varies per task order
On Site Delivery to be coordinated between Contractor and bldg manufacturer
ALL Aggregate needed for backfill of vaults and buildings and tank removals, site preparation & concrete base.
Est. 20 CY per installation;
additional for backfill at decommissioned vault sites.
Available at Government identified material source.
Unless delivered to site by others;
see drawings.
Start of work
20.1 Stone suitable for
reconstruction of
Historic Rock Fireplaces
N/A Near project site; within 5 mile radius
Start of work
SECTION H--SPECIAL CONTRACT REQUIREMENTS
H.1 FAR 52.236-14 AVAILABILITY AND USE OF UTILITY SERVICES (APR 1984)
When available:
(a) The Government shall make all reasonably required amounts of utilities available to the Contractor from existing outlets and supplies, as specified in the contract. Unless otherwise provided in the contract, the amount of each utility service consumed shall be charged to or paid for by the Contractor at prevailing rates charged to the Government or, where the utility is produced by the Government, at reasonable rates determined by the Contracting Officer. The Contractor shall carefully conserve any utilities furnished without charge.
(b) The Contractor, at its expense and in a workmanlike manner satisfactory to the Contracting Officer, shall install and maintain all necessary temporary connections and distribution lines, and all meters required to measure the amount of each utility used for the purpose of determining charges. Before final acceptance of the work by the Government, the Contractor shall remove all the temporary connections, distribution lines, meters, and associated paraphernalia.
H.2 PRODUCT SUBSTITUTION
Any modification of other items, designs, materials, products or equipment (including Government-furnished property), made necessary because of a substitution, will be the responsibility of the Contractor without adjustment in contract price or time. The Contracting Officer's approval of any substitute will not affect the Contractor's responsibility for such modification. Any and all substitutions will be requested by the Contractor after award of the contract has been made. No approvals will be made prior to award.
H.3 SUBSTITUTIONS
A. When submitted within 30 days after contract award, the Contracting Officer will consider formal requests for substitution of products, equipment and methods, in place of those specified. Requests submitted after 30 days will be considered only in case of product unavailability or other conditions beyond the control of Contractor. Requests shall provide the information and be in the format as specified in paragraph B below.
B. Submit separate request for each substitution. Support each request with:
1. Complete data substantiating compliance of proposed substitution with requirements stated in contract documents:
a. Product identification, including manufacturer's name and address.
b. Manufacturer's literature; identify:
1) Product description
2) Reference standards
3) Performance and test data
c. Samples, as applicable
d. Name and address of similar projects on which product has been used, and date of each installation.
e. Comparative data of item to be deleted by proposed substitution. Include drawings to same (or larger) scale as pertinent portion of contract documents and marked to show how differences will be accommodated.
f. Show complete system/assembly as revised to accommodate proposed alternate for difference in performance, size, configuration, connections, service, accessibility, or any other significant characteristics.
g. Show complete layout of system except that which is identical to contract documents unless unchanged portion must be shown to indicate clearances, etc.
h. Include complete detail drawings of supports for all substitute equipment and complete load calculations for adequacy of support prepared and signed by a registered structural engineer.
1. Itemized comparison of the proposed substitution with product specified; list significant variations.
2. Data relating to changes in construction schedule.
3. Any effect of substitution on separate contracts.
4. List of changes required in other work or products.
5. Accurate cost data comparing proposed substitution with product specified.
6. Proposed amount of change to the contract.
7. Designation of required license fees or royalties.
8. Designation of availability of maintenance services, sources of replacement materials.
C. Substitutions will NOT be considered for acceptance when:
1. They are merely indicated or implied on shop drawings or product data submittals without a formal request from Contractor.
2. They are requested directly by a subcontractor or supplier.
3. Acceptance will require substantial revision of contract documents.
4. Substitution has not been requested in accordance with this and related clauses.
D. Substitute products shall not be ordered or installed without written acceptance of the Contracting Officer.
E. Contracting Officer will determine acceptability of proposed substitutions.
F. Number of Substitution Submittals: Only one proposed alternative will be considered for each item. Provide specified item if substitution proposal is rejected.
