WenahaRiver SF-1442.pdf

PDF 96 KB Posted

Attached to
Recovery-Wenaha River Trail Restoration
Solicitation number
AG-0489-S-10-0251
Issued by

About this file

SF-1442 Solicitation Offer and Award

View the file

Other files

File Type Posted
WenahaRiver Dwg4of10.pdf PDF
WenahaRiver MapProject.pdf PDF
WenahaRiver Kr PerformData Sheet.doc DOC document
WenahaRiver DOL Wage Rates.doc DOC document
WenahaRiver Dwg3of10.pdf PDF
WenahaRiverARRA Signs.pdf PDF
WenahaRiver Dwg1of10.pdf PDF
WenahaRiver Dwg7of10.pdf PDF
WenahaRiver Dwg9of10.pdf PDF
WenahaRiver Dwg6of10.pdf PDF
WenahaRiver Dwg 5of10.pdf PDF
WenahaRiver Dwg10of10.pdf PDF
WehahaRiver Fire SptRqts.doc DOC document
WenahaRiver Map Vacinity.pdf PDF
WenahaRiver GenSpecs.pdf PDF
WenahaRiver Dwg8of10.pdf PDF
WenahaRiver Dwg2of10.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

352921

US FOREST SERVICE

EROC NORTHWEST

16400 CHAMPION WAY

SANDY OR 97055

FRANK MOORE 503-668-1612

1x 03/02/2010

AG-0489-S-10-0251

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

TAS::12 1102::TAS Recovery-Wenaha River Trail Restoration.

This solicitation is issued under the provisions of the American Recovery and

Reinvestmanet Act of 2009 (ARRA).

This procurement is unrestricted (open to all offerors) under FAR Subpart 19.10 -

The Small Business Competitiveness Demonstration Program Act of 1988. Contractors are required to be registered with the Central Contractor Registration (CCR) and the

On-line Representations and Certifications Application (ORCA).

Bid Bond in original form (no copies) at 20% of offer must accompany your proposal.

The magnitude of construction for this project is between $250,000.00 and

$500,000.00.

Technical questions may be directed to the Contracting Officer's Representative, Paul Freidel at (509) 522-6271 or e-mail at pfreidel@fs.fed.us.

See Section L for detailed instructions on how to submit your proposal.

Continued ...

11. The Contractor shall begin performance

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

10 calendar days and complete it within ________________ ________________ calendar days after receiving

Sec F.2; complete by 9/30/2011

04/02/2010

NSN 7540-01-155-3212

x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected. _________________

STANDARD FORM 1442 (Rev. 4-85)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

2PAGE OF

US FOREST SERVICE

EROC NORTHWEST

16400 CHAMPION WAY

SANDY OR 97055

MONTY BELL

28. NEGOTIATED AGREEMENT 29. AWARD

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

STANDARD FORM 1442 (REV. 4-85) BACK

Continued...

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

3 69

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

AG-0489-S-10-0251

TAS::12 1102::TAS Recovery-Wenaha River Trail

Restoration, Umatilla National Forest

Delivery: 09/30/2011

Delivery Location Code: 05K4

USDA FOREST SERVICE

UMATILLA NATL FOREST RANGER DIST

ROUTE 1 BOX 54A

POMEROY WA 99347 US

FOB: Destination

001 Recovery-Wenaha River Trail Restoration

Product/Service Code: AD61

Product/Service Description: CONSTRUCTION (BASIC)

Provide all labor, materials, supplies and equipment required to perform the Statement of

Work as specified in the Schedule.

Notice to Proceed with work is estimated to begin on or about July 1, 2010 or earlier if determined by the Contracting Officer. Blasting is only permitted during the period July 15th through Aug

15.

Note: Reference is made to the FAR Clauses provided in full text as required by ARRA. See

FAR 52.204-11 for Contractor Reporting

Requirements.

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

File details come from the government source that posted it. Updated .