AG-0489-S-10-0026_north-thorne-fish-imp_amend2.pdf
PDF 60 KB Posted
- Attached to
- RECOVERY North Thorne Fish Passage Improvements
- Solicitation number
- AG-0489-S-10-0026
About this file
Amendment Two (Revises the Schedule of Items and Section C)
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE PAGE OF PAGES
1 7
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
Two (2) December 21, 2009
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
USDA Forest Service EROC - Northwest 16400 Champion Way Sandy, OR 97055
USDA Forest Service EROC - Northwest 16400 Champion Way Sandy, OR 97055
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.
AG-0489-S-10-0026
Recovery North Thorne Fish Passage Improvements
9B. DATED (SEE ITEM 11)
11/27/2009
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
(X) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN
THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.
copies to the issuing office.
Amendment Two revises the Schedule of Items and Section C. (see attached pages)
The solicitation closing date has not
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
been extended. The closing date / time remains December 28, 2009 at 10:00 am (Pacific Standard Time)
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
Tonya Rymer, Contracting Officer
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
PART I—THE SCHEDULE
SECTION B--SUPPLIES OR SERVICES AND PRICES
SCHEDULE OF ITEMS
North Thorne Fish Passage Improvements (Revised 12/21/09)
BASE BID ITEMS
Pay Item Description Meth. of
Meas. Est. Qty Unit Unit Price Total Price
171(03) STAKING STRUCTURES,
PRECISION D, METHOD I LSQ 3 EA $________ $________
202(02) REMOVAL OF CULVERTS LSQ 3 EA $________ $________
203(08) BORROW EXCAVATION,
PLACEMENT METHOD 3 D.Q. 1223 CY $________ $________
203(21) HAUL D.Q. 1470 CYMI $________ $________
203(22) END HAUL D.Q. 752 CY $________ $________
220(02) CONTROLLED BLASTING D.Q. 30 CY $________ $________
251(01)A PLACED RIPRAP, CLASS 4,
METHOD A D.Q. 119 CY $________ $________
251(01)B PLACED RIPRAP, CLASS 5,
METHOD A D.Q. 43 CY $________ $________
252(01) SPECIAL ROCK
EMBANKMENT, ROCKERY D.Q. 12
CY
601(01) MOBILIZATION LSQ 1 LS $________ $________
603(09)A 72-IN, ALUMINUM PIPE, 12
GA, 3x1 CORR., METHOD C A.Q. 40 FT $________ $________
603(09)B
96-IN, ALUMINUM PIPE,
12GA, 3x1 CORR., METHOD C
A.Q. 58 FT $________ $________
603(11)
117-IN SPAN, 79-IN RISE,
ALUMINUM PIPE, 12GA, 3x1
CORR., METHOD C
A.Q. 50 FT $________ $________
603(21) STEEL WEIRS A.Q. 10 EA $________ $________
638(03)A CULVERT STREAMBED
MATERIAL, CLASS 9 D.Q. 76 CY $________ $________
638(03)B CULVERT STREAMBED
MATERIAL,, CLASS 12 D.Q. 16 CY $________ $________
638(05)A ROCK WEIR FRS CLASS 5 A.Q. 9 EA $________ $________
638(05)B ROCK WEIR FRS CLASS 6 A.Q. 1 EA $________ $________
638(06)A PLACED STREAMBED
ROCK, CLASS 9 D.Q. 12 CY $________ $________
638(06)B PLACED STREAMBED
ROCK, CLASS 12 D.Q. 25 CY $________ $________
TOTAL BID FOR BASE
ITEMS:
OPTION 1 – 3015250-0.030
Meth. of
Meas. Est. Qty Unit Unit Price Total Price
171(03) STAKING STRUCTURES,
PRECISION D, METHOD I LSQ 1 EA $_______ $________
202(02) REMOVAL OF CULVERTS LSQ 1 EA $_______ $________
203(08) BORROW EXCAVATION,
PLACEMENT METHOD 3 D.Q. 829 CY $_______ $________
203(21) HAUL D.Q. 141 CY MI $_______ $________
203(22) END HAUL D.Q. 301 CY $_______ $________
220(02) CONTROLLED BLASTING D.Q. 70 CY $________ $________
251(01)A PLACED RIPRAP, CLASS 4
METHOD A D.Q. 47 CY $_______ $________
252(01) SPECIAL ROCK
EMBANKMENT, ROCKERY D.Q. 17
CY
601(01) MOBILIZATION LSQ 1 LS $_______ $________
608(11)
142-IN SPAN, 91-IN RISE,
ALUMINIZED STEEL PIPE
ARCH, 12GA, 6x2 CORR., METHOD C
A.Q. 60 FT $________ $________
638(03)A CULVERT STREAMBED
MATERIAL, CLASS 12 D.Q. 46 CY $________ $________
TOTAL FOR OPTION 1
ITEMS:
OPTION 2 - 3015000-6.334
Meth. of
Meas.