H.4 CONTRACTOR'S REPRESENTATION & RESPONSIBILITY
A. In making formal request for substitution the Contractor represents he/she:
1. Have investigated proposed product and determined that it is equal to or superior in all respects to that originally specified.
2. Will provide same warranties and bond for substitute as for originally specified product.
3. Will coordinate installation of accepted substitution into the work, and will make such changes as may be required for the work to be complete in all respects.
4. Will waive claims for additional costs caused by substitution, which may subsequently become apparent.
5. Cost data is complete and includes related costs under the contract, but not:
a. Costs under separate contracts.
b. Contracting Officer costs for redesign or revision of contract documents.
B. The Contractor assumes full responsibility that the substitution and/or alternate items or procedures proposed will meet the job requirements.
C. The Contractor is solely responsible for the cost of redesign and modifications to this and other parts of the work caused by the substitutions or alternates furnished.
H.5 SUBMITTALS
The following shall be submitted on this project:
Title Referenced by Specification No.
Time of Government Approval After Submittal
Concrete Mix design for cast in place sidewalks
Section 02754 Cement Concrete Paving Part 1.2A
5 days
Product Data (polymer fibers) Section 02754 Cement Concrete Paving Part 1.2A
5 days
Design mix (concrete) Section 02754 Cement Concrete Paving Part 1.2A
5 days
H.6 MATERIAL CERTIFICATIONS AND TESTING REPORTS
The following material certifications and/or testing reports shall be submitted on this project:
Title Referenced by Specification No.
Concrete mix design 02457 Mortar mix 04900
H.7 MOISTURE SENSITIVE SOILS
Contractors are cautioned that the roadway structure is designed so that the completed road will support highway legal loads during a limited use season. Construction equipment often subjects the uncompleted roadway structure to loadings it is not designed to support. This is especially critical during periods of excessive moisture.
Materials on this project are sensitive to excessive moisture and will require careful selection and scheduling of equipment to permit efficient operation. Any damage resulting from operations, which renders the material unsuitable for use or results in potential siltation of streams, will be corrected by the Contractor at Contractor's expense.
H.8 LANDSCAPE PRESERVATION
The Contractor shall give attention to the effect of contract operation upon the landscape, shall take care to maintain natural surroundings undamaged, and shall conduct the work at all times in compliance with the following requirements.
a. Prevention of the Landscape Defacement. The Contractor shall not remove, deface, injure, or destroy trees, shrubs, lawns, or other natural features or any other improvements in the work area unless specifically authorized by the Contracting Officer. Unless otherwise provided herein, the Contractor shall confine contract operations to within the areas designated in contract documents.
b. Protection of Streams, Lakes, and Reservoirs. The Contractor shall take sufficient precautions to prevent pollution of streams, lakes, small ponds, and reservoirs with fuels, oils, bitumens, calcium chloride, silt, or other harmful materials. Mechanical equipment shall not be operated in live streams without written approval of the Contracting Officer.
H.9 CONTRACTOR'S USE OF EXISTING ROADS
The Contractor is authorized to use roads in the immediate construction project area for performance of work under this contract. The authorization is limited to roads necessary for direct access between the construction area and storage sites, disposal areas, and other work areas designated in the contract.
The roads authorized for use will be subject to the following general conditions:
(1) State laws governing traffic rules and equipment requirements on State and County Highways.
(2) Federal Regulations contained in 36 CFR 261.12. These regulations prohibit use in excess of State Codes for weight and size, damaging a road while using it, and blocking a road open to use by others.
The Contractor shall be responsible for and perform road maintenance commensurate with his use of Forest Service roads in the construction area.
H.10 ROAD MAINTENANCE REQUIREMENTS
In order to fulfill the obligation to protect existing facilities, material source, and disposal site access roads from seasonal weather damage, to safeguard soil and water quality, and to repair damage commensurate with his use, the Contractor shall perform road maintenance work on these roads in accordance with the following:
1. While performing ordinary road maintenance work, the Contractor shall avoid permanent fouling of gravel or bituminous surfaces through covering them with earth or debris from side ditches, slides, or other sources.
