Rd6222_photos.pdf

PDF 822 KB Posted

Attached to
RECOVERY Umatilla Deferred Road Maintenance Federal contract opportunity
Solicitation number
AG-0489-S-10-0340
Issued by
Department of Agriculture Forest Service Washington Office Economic Recovery Operations Center Northwest

About this file

Photo Road 6222

View the file

Other files for this federal contract opportunity

Other files attached to RECOVERY Umatilla Deferred Road Maintenance, newest first.
File Type Posted
AG-0489-S-10-0340 Amendment 2.pdf PDF
Rd6214_photos.pdf PDF
Amendment 1.docx DOCX document
Bear Flat Material Source.pdf PDF
Rd62_photos.pdf PDF
Exhibit 3 Project Drawings.pdf PDF
Exhibit 2 Supplemental Specifications.pdf PDF
AG-0489-S-10-0340 sol package.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

marilynjohnson Text Box Rd 6222 MP 0.03 Cattleguard to be reconditioned marilynjohnson

Rd 6222 @MP 0.5 example of existing road and clearing

Rd 6222 From MP 6 looking back at the wet area required work done within the instream work window.

marilynjohnson Callout culvert to be removed under this bush marilynjohnson Text Box Rd 6222 From MP 5.75 looking ahead at the wet area: Required work to be done within the instream work window.

marilynjohnson Polygonal Line marilynjohnson Callout Excess material to be removed to re-establish road template.

marilynjohnson Callout Ditch armoring required: protect toe of fill; haul of unsuitable material required.

Rd 6222 MP 6.01 Culvert to be removed. Small spring comes out of rock face @10 feet from this location. Required work to be done within the instream work window.