AG-0489-S-10-0340 Amendment 2.pdf

PDF 431 KB Posted

Attached to
RECOVERY Umatilla Deferred Road Maintenance Federal contract opportunity
Solicitation number
AG-0489-S-10-0340
Issued by
Department of Agriculture Forest Service Washington Office Economic Recovery Operations Center Northwest

About this file

Amendment No. 2

View the file

Other files for this federal contract opportunity

Other files attached to RECOVERY Umatilla Deferred Road Maintenance, newest first.
File Type Posted
Rd6214_photos.pdf PDF
Amendment 1.docx DOCX document
Rd6222_photos.pdf PDF
Bear Flat Material Source.pdf PDF
Rd62_photos.pdf PDF
Exhibit 3 Project Drawings.pdf PDF
Exhibit 2 Supplemental Specifications.pdf PDF
AG-0489-S-10-0340 sol package.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AG-0489-S-10-0340 Amendment No. 2 Page 1 of 4

OMB Approval 2700-0042

1. CONTRACT ID CODE PAGE OF PAGES

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 4

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

Two (2) 4/20/2010

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6)

CODE

US Forest Serv ice

EROC Northwest 16400 Champion Way

Sandy, OR 97055

8. NAME AND ADDRESS OF CONTRACTOR (No. Street, county, State and ZIP: Code) () 9A. AMENDMENT OF SOLICITATION NO.

AG-0489-S-10-0340

9B. DATED (SEE ITEM 11)

March 19, 2010

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The abov e numbered solicitation is amended as set forth in Item 14. The hour and date specif ied f or receipt of Offers is extended, is not extended.

Off ers must acknowledge receipt of this amendment prior to the hour and date specif ied in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning one (1) copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATA SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and data specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

() A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET

FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to correct the following:

1. Replace the schedule of items with the attached schedule of items. Item 20452 and 32001A were inadvertently left off the schedule. There are also corrections to the two option items.

2. The time date specified for receipt of offers is extended to 4:00 PM Pacific Daylight Time, May 3, 2010.

Except at provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAM E AND TITLE OF SIGNER (Type or print) 16A. NAM E AND TITLE OF CONTR ACTING OFF ICER (Type or print)

ROBERT WILLIAMS

15B. CONTR ACTOR /OFFEROR 15C . D ATE SIGNED 16B. UNITED STATES OF AMER ICA 16C . D ATE SIGNED

(Signature of person authorized to sign)

BY _____________________________________________

(Signature of Contr acti ng Officer)

4/20/2010

NSN 7540-01-152-8070 30-105 STANDARD FORM 30

(REV. 10-83)

PREVIOUS EDITION UNUSABLE Computer Generated Prescribed by GSA

FAR (48 CFR) 53.243

AG-0489-S-10-0340 Amendment No. 2 Page 2 of 4

PART I - SCHEDULE OF ITEMS (Revised Amendment No. 2)

(Changed Items are in Bold Italics)

SECTION B – SERVICES AND PRICES

Umatilla National Forest Deferred Road Maintenance Umatilla National Forest

Wallowa County

B-1 SCHEDULE OF ITEMS

Umatilla National Forest Deferred Road Maintenance Project Walla Walla Ranger District

Umatilla National Forest Wallowa County, Oregon

(American Recovery & Reinvestment Act Project)

SCHEDULE OF ITEMS

ITEM

NO.

DESCRIPTION

PAY

UNIT

EST.

QTY.

PRICE

TOTAL

15101

Mobilization

Lump Sum

ALL

15707

Bales Weed Free Straw (GFM)

Each

20102

Clearing and grubbing, disposal method J

20204

Special clearing and grubbing, ROADSIDE BRUSHING

Mile

23.7

20207

Removal of individual trees, disposal of tops and limbs F, logs F, stumps N/A

20301A

Removal METAL CULVERTS

20301B

Removal CATTLEGUARD

20420

Drainage excavation, type DRAIN

DIP

AG-0489-S-10-0340 Amendment No. 2 Page 3 of 4

20452

Roadway excavation, compaction method N/A, finishing method B, tolerance class F (See Drawing Sheet 4 of 19 Item Comment)

25104

Keyed riprap, class 3

Cubic Yard

30322

Road reconditioning, compaction method B

Mile

34.4

30358

Recondition, CATTLEGUARD

32001A

Crush & stockpile, Grading S (See Drawing Sheet 4 of 19 Item

Ton

13,000

32209-A

Aggregate surface course, grading S, compaction method H (Placement on Rd 62 at 4” compacted depth)

23,000

32226

Grid-roll maximum size 8”, compaction method I

Cubic Yard

61910

Replace CATTLEGUARD

65101

Pit and Quarry Development

TOTAL ALL ITEMS

* - Cubic Yards for Item 32226 Grid Rolled Aggregate shall be measured in the hauling vehicle.

** - Item 32209 Crushed Aggregate shall be weighed.

AG-0489-S-10-0340 Amendment No. 2 Page 4 of 4

OPTION ITEMS:

Award based on availability of funding

Option1 32233

Haul & Place Stockpiled Aggregate, Compaction H.

(See Drawing Sheet 4 of 19 Option 1

13,000

Option 2 32001B

Crush & stockpile, grading S

(See Drawing Sheet 4 of 19 Option 2

15,000

B-2 - NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under 151.01 Mobilization.

Payment will be made on actual work performed as described in FP-03 109.01 unless otherwise noted.

Vendor Name

Phone

Signature:

FAX

Address:

Email

City, State, Zip TIN#

DUNS#