The Contractor shall avoid blading surface material off the surface of roads.
2. While performing all phases of construction, the Contractor shall minimize damage to ditches, slopes and road surfaces. Where damage does occur, the Contractor shall restore the road to its prior condition within a reasonable period of time.
3. The Contractor shall remove all excess materials and debris from asphalt roadways and trails immediately after backfilling has been completed. This may require brooming and hosing down with water.
4. On completion and acceptance of work requirements, including acceptance of road maintenance by the
Forest Service, Contractor road maintenance responsibility shall terminate.
H.11 TRAFFIC CONTROL
The Contractor shall provide, erect and maintain all necessary barricades, suitable and sufficient lights, danger signals, signs, and other traffic control devices, and shall take all necessary precautions for the protection of the work and safety of the public. Roads closed to traffic shall be protected by effective barricades, and obstructions shall be illuminated during the hours of darkness. Suitable warning signs shall be provided to properly control and direct traffic.
The Contractor shall erect warning signs in advance to any place on the project where operations may interfere with the use of the road or trail by traffic and at all intermediate points where the new work crosses or coincides with an existing road or trail. All road barricades, warning signs, lights, temporary signals, flagman and pilot car operators and equipment, and other protective devices, except for special devices, shall conform with Part VI of the Manual on Uniform Traffic Control Devices for Streets and Highways, published by the Federal Highway Administration and applicable safety codes.
The Contractor shall furnish, erect, maintain, and remove when notified any project identification signs shown on the drawings
Necessary warning signs and guards shall be posted during blasting operations to safeguard the public.
H.12 SAFETY
The work identified as inherently hazardous in this project is the presence of contractor personnel working in areas where construction machinery including but not limited to lifts, pneumatic tools, backhoes, tractors, excavators, or dump trucks, is operating.
Public use within the campground may present hazards to contractor and employees due to recreation vehicles, cars and trucks on campground roads. Equipment operation within the campground and contractor traffic is a potentially hazardous condition for public traveling through or adjacent to the construction sites.
Decommissioning of septic tank vaults presents the risk of various contaminates and diseases such as Hepatitis, coliform contaminates and tetanus.
The contractor shall bring a written, job-specific safety plan identifying hazards to the public as well as to the contractor and employees for review and discussion at the prework meeting. Appropriate safety signing, barricades and fencing meeting MUTCD signing and traffic control standards will be required
Identify inherently hazardous conditions that could lead to serious injury or loss of life.
Identify and describe inherently hazardous conditions.
Recognize hazards when contracting for inherently hazardous working conditions.
When inherently hazardous conditions exist, the contract should require a written, job-specific safety plan for information and discussion at the prework meeting.
Plan to reduce safety hazards and the costs of litigation.
Make sure that inherently hazardous conditions are documented and are written up in a job-specific Job Hazard
Analysis (JHA) for Forest Service employees involved. This will help identify hazards involved in the job.
For each contract evaluate working conditions to determine if specific inherently hazardous conditions will be encountered as part of the needed construction work. If these conditions do exist, they need to be listed in the contract.
H.13 OPTIONAL ITEMS
Except when it is determined in accordance with FAR 17.206(b) not to be in the Governments best interests, the Government will evaluate offers for award by adding the total price for all options to the total price for basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).
The contractor is to provide all information required in Section B of the solicitation (Supplies or Services Prices/Costs) for all items listed in the base contract and all items listed in the optional work.
The government will provide the contractor with a thirty day written notice of intent to execute the optional item(s). The Government may elect to exercise any or all of the options at the discretion of the Contracting Officer. Any option that the Government elects to exercise will include all the work listed under that option.
When the Government exercises optional work, the price provided by the contractor at time of solicitation is the contract price for that work. The Contracting Officer will not need to modify the Contract Completion Date as the contract completion date includes enough time for base plus optional items.