Est.
Qty Unit Unit Price Total Price
171(03) STAKING STRUCTURES,
PRECISION D, METHOD I LSQ 1 EA $_______ $________
202(02) REMOVAL OF CULVERTS LSQ 1 EA $_______ $________
203(08) BORROW EXCAVATION,
PLACEMENT METHOD 3 D.Q. 381 CY $_______ $________
203(21) HAUL D.Q. 1538 CY MI $_______ $________
203(22) END HAUL D.Q. 361 CY $_______ $________
251(01)B PLACED RIPRAP, CLASS 5
METHOD A D.Q. 678 CY $_______ $________
251(13) GEOTEXTILE, TYPE II-B D.Q. 2538 SF $_______ $________
558(01)
PREFABRICATED
BRIDGE
SUPERSTRUCTURE, 40 FT
LSQ 1 EA $_______ $________
601(01) MOBILIZATION LSQ 1 LS $_______ $________
606(01) GUARDRAIL SYSTEM,
TYPE 1, CLASS A A.Q. 100 FT $________ $________
638(05)B ROCK WEIR FRS CLASS 7 A.Q. 1 EA $________ $________
638(06)B PLACED STREAMBED
ROCK, CLASS 9 D.Q. 64 CY $________ $________
TOTAL FOR OPTION 2
ITEMS: $_______
TOTAL FOR BASE AND ALL OPTIONS $______________
Vendor Name: Phone
Signature: Fax Address: Email City, State, Zip: TIN# Duns#
SECTION C--DESCRIPTION/SPECIFICATIONS
(REVISED 12/21/09)
C.1 Project Scope
a. This project is comprised of all required labor, equipment and materials necessary to perform the following work:
b. Work includes but is not limited to dewatering, installation of structures, excavation, placement of embankment, reconstructing streambed and banks with instream weirs or log structures, haul, end haul, and rock excavation.
c. Estimated Price Range: Between $250,000 and $500,000.
BASE BID
1) RD 3015000 MP 0.344
Remove and dispose of existing 3-foot diameter CMP. Furnish and install an 8-foot diameter aluminized steel pipe with streambed materials and rock steps inside the culvert.
Realign stream channel and reconstruct banks up and downstream. Regrade the channel with streambed materials and construct rocks steps downstream. Maintain existing horizontal road alignment. Install riprap slope protection.
2) RD 3015000 MP 2.641
Remove and dispose of existing 3-foot diameter CMP. Furnish and install a 9’-9” x 6’-7” aluminized steel pipe arch with streambed materials and rock steps and steel weirs inside the culvert. Realign stream channel and reconstruct banks up and downstream. Construct rocks steps downstream of culvert. Raise the road but maintain existing horizontal road alignment. Install riprap slope protection. Bedrock blasting may be required.
3) RD 3015000 MP 6.830
Remove and dispose of existing 1.5-foot diameter CMP. Furnish and install a 6-foot diameter aluminized steel pipe with streambed materials and rock steps and steel weirs inside the culvert. Realign stream channel and reconstruct banks up and downstream.
Construct rocks steps up and downstream of culvert. Revegetate banks on new channel construction. Raise the road but maintain existing horizontal road alignment. Install rockery at the inlet and riprap at the outlet for slope protection.
Option 1:
RD 3015250 MP 0.030
Remove and dispose of existing 4-foot diameter CMP. Furnish and install an 11’-10” x 7’-7” aluminized steel pipe arch with streambed materials and rock steps inside the culvert. Raise the road and provide new roadway alignment. Realign stream channel and reconstruct banks up and downstream. Install rockery at the inlet and riprap at the outlet for slope protection. Bedrock blasting may be required.
