Specs-_schedule_of_items.docx

DOCX document 18 KB Posted

Attached to
RECOVERY: SWAKANE ROAD DRAINAGE IMPROVEMENTS
Solicitation number
AG-0489-S-09-0040
Issued by

About this file

Project Specifications

View the file

Other files

File Type Posted
Project Specifications.doc DOC document
Swakane Road CONSTRUCTION_RFQ.doc DOC document
gooddip 4armoured.pdf PDF
gooddip 3.pdf PDF
r6-fs-6300-54.rtf RTF text file
swakane_vicinity_map.pdf PDF
FORD CROSSING.pdf PDF
Experience Questionnaire.doc DOC document
cez_gate_design.pdf PDF
title_sheet_swakane_signatures.pdf PDF
narrow spot.pdf PDF
r6-fs-6300-52.rtf RTF text file
Road_ Structure Details.pdf PDF
BORROW PLACEMENT.pdf PDF
r6-fs-6300-53.rtf RTF text file
Wage Determination.txt TXT text file
swakane_project_map.pdf PDF
RFQ.doc DOC document
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PART I - SCHEDULE OF ITEMS

SECTION B – SERVICES AND PRICES

SWAKANE ROAD RECONDITIONING - 2009

Entiat Ranger District Okanogan and Wenatchee National Forests Chelan County

B- 1 - SCHEDULE OF ITEMS

ITEM

NO.

DESCRIPTION

PAY

UNIT

EST.

QTY.

UNIT

PRICE

TOTAL

PRICE

BASE ITEMS

15101

Mobilization

Lump Sum

20420

Drainage excavation, type dip

Each

20420a

Drainage excavation, type dip - armoured

Each

20420b

Drainage excavation, type Ford

Each

21176

Area Rehab

Square Feet

30101

Aggregate base, grading D, compaction method E Commercial Source, WSDOT Class E or Equivalent.

Ton

30318

Road reconditioning, roadbed, compaction method E

Mile

8.40

20493

Unclassified Borrow

Cubic Yard

61902

Gate

Each

BASE

ITEMS TOTAL

B-2 - NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under 151.01 Mobilization.

Payment will be made on actual work performed as described in FP-03 109.01 unless otherwise noted.

SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

Scope of Contract

Swakane Road Reconditioning - 2009 This project is for the reconditioning of existing Forest Service Road 7415, 7415-617 and 7415-623 located on the Entiat Ranger District. The contractor shall furnish all the labor, equipment, supervision, transportation, supplies, and incidentals to perform all work specified herein. Work includes but is not limited to; reconditioning of roadbed, purchasing, hauling and processing crushed rock, constructing new drain dips, reconditioning existing drain dips, and furnishing and installing a gate.

Project Location

From Wenatchee, WA travel west on Highway 2 approximatley 8.7 miles to the Nahahum Canyon Road junction. Travel up the Nahahum Canyon Road approximatley 6.8 miles to the National Forest Boundary on the ridgeline and the junction of FS Road 7415 (Swakane Canyon Road). This point is Mile Post 4.20 of the Road Log for the FS Road 7415 – Swakane Canyon Road.

AGAR 452.211-72 Statement Of Work/Specifications (FEB 1988) Comment by PCxx:

**NOTE** [USE IF APPLICABLE]

The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.

AGAR 452.211-73 Attachments To Statement Of Work/Specifications (FEB 1988) Comment by PCxx:

**NOTE** [USE IF APPLICABLE]

The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.

SECTION H--SPECIAL CONTRACT REQUIREMENTS

FAR 52.236-4 Physical Data (APR 1984) Comment by PCxx:

**NOTE** [DELETE THE CLAUSE IN ITS ENTIRETY IF THERE IS NO PHYSICAL DATA TO FURNISH]

Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.

(A) Project elevation ranges from 1800’ to 5500’

(C) Normal Operating Season – May 1 through November 1

(D) Inclement weather may occur at any time. Poor working conditions due to weather, is not a basis for an excusable delay, unless approved by the CO.