Misc Documents - Riley Pass Road Maintenance.pdf

PDF 15 MB Posted

Attached to
CUSTER NATIONAL FOREST Riley Pass Road Maintenance
Solicitation number
AG-0355-S-08-0027
Issued by

About this file

Misc Documents - Riley Pass Road Maintenance

View the file

Other files

File Type Posted
AG-0355-S-08-0027-0001.pdf PDF
SF 24 Bid Bond.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

£¤85

£¤85

CAMP CROOK, SD

BUFFALO, SD

LUDLOW, SD

TO BOWMAN, ND

TO BELLE FOURCHE, SD

TO BELLE FOURCHE, SD TO NEWELL, SD

North Dakota South Dakota

SLIM BUTTES

NORTH CAVE HILLS

SOUTH CAVE HILLS

WEST SHORT PINES

EAST SHORT PINES

²OWNERSHIP

Legend

ROADS

ForestState County/Other Public

NO SCALE

VICINITY MAP

Custer National Forest Sioux Ranger District South Dakota Portion jormes Callout

PROJECT AREA

jormes Line jormes Line jormes Line

38500

31304 31304A

331302

31305

31239

312310

31239A

31235A 312

34 3120A

31231

31236

312731271

31238

3B

3C 31233D

31233E

31233

31233A 3123A

31142

31143 3114

31144 31141

3CNTY_TUFTE31145

3CNTY733

31315313 1 31311

31281

31232

31313

312310A

31239

3CNTY_TUFTE

²1:63,360

OWNERSHIP

forest state

Legend Decommissioned National Forest System Undetermined/Non-system

Private State

ROADS SCALE

County/Other Public jormes Callout

END ROAD #3120

jormes Callout

INSTALL CATTLEGUARD

jormes Callout

REMOVE AND REPLACE CULVERT

jormes Text Box

LOCATION MAP

RILEY PASS ROAD MAINTENANCE

NORTH CAVE HILLS, SOUTH DAKOTA

jormes Callout

BEGIN ROAD #3120

jormes Line jormes Text Box

TO HIGHWAY 85,

APPROX. 8 MILES

jormes Line jormes Text Box

TO HIGHWAY 85, APPROX. 4 MILES

jormes Text Box

SEE ROAD LOG FOR DETAILED WORK DESCRIPTIONS

Base Item 1 - Riley Pass Road 3120

Milepost Work Needed

0.00 FS Boundary - North End of Road

Begin Blading, Blade Road to 16' Width (Subgrade), Begin Spot Surfacing - As Staked - 14' Surface width, 4" Compacted Depth

0.05 Maintain Turnout Right and Surface

0.17 Maintain Turnout Right and Surface

0.27 Maintain Turnout Left and Surface

0.33 Maintain Turnout Right and Surface

0.46 Maintain Split Turnout and Surface

0.49 Maintain Split Turnout and Surface

0.65 Maintain Turnout Right and Surface (On Curve)

0.67 Maintain Lead Off Ditch off curve right

0.78 Re-establish full width Turnout through cattleguard and through cut.

0.781 End thru cut

0.82 Maintain Turnout Right and Surface

0.91 Maintain Turnout Right and Surface

0.94 Jct 3130 left- Maintain Approach - 24' width x 50' long. Surface approach intersection

0.94 Maintain 24' Road Width on Curve and Surface

1.11 Jct to Pond 3 on Right.

1.14 Maintain Turnout Left and Surface

1.28 Remove brush in ditch left

1.45 Construct Turnout Right and Surface

1.56 Maintain Turnout Right and Surface

1.63 End Surfacing - Continue Blading

1.65 Maintain Turnout Right

1.82 Begin Surfacing - 14' Surface width, 4" Compacted Depth

1.80 Maintain Turnout Left and Surface

1.95 Maintain Turnout Left and Surface

2.02 Maintain Turnout Left and Surface

3.23 FS Boundary - South End of Road - End Base Item 1

ROAD LOG - RILEY PASS ROAD MAINTENANCE

Additive Item 1 - Culverts on Riley Pass Road # 3120 Milepost Work needed

0.00 FS Boundary - North End of Road

0.26 18" CMP, clean and install T post

0.31 CMP for Pond 1, clean and install T post

0.44 CMP for Pond 2, clean and install T post

0.73 Furnish and Install 15"x 21" x 40' CMPA and install T post

0.94 Furnish and Install 15"x 21" x 40' CMPA and install T post. (In Approach)

1.09 Furnish and Install 15"x 21" x 40' CMPA and install T post.

1.29 Furnish and Install 15"x 21" x 40' CMPA and install T post.

1.38 Furnish and Install 15"x 21" x 32' CMPA and install T post. Construct Lead Off Ditch Right

1.48 Furnish and Install 15"x 21" x 34' CMPA and install T post. Tie to Existing Lead Off Ditch Right

1.63 CMP, clean and install T post

1.70 CMP for Pond 5, clean and install T post

1.90 42" CMP - clean and install T post

2.00 CMP - clean and install T post

2.15 Furnish and Install 15"x 21" x 34' CMPA and install T post. Construct Lead Off Ditch Left

3.23 FS Boundary - South End of Road - End Road # 3120

Additive Item 1 - Culvert on Craig Pass Road # 3131 Milepost Work needed

0.00 Jct Road 733

Begin Spot Surfacing - As Staked - 14' Surface width, 4" Compacted Depth

2.88 Furnish and Install 29"x 42" x 40' CMPA, remove and reuse end sections, and install T post Place aggregate surfacing over culvert (Approx. 10 CY) End Additive Item 1

ROAD LOG - RILEY PASS ROAD MAINTENANCE

File details come from the government source that posted it. Updated .