Amend1MP3.4PipeThickness.doc

DOC document 60 KB Posted

Attached to
Nez Perce-Clearwater NFs - Soda Creek Culvert Replacements
Solicitation number
AG-02RC-S-15-0074
Issued by

About this file

Amendment 1 to clear up inconsistency regarding pipe thickness.

View the file

Other files

File Type Posted
Soda_Trib_1172-3.5_PLANS.pdf PDF
SODA_TRIB_1172-3.4_PLANS.pdf PDF
SodaConRFPdocx.docx DOCX document
Soda_Trib_1172-3.4_FSSS.pdf PDF
Soda_Trib_1172-3.5_FSSS.pdf PDF
SignedCoversheetsSodaCreek3.4and3.5.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE
PAGE OF PAGES
1
1
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
4. REQUISITION/PURCHASE REQ. NO.
5. PROJECT NO. (If applicable)
1
6/2/2015
6. ISSUED BY
CODE
7. ADMINISTERED BY (If other than Item 6)
CODE

USDA - Forest Service

Idaho Montana Acquisition Team

Nez Perce-Clearwater NFs, Grangeville Office 104 Airport Road

Grangeville, ID 83530 USDA - Forest Service

Idaho Montana Acquisition Team

Nez Perce-Clearwater NFs, Grangeville Office 104 Airport Road

Grangeville, ID 83530

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code)
(X)
9A. AMENDMENT OF SOLICITATION NO.

AG-02RC-S-15-0074

9B. DATED (SEE ITEM 11)

5/15/2015

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE
FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, FORMCHECKBOX is not extended. Offerors need not return a copy of this amendment with their offer. See Block 14.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 0 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: 52.211.18 THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN

THE CONTRACT ORDER NO. IN ITEM 1 and 2.

FORMCHECKBOX

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

FORMCHECKBOX

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor FORMCHECKBOX is not, FORMCHECKBOX is required to sign this document and return 0 copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.

SODA CREEK CULVERT REPLACEMENTS

Nez Perce Clearwater National Forests; Salmon River Ranger District

1. Amend Sheet 6, Typical Section, of the Soda Creek Tributary AOP Culvert Replacement, NFSR 1172 MP 3.4 as follows. Correct the thickness of the pipe. Current note in upper right hand corner of Sheet notes in parentheses “min 0.109 inch thick”. Strike 0.109 and replace with 0.138.

**This amendment removes any question regarding the thickness of the pipe but is not a material change since the Schedule of Items B-1 and Description of Work in Section C both state the correct thickness and take precedence over the Drawings per clause I-19 Order of Precedence – Construction. Therefore, offerors need not return a copy of this amendment with their offer.

15A. NAME AND TITLE OF SIGNER (Type or print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

KAREN RUKLIC, CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR
15C. DATE SIGNED
16B. UNITED STATES OF AMERICA
16C. DATE SIGNED

(Signature of person authorized to sign)

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

30-105
STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

File details come from the government source that posted it. Updated .