- RECOVERY UMA Forest-Wide Toilet Site Development #2 Federal contract opportunity
- Solicitation number
- AG-0489-S-10-0360
About this file
Amendment One - Allows for multiple contractor awards per bid item adds FAR.228-13 and revises contract time to account for performance time per site. The solicitation close has not been extended and remains April 29 2010 at 2 00 pm PT)
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AG-0489-S-10-0360_uma-toilet.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE PAGE OF PAGES
1 3
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
One (1) April 21, 2010
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
US Forest Service EROC Northwest 16400 Champion Way Sandy, OR 97055
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.
AG-0489-S-10-0360 RECOVERY
USA Forest-Wide Toilet Site Development #2
9B. DATED (SEE ITEM 11)
03/31/2010
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
(X) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN
THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.
Amendment One makes the following changes to the Solicitation:
• Allows Multiple Awards per Item and its associated subitems.
• Adds FAR 52.228-13 Alternative Payment Protections (JUL 2000)
• Revises contract time to account for contract performance time needed per site.
The solicitation close has not been extended and remains at April 29, 2010 at 2:00 pm
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
PT.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
TONYA RYMER
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
4/21/2010 (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
SECTION B
NOTES: Award will be made by Bid Item and its associated subitems. (Fairview Campground, Driftwood Campground, Gold Dredge Campground, Timothy Spring Campground, Andies Prairie Sno-Park, Umatilla Forks Campground, Bear Wallow Campground, Godman Campground, Panjab Overflow, Panjab Trailhead, Wenatchee Rental Cabin, Summit Rental Cabin, Target Meadows Campground, Penland Lake, Tamarack Rental Cabin, Divide Well Campground, Four Corners Sno-Park, Lane Creek Campground, Godman Campground, Drift Fence Campground, and Fremont Complex are each considered a bid item.) Multiple Contractors may be awarded a contract, however, only one CONTRACTOR award per Bid Item (For example:
Driftwood Campground Item 2.1, 2.2, and 2.3 are considered a single Bid Item). If a contractor is awarded more than 1 Bid Item, the contract value for awarded Bid Items will be added together so that a single contract may be formed. In addition, Performance Time for those items will be consecutive based upon the chart provided on page three of this amendment.
SECTION I
FAR 52.228-13 Alternative Payment Protections (JUL 2000) (Applicable to Contracts>$25,000 but < $100,000)
(a) The Contractor shall submit one of the following payment protections
Payment Bond Irrevocable Letter of Credit
(b) The amount of the payment protection shall be 100 percent of the contract price.
(c) The submission of the payment protection is required within 15 days of contract award.
(d) The payment protection shall provide protection for the full contract performance period plus a one-year period.
(e) Except for escrow agreements and payment bonds, which provide their own protection procedures, the Contracting Officer is authorized to access funds under the payment protection when it has been alleged in writing by a supplier of labor or material that a nonpayment has occurred, and to withhold such funds pending resolution by administrative or judicial proceedings or mutual agreement of the parties.
(f) When a tripartite escrow agreement is used, the Contractor shall utilize only suppliers of labor and material that signed the escrow agreement.
Site Item # Estimated
Manufacturer Delivery Date
Estimated Contractor Start Date
Contract Time (Days)
Fairview Campground 1 7/1/2010 7/5/2010 30
Driftwood Campground 2 8/15/2010 8/23/2010 30
Gold Dredge Campground
8/15/2010 8/23/2010
Timothy Springs Campground
8/15/2010 8/23/2010
Andies Prarie Sno-Park 5 8/15/2010 8/9/2010 30
Umatilla Forks Campground
7/1/2010 7/5/2010
Bear Wallow Campground
7/15/2011 7/11/2011
Godman Campground 8 8/1/2011 7/25/2011 60
Godman Rental Cabin 9 8/1/2011 7/25/2011 60
Panjab Overflow 10 8/1/2011 7/25/2011 60 Panjab Trailhead 11 8/1/2011 7/25/2011 60
Wenatchee Rental Cabin
8/1/2011 7/25/2011
Summit Rental Cabin 13 9/30/2011 9/26/2011 30 Target Meadows Campground
9/30/2011 10/4/2011
Penland Lake Campground
9/1/2011 8/8/2011
Tamarack Rental Cabin 16 9/1/2011 8/22/2011 30
Divide Wells Campground
8/15/2011 8/22/2011
Four Corners Sno-Park 18 N/A 7/1/2011 30
Lane Creek Campground
7/15/2011 7/11/2011
Godman Campground Stoves
N/A 7/15/2010
Drift Fence Campground (Option Item #21)
7/15/2011 7/11/2011
Fremont Compound (Option Item #22)
7/15/2011 7/11/2011
UMA FORESTWIDE TOILET SITE DEVELOPMENT #2
START WORK & DELIVERY SCHEDULE
NOTES: Award will be made by Bid Item and its associated subitems. (Fairview Campground, Driftwood Campground, Gold Dredge Campground, Timothy Spring Campground, Andies Prairie Sno-Park, Umatilla Forks Campground, Bear Wallow Campground, Godman Campground, Panjab Overflow, Panjab Trailhead, Wenatchee Rental Cabin, Summit Rental Cabin, Target Meadows Campground, Penland Lake, Tamarack Rental Cabin, Divide Well Campground, Four Corners Sno-Park, Lane Creek Campground, Godman Campground, Drift Fence Campground, and Fremont Complex are each considered a bid item.) Multiple Contractors may be awarded a contract, however, only one CONTRACTOR award per Bid Item (For example: Driftwood Campground Item 2.1, 2.2, and 2.3 are considered a single Bid Item). If a contractor is awarded more than 1 Bid Item, the contract value for awarded Bid Items will be added together so that a single contract may be formed. In addition, Performance Time for those items will be consecutive based upon the chart provided on page three of this amendment.