PART II--CONTRACT CLAUSES
SECTION I--CONTRACT CLAUSES
I.1 FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
www.arnet.gov/far/ www.usda.gov/procurement/policy/agar.html
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.202-1 Definitions (JUL 2004) 52.203-3 Gratuities (APR 1984) 52.203-5 Covenant Against Contingent Fees (APR 1984) 52.203-6 Restrictions on Subcontractor Sales to the Government (SEP 2006) 52.203-7 Anti-Kickback Procedures (JUL 1995) 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity (JAN 1997) 52.203-10 Price or Fee Adjustment for Illegal or Improper Activity (JAN 1997) 52.203-12 Limitation on Payments to Influence Certain Federal Transactions (SEP 2007) 52.204-4 Printed or Copied Double-Sided on Recycled Paper (AUG 2000) 52.209-6 Protecting the Government's Interest when Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (SEP 2006) 52.211-18 Variation in Estimated Quantity (APR 1984) 52.219-4 Notice of Price Evaluation Preference for HUBZone Small Business Concerns (JUL
2005) 52.219-8 Utilization of Small Business Concerns (MAY 2004) 52.222-3 Convict Labor (JUN 2003) 52.222-4 Contract Work Hours and Safety Standards Act -- Overtime Compensation (JUL 2005) 52.222-6 Davis-Bacon Act (JUL 2005) 52.222-7 Withholding of Funds (FEB 1988) 52.222-8 Payrolls and Basic Records (DEVIATION, JAN 2010) 52.222-9 Apprentices and Trainees (JUL 2005) 52.222-10 Compliance with Copeland Act Requirements (FEB 1988) 52.222-11 Subcontracts (Labor Standards) (JUL 2005) 52.222-12 Contract Termination - Debarment (FEB 1988) 52.222-13 Compliance with Davis-Bacon and Related Act Regulations (FEB 1988) 52.222-14 Disputes Concerning Labor Standards (FEB 1988) 52.222-15 Certification of Eligibility (FEB 1988) 52.222-21 Prohibition of Segregated Facilities (FEB 1999) 52.222-26 Equal Opportunity (MAR 2007) 52.222-27 Affirmative Action Compliance Requirements for Construction (FEB 1999) 52.222-35 Equal Opportunity for Special Disabled Veterans, Veterans of the Vietnam Era, and other
Eligible Veterans (SEP 2006) 52.222-36 Affirmative Action for Workers with Disabilities (JUN 1998) http://www.usda.gov/procurement/policy/agar.html�
52.222-37 Employment Reports on Special Disabled Veterans, Veterans of the Vietnam Era, and other Eligible Veterans (SEP 2006)
52.222-50 Combating Trafficking in Persons (FEB 2009) 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction
Contracts (DEC 2007) 52.223-5 Pollution Prevention and Right-to-Know Information (AUG 2003) 52.223-6 Drug-Free Workplace (MAY 2001) 52.223-14 Toxic Chemical Release Reporting (AUG 2003) 52.223-15 Energy Efficiency in Energy-Consuming Products (DEC 2007) 52.225-13 Restrictions on Certain Foreign Purchases (JUN 2008) 52.227-1 Authorization and Consent (DEC 2007) 52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement (DEC 2007) 52.227-4 Patent Indemnity -- Construction Contracts (DEC 2007) 52.228-2 Additional Bond Security (OCT 1997) 52.228-11 Pledges of Assets (SEP 2009) 52.228-12 Prospective Subcontractor Requests for Bonds (OCT 1995) 52.228-14 Irrevocable Letter of Credit (DEC 1999) 52.228-15 Performance and Payment Bonds – Construction (NOV 2006) 52.229-3 Federal, State, and Local Taxes (APR 2003) 52.232-5 Payments Under Fixed-Price Construction Contracts (SEP 2002) 52.232-17 Interest (OCT 2008) 52.232-23 Assignment of Claims (JAN 1986) 52.232-27 Prompt Payment for Construction Contracts (OCT 2008) 52.232-33 Payment by Electronic Funds Transfer – Central Contractor Registration (OCT 2003) 52.233-1 Disputes (JULY 2002) 52.233-3 Protest After Award (AUG 1996) 52.233-4 Applicable Law for Breach of Contract Claim (OCT 2004) 52.236-2 Differing Site Conditions (APR 1984) 52.236-3 Site Investigation and Conditions Affecting the Work (APR 1984) 52.236-5 Material and Workmanship (APR 1984) 52.236-6 Superintendence by The Contractor (APR 1984) 52.236-7 Permits and Responsibilities (NOV 1991) 52.236-8 Other Contracts (APR 1984) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements
(APR 1984)
52.236-10 Operations and Storage Areas (APR 1984) 52.236-11 Use and Possession Prior to Completion (APR 1984) 52.236-12 Cleaning Up (APR 1984) 52.236-13 Accident Prevention (NOV 1991) 52.236-14 Availability and Use of Utility Services (APR 1984) 52.236-15 Schedules for Construction Contracts (APR 1984) 52.236-16 Quantity Surveys (APR 1984) 52.236-17 Layout of Work (APR 1984) 52.236-21 Specifications and Drawings for Construction (FEB 1997) 52.236-26 Preconstruction Conference (FEB 1995) 52.242-13 Bankruptcy (JUL 1995) 52.243-4 Changes (JUNE 2007) 52.244-6 Subcontracts for Commercial Items (DEC 2009)
52.245-1 Property Records (JUN 2007) 52.245-2 Government Property (Fixed-Price Contracts) (JUN 2007) 52.246-21 Warranty of Construction (MAR 1994) 52.248-3 Value Engineering – Construction (SEP 2006) 52.249-2 Termination for Convenience of the Government (Fixed-Price) (MAY 2004)--Alternate I
(SEP 1996)
52.249-10 Default (Fixed-Price Construction) (APR 1984) 52.253-1 Computer Generated Forms (JAN 1991)
AGRICULTURE ACQUISITION REGULATION (48 CFR CHAPTER 4) CLAUSES
452.232-70 Reimbursement for Bond Premiums – Fixed-Price Construction Contracts (NOV 1996) 452.236-71 Prohibition Against the Use of Lead-Paint (NOV 1996) 452.236-72 Use of Premises (NOV 1996) 452.236-73 Archeological or Historic Sites (FEB 1988) 452.236-74 Control of Erosion, Sedimentation and Pollution (NOV 1996) 452.236-76 Samples and Certificates (FEB 1988) 452.236-77 Emergency Response (NOV 1996)
I.2 52.204-7 Central Contractor Registration (APR 2008)
(a) Definitions. As used in this clause—
“Central Contractor Registration (CCR) database” means the primary Government repository for Contractor information required for the conduct of business with the Government.
“Data Universal Numbering System (DUNS) number” means the 9-digit number assigned by Dun and Bradstreet, Inc. (D&B) to identify unique business entities.
“Data Universal Numbering System+4 (DUNS+4) number” means the DUNS number means the number assigned by D&B plus a 4-character suffix that may be assigned by a business concern. (D&B has no affiliation with this 4-character suffix.) This 4-character suffix may be assigned at the discretion of the business concern to establish additional CCR records for identifying alternative Electronic Funds Transfer (EFT) accounts (see the FAR at Subpart 32.11) for the same concern.
“Registered in the CCR database” means that—
(1) The Contractor has entered all mandatory information, including the DUNS number or the DUNS+4 number, into the CCR database; and
(2) The Government has validated all mandatory data fields, to include validation of the Taxpayer Identification Number (TIN) with the Internal Revenue Service (IRS), and has marked the record “Active”. The Contractor will be required to provide consent for TIN validation to the Government as a part of the CCR registration process.
(b)
(1) By submission of an offer, the offeror acknowledges the requirement that a prospective awardee shall be registered in the CCR database prior to award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation.
(2) The offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation “DUNS” or “DUNS+4” followed by the DUNS or DUNS+4 number that identifies the offeror’s name and address exactly as stated in the offer. The DUNS number will be used by the Contracting Officer to verify that the offeror is registered in the CCR database.
(c) If the offeror does not have a DUNS number, it should contact Dun and Bradstreet directly to obtain one.
(1) An offeror may obtain a DUNS number—
(i) Via the internet at http://fedgov.dnb.com/webform or if the offeror does not have internet access, it may call Dun and Bradstreet at 1-866-705-5711 if located within the United States; or
(ii) If located outside the United States, by contacting the local Dun and Bradstreet office. The offeror should indicate that it is an offeror for a U.S.
Government contract when contacting the local Dun and Bradstreet office.
(2) The offeror should be prepared to provide the following information:
(i) Company legal business name.
(ii) Tradestyle, doing business, or other name by which your entity is commonly recognized.
(iii) Company physical street address, city, state and Zip Code.
(iv) Company mailing address, city, state and Zip Code (if separate from physical).
(v) Company telephone number.
(vi) Date the company was started.
(vii) Number of employees at your location.
(viii) Chief executive officer/key manager.
(ix) Line of business (industry).
(x) Company Headquarters name and address (reporting relationship within your entity).
http://fedgov.dnb.com/webform�
(d) If the Offeror does not become registered in the CCR database in the time prescribed by the Contracting Officer, the Contracting Officer will proceed to award to the next otherwise successful registered Offeror.
(e) Processing time, which normally takes 48 hours, should be taken into consideration when registering.
Offerors who are not registered should consider applying for registration immediately upon receipt of this solicitation.
(f) The Contractor is responsible for the accuracy and completeness of the data within the CCR database, and for any liability resulting from the Government’s reliance on inaccurate or incomplete data. To remain registered in the CCR database after the initial registration, the Contractor is required to review and update on an annual basis from the date of initial registration or subsequent updates its information in the CCR database to ensure it is current, accurate and complete. Updating information in the CCR does not alter the terms and conditions of this contract and is not a substitute for a properly executed contractual document.
(g)
(1)
(i) If a Contractor has legally changed its business name, “doing business as” name, or division name (whichever is shown on the contract), or has transferred the assets used in performing the contract, but has not completed the necessary requirements regarding novation and change-of-name agreements in Subpart 42.12, the Contractor shall provide the responsible Contracting Officer a minimum of one business day’s written notification of its intention to:
(A) Change the name in the CCR database;
(B) Comply with the requirements of Subpart 42.12 of the FAR;
(C) Agree in writing to the timeline and procedures specified by the responsible Contracting Officer. The Contractor must provide with the notification sufficient documentation to support the legally changed name.
(ii) If the Contractor fails to comply with the requirements of paragraph (g)(1)(i) of this clause, or fails to perform the agreement at paragraph (g)(1)(i)(C) of this clause, and, in the absence of a properly executed novation or change-of-name agreement, the CCR information that shows the Contractor to be other than the Contractor indicated in the contract will be considered to be incorrect information within the meaning of the “Suspension of Payment” paragraph of the electronic funds transfer (EFT) clause of this contract.
(2) The Contractor shall not change the name or address for EFT payments or manual payments, as appropriate, in the CCR record to reflect an assignee for the purpose of assignment of claims (see FAR Subpart 32.8, Assignment of Claims). Assignees shall be separately registered in the CCR database. Information provided to the Contractor’s CCR record that indicates payments, including those made by EFT, to an ultimate recipient other than that Contractor will be considered to be incorrect information within the meaning of the “Suspension of payment” paragraph of the EFT clause of this contract.
(h) Offerors and Contractors may obtain information on registration and annual confirmation requirements via the Internet at http://www.ccr.gov or by calling 1-888-227-2423, or 269-961-5757.
I.3 FAR 52.228-1 Bid Guarantee (SEP 1996) (Applicable over $100,000)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds –
(1) To unsuccessful bidders as soon as practicable after the opening of bids, and (2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.
(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000, whichever is less.
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid…