Amendment 1.docx
DOCX document 23 KB Posted
- Attached to
- RECOVERY Umatilla Deferred Road Maintenance Federal contract opportunity
- Solicitation number
- AG-0489-S-10-0340
About this file
SF-30 Amendment No. 1
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AG-0489-S-10-0340 Amendment 2.pdf | ||
| Rd6214_photos.pdf | ||
| Rd6222_photos.pdf | ||
| Bear Flat Material Source.pdf | ||
| Rd62_photos.pdf | ||
| Exhibit 3 Project Drawings.pdf | ||
| AG-0489-S-10-0340 sol package.pdf | ||
| Exhibit 2 Supplemental Specifications.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OMB Approval 2700-0042
| 1. CONTRACT ID CODE | ||
| PAGE | OF | PAGES |
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
| 1 |
| 1 |
| 2. AMENDMENT/MODIFICATION NO. |
| 3. EFFECTIVE DATE |
| 4. REQUISITION/PURCHASE REQ. NO. |
| 5. PROJECT NO. (If applicable) |
| One (1) |
| 08 APR 2010 |
| 6. ISSUED BY |
| CODE |
7. ADMINISTERED BY (If other than Item 6)
CODE
US Forest Service EROC Northwest 16400 Champion Way Sandy, OR 97055
| 8. NAME AND ADDRESS OF CONTRACTOR (No. Street, county, State and ZIP: Code) |
| () |
| 9A. AMENDMENT OF SOLICITATION NO. |
AG-0489-S-10-0340
9B. DATED (SEE ITEM 11)
April 8, 2010
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
| CODE |
| FACILITY CODE |
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
|X| The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers |_| is extended, |X| is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning one (1) copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATA SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and data specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
| () | |
| A. | THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A. |
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER Specify type of modification and authority)
E. IMPORTANT: Contractor |_| is not, |X| is required to sign this document and return __1__ copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this Amendment is to add project area pictures and additional details as follows:
1. Bear flat Material Source
2. Rd 6222 Photos
3. Rd 62 Photos
4. Rd 6214 Photos
5. Information Pertinent to Preparing Offers attached to this document.
Except at provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
| 15A. NAME AND TITLE OF SIGNER (Type or print) |
| 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print) |
ROBERT WILLIAMS
| 15B. CONTRACTOR/OFFEROR |
| 15C. DATE SIGNED |
| 16B. UNITED STATES OF AMERICA |
| 16C. DATE SIGNED |
(Signature of person authorized to sign)
BY _____________________________________________
(Signature of Contracting Officer) 4/8/2010
| NSN 7540-01-152-8070 | 30-105 | STANDARD FORM 30 (REV. 10-83) |
| PREVIOUS EDITION UNUSABLE | Computer Generated | Prescribed by GSA |
| FAR (48 CFR) 53.243 |
Information Pertinent to Preparing Offers AG-0489-S-10-0340 – RECOVERY – Umatilla Deferred Road Maintenance.
Prepared April 8, 2010
General information:
· Estimated snow depth in project area as of this date is approximately 7 feet on the main access roads, Road 63 & Road 62.
· Road 62: FS performs annual maintenance (blading, drainage, logout); commercial users also annually perform maintenance commensurate with their use. Subgrade width averages 18 feet.
· Roads 6214 and 6217 are designated high clearance access and due to trailheads attract a measure of public use. FS performs maintenance focusing on Safety and not necessarily annually. Subgrade widths average 16 – 18 ft.
· Road 6219, 6200270 and 6200271 also are designated high clearance access but are closed to public use by gates. FS performs maintenance focusing on Safety and not necessarily annually. FS administrative use has occurred over the past few years with limited log out for this access. Subgrade widths average 16 – 18 ft.
Pay Item 20420 – Drainage excavation, type – Drain Dip
Work under this pay item includes excavating, shaping, and preparing drain dips for the subsequent placement of aggregate, and disposing of unsuitable materials. Excavated materials that are unsuitable for incorporation with aggregate shall be spread on adjacent fill slopes away from drainages, or otherwise disposed of in locations designated by the CO.
Note: on most roads COR anticipates close to 100% haul of excavated material.
Note differences (see drawings) between drain dips installed on grades steeper than, or flatter than 5%. Dips on steeper grades require more excavation and length to provide a smoother transition through the dip. Each dip is unique, due to variations in topography.
Pay Item 25104 – Keyed riprap, class – 3
Riprap for each drain dip’s spill apron shall be keyed into the slope below the outlet of the drain dip. The intent is to establish a firm foundation for the riprap to be placed upon, so it will remain stable as water flows from the drain dip. No dimensions are shown, as the outflow areas and slopes for each drain dip are unique. Dimensions of aprons on small fill slopes shall generally be greater in the horizontal dimension than the vertical dimension, while aprons on more substantial fill slopes will likely take advantage of the maximum reach of the excavator, resulting in a narrower apron that extends further down the slope.