Option 2:
RD 3015000 MP 6.334
Remove and dispose of existing 3-foot diameter CMP. Furnish and install a 40-foot slab bridge with guard rails. Realign stream channel downstream and provide with streambed materials . Install geotextile fabric as shown on the plans. Reconstruct banks up and downstream of the bridge. Excavate all soft alluvial materials at the first beaver dam area and under the bridge footings and replace with suitable materials as shown. Construct new rock weir at the first beaver dam. Raise the road and install riprap slope protection.
Reseed all disturbed areas immediately after bridge construction.
C.2 Location
All the project sites are located on Northeast Prince of Wales Island, Thorne Bay area in Southeast Alaska; along roads 3015000 and 3015250. Thorne Bay is a small community with limited services. Thorne Bay road system can be accessed by the Inter Island ferry system and by floatplane.
C.3 AGAR 452.236-78 FOREST SERVICE STANDARD SPECIFICATIONS FOR
CONSTRUCTION OF ROADS AND BRIDGES (NOV 1996)
The Forest Service Specifications for Construction of Roads and Bridges, EM-7720-100 (Nov.
1996) are included by reference. The requirements contained in these specifications are hereby made a part of this solicitation and any resultant contract.
Copies of the Forest Service Standard Specifications are available from:
Government Book Store 915 Second Avenue Seattle, WA 98714 Phone: 206.553.4270 Fax: 206.553.6717
Or online at: http://bookstore.gpo.gov/
The Forest Service Specifications can also be obtained from the Forest Service Home Page on the Internet. It is in Adobe Acrobat page description format at:
www.fs.fed.us/database/acad/dev/roads/roadscon.htm
SPECIFICATIONS AND SPECIAL PROJECT SPECIFICATIONS LIST
Section 101 Abbreviations, Acronyms, & Terms Section 102 Definitions (as supplemented herein)
TNF 102.1 (02/2000)
Section 103 Intent of Contract Section 104 Maintenance for Traffic
TNF 104.1 (01/04)
Section 105 Control of Materials Section 106 Measurement and Payment R10 106.1 (05/97) http://bookstore.gpo.gov/� http://www.fs.fed.us/�
Section 171 Construction Staking, Offset L-Line Section 201 Clearing & Grubbing
TNF 201.1 (02/2000)
Section 202 Removal of Structures and Obstructions Section 203 Excavation, Embankment, and Haul
TNF 203.1(03/02)
Section 204 Soil Erosion & Water Pollution Control Section 206 Structural Excavation for Major Structures Section 206A Structural Excavation for Minor Structures Section 220 Rock Blasting
TNF 220.1 (01/04)
Section 251 Riprap
TNF 251.1 (03/02)
Section 555 Steel Structures Section 556 Bridge Railing Section 557 Timber Structures Section 558 Prefabricatedm Modular Bridge Superstructure and Substructure
TNF 558.1-1 (04/2002)
Section 563 Painting
TNF 563.1 (02/2000)
Section 601 Mobilization Section 603 Metal Pipe
TNF 603.1 (04/02)
Section 611 Development of Pits and Quarries
TNF 611.1 (04/02)
Section 625 Seeding & Mulching
TNF SPS (02/2000)
Section 638 Stream Simulation
TNF SPS 638(01/2004)
Section 703 Aggregate Section 704 Soil Section 705 Rock Section 707 Metal Pipe Section 708 Paint
TNF 708.1 (02/2000)
Section 713 Roadside Improvement Material Section 714 Geotextile, Geocompsite Drain Material & Geogrids Section 716 Material for Timber Structures Section 717 Structural Metal T.N.F. Specification 717.1 (02/2000)
SPECIAL NOTE: The above is a list of major specifications applicable to this contract. Other specifications referred to within these specifications (even though not specifically listed) are also fully applicable to the solicitation and any resultant contract.
| SCHEDULE OF ITEMS |
| Unit |
| Unit |
| Unit |
| SECTION C--DESCRIPTION/SPECIFICATIONS |
| C.1 Project Scope |
| Base Bid |
| RD 3015000 MP 6.334 |
| C.3 AGAR 452.236-78 FOREST SERVICE STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES (NOV 1996) |
| SPECIFICATIONS AND SPECIAL PROJECT SPECIFICATIONS LIST |
File details come from the government source that posted it. Updated .