r6-fs-6300-53.rtf

RTF text file 40 KB Posted

Attached to
RECOVERY: SWAKANE ROAD DRAINAGE IMPROVEMENTS
Solicitation number
AG-0489-S-09-0040
Issued by

About this file

Fire 6300-53

Text of this file

R6-FS-6300-53 (5/89)

USDA FOREST SERVICE

PACIFIC NORTHWEST REGION

FIRE PROTECTION AND SUPPRESSION

Additional Fire Precautionary Measure 1 - Tank Truck

11.

The Contractor shall provide a tank truck or trailer, containing not less than 300 gallons of water, during yarding, loading, land clearing, right-of-way clearing and mechanical treatment of slash. A tank truck or trailer will not be required if powersaw falling and bucking is the only operation. Such tank truck or trailer shall be maintained in a serviceable condition and located within 10 minutes, round trip, from each project area during fire period and closed seasonFire Period and Closed Season.

The tank truck or trailer shall be equipped with a pump capable of discharging 20 gallons of water per minute, using a 1/4 inch nozzle tip, through a 50 foot length of rubber line hose. In addition, 500 feet of serviceable fabric jacket rubber lined hose of not less than 1 inch outside diameter, fitted with a nozzle capable of discharging a straight stream of 1/4 inch diameter and a spray pattern shall be immediately available for use. The tank, pump and at least 250 feet of hose and nozzle shall be connected and ready for use at all times.

If a trailer is used, it shall be equipped with a hitch to facilitate prompt movement. A serviceable tow vehicle shall be immediately available for attachment to the trailer and must meet the time requirements stated above. Such truck or trailer shall be equipped to operate for a minimum of 8 hours. Tank truck or trailer shall be available from the start of work to the end of the Fire Watch / Fire Security service.

Other files

File Type Posted
Project Specifications.doc DOC document
Swakane Road CONSTRUCTION_RFQ.doc DOC document
gooddip 4armoured.pdf PDF
gooddip 3.pdf PDF
r6-fs-6300-54.rtf RTF text file
swakane_vicinity_map.pdf PDF
FORD CROSSING.pdf PDF
Experience Questionnaire.doc DOC document
cez_gate_design.pdf PDF
title_sheet_swakane_signatures.pdf PDF
narrow spot.pdf PDF
r6-fs-6300-52.rtf RTF text file
Road_ Structure Details.pdf PDF
Specs-_schedule_of_items.docx DOCX document
BORROW PLACEMENT.pdf PDF
Wage Determination.txt TXT text file
swakane_project_map.pdf PDF
RFQ.doc DOC document
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .